heat interval 中文意思是什麼

heat interval 解釋
發情間隔
  • heat : n 1 熱;熱力;熱度;熱量。2 體溫;發燒。3 (氣候的)高溫,暑氣。4 【冶金】熔煉的爐次;裝爐量;一...
  • interval : n 1 (空間方面的)間隔;空隙。2 (時間方面的)間隔,間歇;工間休息,幕間休息。3 【軍事】(各小隊...
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限元模擬計算程序,在程序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低混凝土的澆築溫度、夏季混凝土表面噴水霧、施工汛期壩頂面過水等。
  2. In the paper, not only such factors as reinforcing steel bar, various placing temperature of concrete in case of lift placements, lift thickness, time interval between lifts, the variation of elastic modules of concrete, heat of hydration, the temperature changes of environment but the effect of creep deformation and autogenous volume change on the temperature field and thermal stress field of reinforced concrete face - slab are considered

    本論文在分析中,考慮了鋼筋、混凝土分層澆築、入倉溫度、澆築層厚、施工間歇、混凝土彈性模量變化、水化熱發散規律、外界氣溫等因素的變化及混凝土徐變和自生體積變形等因素對面板溫度場和溫度應力的影響。
  3. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。
  4. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  5. The effect of compound casting technology and compound modification on the properties of high speed steel roll collar was studied. the results showed that compound high speed steel roll collar with high and even hardness and good bond between outer and inner layers could be gained when the modified colbalt free high speed steel in outer layer and nodular iron inner layer in connection with appropriate rotational speed of centrifugal machine, pertinent pouring interval between two kinds of the melt and moderate pouring temperature as well as surface induction heat treatment were chosen. it is indicated in industrial use that the service life of compound roll collar is higher by 5 times than that of high chromium cast iron collar

    研究了離心復合鑄造工藝和復合變質處理對高速鋼輥環性能的影響,結果表明,選用變質高碳無鈷高速鋼作外層,用球鐵作內層,選擇合適的離心機轉速、兩種金屬熔液澆注間隔時間和澆注溫度,結合採用表面感應熱處理工藝,可獲得硬度高、均勻性好、內外層結合良好的高速鋼復合輥環,用於工業生產其使用壽命比高鉻鑄鐵輥環提高5倍以上。
  6. In this article, according to heat conduction theory and finite element theory, the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, thermal insulation change, surrounding temperature change and water storage on temperature field in the arch dam are also considered

    論文根據熱傳導理論及有限元理論,用三維有限元浮動網格法對施工期和運行期溫度場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、絕熱溫升過程及壩體材料分區、水庫分期蓄水和環境溫度變化等因素對壩體溫度場的影響。
  7. It applies an interval method to select element in the evolutionary structure optimization method ( eso ), and recovers or deletes element by the “ birth and dead ” function of element. another method viewed as second order smoothing technique for suppressing the checkerboard patterns has been proposed based on the filtering function ’ s principle. then the above methods are applied to solve a temperature - controlling problem in the steady heat conducting field and a multi - objective topology optimization problem considering multiple load cases and coupled effect

    本文基於ansysparametricdesignlanguage ( apdl ) ,提出漸進結構法中應用區間法進行單元的篩選,通過單元「生死」的功能實現單元的恢復與刪除,根據濾波函數法原理提出修改的二階棋盤格處理方法,並就穩態熱傳導溫度控制問題,考慮熱、力耦合的多載荷工況的多目標拓撲優化設計問題進行求解。
  8. The results show time interval of atmospheric forcing gives rise to significant difference in net solar radiation and latent heat in siberia area

    西伯利亞地區的單點試驗表明不同時間間隔的邊界強迫對地表吸收的凈短波輻射和釋放的潛熱影響較大。
  9. The heat balance method is used to establish heat loss calculating model and to find an optimal interval of soot blowing which is most economic. in this way, no additional measure points are needed

    文中所用優化方法運用熱平衡方法建立熱損失計算模型,根據經濟性原則確定最佳吹灰時間間隔,來制定最佳吹灰方案。
分享友人