high arch 中文意思是什麼

high arch 解釋
高足弓
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • arch : n 1 【建築】弓架結構;拱廊;拱門;弓形門;穹窿,拱洞,拱頂。2 弓形,半圓形。vi 1 【建築】作(成)...
  1. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次系統地對高拱壩壩身泄洪孔口、泄流過程以及壩下水墊塘的布置優化問題進行了討論。主要內容和成果有1
  2. Oil gas formation mechanism of kendong high arch

    墾東高凸起油氣成藏機制研究
  3. Three - dimensional nonlinear analysis of orifice of high arch dam

    混凝土高拱壩孔口三維非線性分析
  4. Fault tree analysis is used to analyse the high arch dam risk

    摘要利用故障樹分析法對高拱壩進行風險分析。
  5. Study on plunge pool concrete lining stability for flood dischare of a high arch dam

    高拱壩泄水墊塘襯砌穩定性研究
  6. Reinforcements across contraction joints of high arch dams to resist strong earthquakes

    強震區高拱壩橫縫配筋抗震措施
  7. Engineering measures for prevention of cracking and yielding of high arch dams

    防止高拱壩壩踵開裂和屈服的工程措施研究
  8. Application of locally incompatible meshes to stress analysis of high arch dams

    局部非協調網格在高拱壩應力分析中的應用
  9. Effect of unsymmetrical solar thermal radiation on thermal stresses of high arch dams

    左右岸日照差異對高拱壩下游壩面溫度應力的影響
  10. The analysis of high arch dam including cross - joint should be considered as a 3d elasto - plastic contact problem

    考慮橫縫的高拱壩結構分析本質上應按三維彈塑性接觸問題進行。
  11. Along with the westward exploitation putting into practice, to make use of existing natural resources, several high arch dams will be built in the southwest of china where water resource is rich

    隨著西部大開發的實施,為了充分利用現有的自然資源,我國將在水力資源豐富的西南地區修建一批高拱壩。
  12. Built of marble and white stone, the jade belt bridge has a high arch and is one of the six bridges on the western shore on kunming lake

    昆明湖西堤的六橋之一玉帶橋。拱形的橋身橋欄用青白石和漢白玉雕砌,宛如玉帶。
  13. The scale and height of rolling - concrete are spread increasingly, such as the technique studied recently that the 300 meters high gravity dam and the 200 meters high arch dam, which requires more experience in the damming technique, construction crafts and mechanization

    目前,碾壓混凝土壩的規模和高度正在日益擴大, 300m級的碾壓混凝土重力壩和200m級的碾壓混凝土拱壩的研究正方興未艾,對碾壓混凝土築壩技術、施工工藝和機械化程度的要求也更高。
  14. Built of marble and white stone, the jade belt bridge has a high arch and is one of the six bridges on the west shore on kunming lake

    昆明湖畔的鎮水銅牛鑄於一七五五年,背上鑄有八十字的篆書銘文。
  15. In general, both of them are used to verify the results. using geomechanical model test method, the overloading process and wreck character of high arch dam was emulated completely for tengzigou arch dam. it is emphasized for stabilization safety evaluation various major loading function of high arch dam must be accounted and arch dam ' s whole stability is the most important

    本文用地質力學模型試驗方法分析了藤子溝拱壩的超載過程和破壞特徵,並強調無論是超載試驗還是超載計算分析,在評價拱壩安全度時都應綜合考慮各種影響拱壩受力的主要荷載因素,以拱壩整體工作能力作為評價依據。
  16. Some primary researches are given in this paper, combined with the project - stability evaluation of concrete high arch dam of tengzigou, which is cooperated between hydraulic structure center of hohai university and dongbei hydroelectric investigation & design ltd. considering actual research work and specification, either concrete strength limit analysis of dam or shear failure of seams in rock abutments are taken singly into account for safety evaluation of high arch dam

    本文就這個問題,結合河海大學水工結構所和水利部東北勘測設計研究有限責任公司的合作項目?藤子溝水電站雙曲拱壩整體穩定性分析,在這方面做了一些初步研究。現行規范將壩體混凝土強度校核和壩肩穩定安全度評價分開進行,沒有考慮兩者的關聯性,然而這兩類破壞常常是相互聯系,伴隨發生的。
  17. Because its complex of mechanics characteristic, shape of geometry and boundary condition, safety of the high arch dam under normal load is what engineers are concerned about

    因其受力特徵、幾何形狀、邊界條件等均較復雜,所以,高拱壩在正常荷載作用下的安全度,無疑是工程設計人員所關心的主要課題。
  18. A mathematic model is first introduced for optimizing the layout of flood - release structures in a high arch dam after an idea of the broad sense of construction costs for unit area gate is introduced, and the optimal computation of the layout of flood - release structures in xiao - wan arch dam demonstrates that this model is reasonable ; 4

    在引入了閘門廣義單位面積造價的基礎上,首次建立了高拱壩壩身泄洪建築物布置的數學優化模型,並通過對小灣拱壩壩身泄洪孔口的優化布置計算,說明所提出的數學優化模型是可用的; 4
  19. However the experience about design of high arch - darn is not enough in deep valley, especial when the dam is located in the areas of intensive earthquake. therefore the study of three dimension earthquake response is great significant in reality and history to the hydroelectric construction

    然而,由於缺乏在河谷高寬比大的高拱壩設計經驗,特別是在高地震烈度區修建高拱壩,因此,本項目的研究分析具有十分重要的現實意義。
  20. The arch dams locate at such areas which have high mounain, deep valley, steep slope, narrow riverway and high seismic intensity. the aseismic capabilities of high arch dams have relationship with lives and properties of people and productions of industry and agriculture, so the eanhquake becomes the main factor of arch darns design

    這些大壩所在地區山高谷深,岸坡陡峻,河道狹窄,地處高地震烈度區,高壩的抗震性能關繫到下游廣大地區工農業生產和人民生命財產的安全,考慮地震因素成為大壩設計中的控制工況。
分享友人