high flood 中文意思是什麼

high flood 解釋
高潮
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限元模擬計算程序,在程序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低混凝土的澆築溫度、夏季混凝土表面噴水霧、施工汛期壩頂面過水等。
  2. The dissertion, after introducing physical geography situation and societal economic sitiuation of chongqing, has also analysed the basic feature of water resources in chongqing, at present the water resources utilization in chongqing is still in traditional phase. there are so many faults and shortcomings in water resources management system. the construction of water resources institutions and regulations is fallen behind. the supply of water resoures has not sufficiently satisfied the demand to water resources. the condition of water quality has not radically improved. soil losses is still serious. the incidence of flood and drought is very high. in accordance with present condition of water resources utilization in chongqing, the dissertion argues that it should strengthen people ' s understanding to water resources sustainable utilization for chongqing ; reform the present water rexources management system and have a try on water affairs management system in chongqing ; make effort to construction of water resources " institutions and regulations ; realize demand management, constuct save - water model society ; according to actual condition, strength water utilization constrution, then realize the balance between water resources supply and demand ; according to the idea of " control resources, conduct flow ", control water pollution, realize sanitary generation ; control soil losses and protect water enviroment ; construc t the system of flood control and diaster prevent

    在對重慶市的自然地理情況和社會經濟情況作了介紹之後,還分析了重慶市水資源的基本特徵,目前重慶市的水資源利用還處在傳統的開發利用階段,水資源管理體制還存在許多弊端,水的法規制度建設也相對落後,水的供給還不能完全滿足需求,水質狀況沒有得到根本性的改善,水土流失還很嚴重,水旱災害發生的頻率比較高。針對重慶市水資源利用的現狀,本文提出:應加強對水資源持續利用的認識;改革目前重慶市的水管理體制,嘗試水務局管理體制,相應加強水的法規和制度建設,實現需水管理,建立節水型社會;根據實際情況,加強水利建設,實現水的供需平衡;依據「控源導流」的思想控制水污染,實現清潔生產;治理水土流失,保護水環境;建設防洪減災體系。
  3. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河水位的水沙因素,及僅用水沙因素有效研究水位的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應水位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類洪水相應水位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應洪水位過程的擬合誤差都較小;最後,明確黃河下游含沙量對水位的主要影響方式,即含沙量主要是與其它因素聯合對水位作用;另外分析了要實現變動河床洪水位過程準確預報的困難所在及改進方向。
  4. The wushan bank of three gorges reservoir has been divided into floodplain section, changing section from high level to below level and above flood level section

    針對水庫庫岸再造預測的特點,將三峽庫區巫山縣段的巖質庫岸劃分為漫灘段、枯洪水位變幅帶、常見洪水位以上段3種類型。
  5. In recent years, the water - saving and control irrigation technique of rice has diverted from plot experimental and demonstration to lare scale. and has got remarkable economic and social benefits. amed at the characteristics of this irrigation area, optimal selection for water - saving techniques of rice, deciding the amout of leaching water and irrigation modles, investigating the adaptability of the water - saving and control irrigation technique in saline land. studying the increase in production mechanism of the technique are important to extend the technique, to better and develop saline land as well as slick spots. according to the results of field experiments, optimization study was conducted on the water - saving irrigation technique of rice in saline land, the effects of different water - saving irrigation techniques on the physiological indexes and yield of rice were systematically analyzed. by using mutiplepurpose fuzzy optimization method, better. water - saving irrigation technique was selector out, that is. the control irrigation technique in rice. the mechanism of it was analyzed from the aspect of the physiological and ecological saving water of rice to provide the implemental process and technical point ; throgh the quantitive analysis and comparision on control irrigation and control class ( flood irrigation ), high production and quality mechanism of the technique was analyzed in terms of physiology indexes of rice, the variation of soil moisture, the pest resistance and the lodge resistance, the change of soil temperature in paddy fields. the yield constitutive factors, the quality of rice and so on. in saline land. control irrigation and intermittent leaching modles were adopted to validate the adaptability of the technique in irrigation of rice in saline land, to analyze rice ' s physiological - ecological indexes and the change of soil salt content under the conditions of control irrigation leaching of rice and and to provide control irrigation and combined modle of intermittent leaching to adapt to different conditions

    本文從試驗及試驗資料入手,取得以下主要成果和結論:對鹽堿地水稻節水灌溉技術進行優化研究,系統地分析了不同節水灌溉技術對水稻生理指標及產量的影響,採用了多目標模糊優化的方法,對灌水技術進行綜合評判,優選了節水灌溉技術,論證該地區宜採用水稻控制灌溉技術;闡述控灌技術通過調節和控制水稻的需水規律,降低水稻高產情況下的無效水量消耗,從水稻生理、生態節水兩方面分析了控灌技術節水機理,針對性地總結出水稻各生育期實施節水控灌技術的步驟及技術要點;通過控灌與淹灌的定量對照比較,從根系、莖蘗、冠層葉片及綠葉動態到株高,土壤水分變化,抗病蟲害、抗倒伏能力,稻田土溫變化,產量構成因素及稻米品質等諸多方面進行動態比較,分析控灌技術高產優質機理;在鹽堿稻地採用控制灌溉+間歇淋洗模式,跟蹤測試田間水鹽變化狀況,驗證控制灌溉技術在鹽堿地區水稻灌溉中應用的適應性,通過分析水稻控制灌溉淋洗條件下水稻生理生態指標,提出優化控制灌溉+間歇淋洗組合模式,為進一步在高礦化度地區試驗水稻控灌技術奠定基礎。
  6. During the reform and opening flood period, this company always acts as a helmsman, maintaining a high development speed

    在改革開放的浪潮中,公司一直充當著弄潮兒的角色,保持著高速發展的良好勢頭。
  7. His high spirits flood her and cheer her.

    他興高采烈的神情感染了她,使她也快活起來。
  8. During flood years, the center of negative anomaly is around ural mountains, the center of positive anomaly is around high - latitude of east asia and another negative and positive center are over okhotsk sea and the north - west pacific, respectively

    通過對夏季旱澇等級指數的morlet型和mexicanhat型小波變換分析,發現山東夏季旱澇指數主要存在著2 5年和7年左右的周期振蕩。
  9. Application of high - pressure jet grouting in flood underflow project, xiyang county

    高壓噴射灌漿技術在昔陽縣洪水潛流二水源工程中的應用
  10. Application of the art of anti - seepage wall by jet cement with high pressure in flood control project

    高壓噴射注漿法在公路工程施工中的應用
  11. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集水面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精度較高,設計的洪水流量一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  12. Because of the unreasonable operation mode, the reservoirs sedimentation is serious, which lead to the problems of inadequate use of water resource, degressive works benefit and high risk in water works operation and flood control in this area

    但長期以來,由於運用方式不合理,水庫工程泥沙淤積嚴重,徑流資源得不到充分利用,工程效益逐年衰減,並對工程運行和地區防洪安全形成嚴重威脅。
  13. The experiments of high speed milling of titanium alloy were conducted under different cooling and lubricating modes, i. e. dry milling, flood coolant, oil mist with nitrogen gas, cryogenic nitrogen gas jet, and cryogenic nitrogen gas jet with minimal quantities of lubricant

    在干銑削、澆注切削液、常溫氮氣油霧、低溫氮氣射流和低溫氮氣射流結合微量潤滑等冷卻潤滑條件下進行了鈦合金的高速銑削對比試驗。
  14. Study on plunge pool concrete lining stability for flood dischare of a high arch dam

    高拱壩泄水墊塘襯砌穩定性研究
  15. The local flood prevention sectors have maintained high alert to ensure the safety of shanghai

    據悉,上海各級防汛部門保持「臨戰狀態」 ,確保上海安全度汛。
  16. Abstract : monthly rainfall data from 1951 to 1995 for june, july and august in 13 meteorological stations of the north china were used for accounting z index and discussing serious flood and drought featureas in these months. serious flood mainly happened in july and august, and sevious drought mainly happened in august. there were more flood in 1950 ' s to 1960 ' s and more drought since 1970 ' s in the north china. meanwhile, the deeper trough which covered the regions from the ural mts. to the balkhash lake play an important role in serious rainstom in rainy season in the north china. there often happened serious flood ( drought ) when the northwester pacific subtropical high was by west and north ( east and south ), and the sea surface temperature in the equatorial central and eastern pacific was mainly in dropping ( raising ) stage

    文摘:利用華北平原地區的13個站點, 45年( 1951 1995 )的降水資料,對夏季4個時段( 6月、 7月、 8月、 6 8月)進行了z指數計算,確定了該地區各個時段的嚴重澇年和嚴重旱年.發現華北地區雨季的嚴重洪澇主要集中在7 , 8月,嚴重乾旱則主要發生在8月,並可明顯看出由50 60年代的多水期向70年代中期以後的少水期的轉變,另外,烏拉爾山到巴爾喀什湖附近的低壓槽加深和西北太平洋副熱帶高壓的北抬,對華北地區雨季持續性暴雨的產生起著決定性的作用.嚴重洪澇年的夏季( 6 8月) ,西北太平洋副熱帶高壓偏西、偏北,赤道東太平洋海溫多處于下降階段;嚴重乾旱年西北太平洋副高偏東、偏南,赤道東太平洋海溫則處于上升階段
  17. After liberation, our governments at all levels pay high attention to the - flood control of the yellow river

    在各級政府和治黃專業部門的不懈努力下,黃河得以在五十多年安瀾。
  18. The yarkant river flood dynamic rule is extremely complex, extremely high rises the speed by it, the unusual high flood peak value is world famous

    摘要葉爾羌河洪水動態規律極為復雜,以其極高的起漲速率、異常的高洪峰值聞名於世。
  19. Soil embankment is widely used in water conservancy and flood prevention projects because of its being able to drawing on local resources and other advantages. how to analyze and calculate the seepage and stabilities of levees under high level flood reasonably, and supply reliable technological support for dangers removing and strengthening are of great engineering significances

    土質堤防因具有能就地取材等優點而為水利及防洪工程廣泛採用,合理分析與計算高洪水位作用下堤防的滲流及穩定性、為除險加固提供技術支撐具有重要的工程實際意義。
  20. Determination of roughness for open canal steady nonuniform flow during high flood

    面積法高洪糙率的確定
分享友人