high pressure water pipe 中文意思是什麼

high pressure water pipe 解釋
高壓沖水管
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • pressure : n 1 壓;按;擠;榨。2 【物理學】壓力,壓強;大氣壓力;電壓。3 精神壓力,政治[經濟、輿論等]壓力。4...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  1. Pipe bundle cleaning by high pressure water jet

    管束的高壓水射流清洗
  2. For the purpose of solving the interconnection of the heating supply between the small high - rising building and multi - storied building, this paper advances that the pressure fixing system on the by - pass pipe should be used in the secondary network system, and probes into the pressure regulating range of the water replenishing and pressure fixing system on the by - pass pipe

    為了解決小高層和多層建築的供熱並網問題,提出了將旁通管定壓系統應用於二次網系統中,並對旁通管補水定壓系統調壓幅度進行了探討。
  3. By this way, however, the working pressure of the fire water system will be at higher level in case of the central stabilizing high pressure system and undesirable consequences related to the pressure - acceptance of the pipe and the joints shall come forth

    而在集中穩高壓給水系統中,這樣確定的穩壓泵揚程及設定壓力值,往往使消防給水管網始終處于較高壓力工況,因而使管網內水壓與管道及其介面的承壓能力這一對矛盾趨于突出。
  4. To the steam generator a heat exchanger, which converts the feed water in the secondary circuit to high - pressure steam at about 67 bar or 6 700 kpa and deliver it to the " conventional island " via steam pipe for driving the turbine and generator

    內的高壓水帶到蒸汽發生器即熱交換器,蒸汽發生器會將二迴路給水轉化為約67巴或6 700千帕的高壓蒸汽,再經過蒸氣管送到常規島,以推動渦輪發電機。
  5. To the steam generator ( a heat exchanger ), which converts the feed water in the secondary circuit to high - pressure steam at about 67 bar ( or 6 700 kpa ) and deliver it to the " conventional island " via steam pipe for driving the turbine and generator

    內的高壓水帶到蒸汽發生器(即熱交換器) ,蒸汽發生器會將二迴路給水轉化為約67巴(或6700千帕)的高壓蒸汽,再經過蒸氣管送到常規島,以推動渦輪發電機。
  6. Lithium bromide - water refrigerator with heat pipe driven by waste heat of flue gas transfers waste heat from flue gas to high pressure lithium bromide - water generator by high efficient heat pipe heat exchanger. at present, prototype has been in use. the mature software has not existed for the complicated system design

    煙氣驅動的熱管廢熱溴化鋰製冷機利用高效的熱管溴化鋰廢熱發生器將廢煙氣中的廢熱熱量傳遞到溴化鋰製冷機中,目前煙氣驅動的熱管廢熱溴化鋰製冷機已生產出樣機,處于使用階段。
  7. For example, the condenser algorithm considered the trouble condition such as the leak of tube, fail of seal in vacuum system, the lower shaft sea - ting steam pressure, pollute of tube, the high water level of hot - well. the heater algorithm considered the trouble condition such as the leak, pollute of feed - water pipe and high water level of heater

    如凝汽器演算法考慮了銅管泄漏、真空系統密封不嚴、軸封蒸汽壓力低、銅管結垢污染、熱井水位過高等故障項目,加熱器演算法考慮了給水管道泄漏、給水管道污染、結垢、加熱器水位過高等故障項目。
  8. This pe - rt pipeline system is a high temperature resistant polyethylene pipe, the pipe is extruded from pure pe with super properties, such as water pressure resistance and unique formation

    各種產品均可用於住宅冷熱水管道系統;工業用水及化學物質輸送、排放;純凈水、飲用水管道;飲料、藥物生產輸送系統;以及滿足其他工業、農業用管的需要。
  9. The application of heat pipe type water supply preheater in oil field high - pressure direct current boiler

    熱管式給水預熱器在油田高壓直流鍋爐上的應用
  10. Full size orifice - series 288a has a full - size orifice to assure pipe size capacity. water passages are streamlined to provide high water flow with minimal pressure loss

    全通徑管口-系列288a具有全通徑管口,確保管道通徑的性能。水路都是流線型的,水流順暢,壓降最小。
  11. Full size orifice - all series n388 valves have a full - size orifice to assure pipe size capacity. water passages are streamline to provide high water flow with minimal pressure loss

    全通徑噴嘴-所有系列n388閥門都有一個全通徑噴嘴以確保管道口徑的通過能力。水流道為流線型,在壓降最小前提下實現高流量。
  12. This article links to the plant no. 6 project, studying the measure of pressure reduction and energy removal of large caliber and long distance water delivery pipe in big difference of elevation and topographical form area. the writer gives new measure of pressure reduction and energy removal, according to the theory of pressure reduction and energy removal, planning a composite energy removal construction, and put to use effectively in many water supply projects. it is the first example that people use concrete construction to remove high pressure in large caliber and long distance water pipe in china

    本文結合西寧市第六水源工程,對高差大、地形地貌復雜地區大口徑長距離輸水管道消能減壓措施進行了研究探討,提出了全新的減壓消能方案,根據減壓消能原理,自行設計出了綜合式消能構築物,並應用於多項輸水工程中,效果良好,成為國內首例採用鋼筋混凝土構築物消除大口徑長距離輸水管道較高壓力的案例。
分享友人