highway capacity 中文意思是什麼

highway capacity 解釋
公路通行能力
  • highway : n. 1. 公路,大路 (opp. byway)。2. 交通干線;正路,直路。3. (達到目的的)途徑。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. And the deficiencies are pointed out in present researches, such as highway capacity, level - of - service, influence factor of road alignments, etc. from these, it has confirmed that the thesis should be studied from rational analysis, quantitative analysis of level - of - service, impact on capacity of road alignments, setting - up simulation model, etc. the high - accuracy gps dynamic data acquisition appearance is proposed to be used for the first time to carry on the experiment of overtaking on two - lane highways, and experiment scheme is designed according to the driver ' s perceive to judge each overtaking course. based on the experiment data, it can get two important parameters of acceptant gap ? the critical gap of overtakable time headway and returnable time headway through data processing, which can offer the strong support to the research of two - lane highway capacity with qualitative and quantitative analysis. besides, the experiment methods is provided to observe overtaking ratio and to measure the

    研究中首次提出了運用高精度gps動態數據採集儀對雙車道公路上的超車行為進行觀測,設計了根據駕駛員感受度來衡量超車過程的實驗方案,並通過後期數據處理得到了超車過程中兩個重要的可接受間隙參數-可超車車頭時距和可回車車頭時距的臨界間隙值,為定性和定量分析雙車道公路通行能力提供有力的數據支持;同時,還提出了觀測超車率的實驗方法以及測量加速度干擾的實驗方案,統一了計算加速度干擾的時間統計間隔,為雙車道公路的服務水平量化研究奠定基礎;最後還簡單介紹了駕駛員問卷調查法和模擬程序中模型參數標定和驗證的數據採集方法。
  2. Located in the longjiang section of national highway 325 in foshan city in the pear river delta with developed industry, our factory is engaged in the production of totally - enclosed maintenance - free storage battery and dry - type lead acid storage battery, and designs and manufactures serial products in order to meet the present and future higher requirements. at present our factory has five major brands " jianfeng, aofeng, gangling, weiling, wangpu ", those products are known for their quick - start, large capacity and convenient use in the market, and are highly praised by vast motorcycle users and professionals

    我廠位於工業發達的珠江三角洲佛山市龍江段325國道旁,是一家從事生產全密封免維護蓄電池和干荷式鉛酸蓄電池,是為了滿足現在和未來更高要求面設計製造的系列產品,本廠現有「尖鋒、澳鋒、港靈、威靈、旺普」五大品牌,該產品在市場以其啟動快捷、容量強勁,使用方便而著稱,深受廣大摩托車用戶和專業人士一致好評。
  3. The highway are widened and reinforced intensity and heavy repaired on the basis of old highway, so that the highway can be improved the level and the traffic capacity in shenyang city even all over liaoning province in last few years

    從沈陽市乃至遼寧省近幾年公路建設來看,主要採取在原有路線的基礎上進行加寬、補強改建和大修,以此來提高公路的等級,增大通行能力。
  4. On the basis of practice and checkout of stylebook, the feasibility of evaluating the highway bridge ' s carrying capacity based on bp neural network is proved

    通過樣本的訓練和檢驗,驗證了利用bp神經元網路理論進行橋梁承載力評估的可行性。
  5. If the structure reliability of the existing arch - bridges is analyzed and its current and future reliability level on bearing capacity is presented, it will profit the highway development and administration department in making an economic and reasonable decision on the maintenance of the arch - bridges

    對在用拱橋的結構性能進行可靠性分析,給出其現在以及今後一段時間內的承載力可靠度水平,有利於公路建設和決策部門對拱橋的維護工作做出經濟合理、切實有效的抉擇。
  6. It is one foundational work of large - scale construction and enormous investment. the departments of the highway design must be required to make decision according to the indexes, such as rational highway capacity, level of service and road alignments, etc. if not, the huge wasting and back - end ecocatastrophe will be brought

    這是一項建設規模宏大、投資規模巨大的基礎工程,要求各級部門在公路設計時,必須依據合理的公路通行能力、服務水平、道路線形等指標來確定,防止工程投資的巨額浪費和後期的生態災難。
  7. Research on the structure adjustment of highway freight capacity in hubei province

    湖北省公路貨運運力結構的現狀分析與調整對策
  8. Cb richard ellis executive director of office services nigel smith said that in addition to the easy rail connections, the government s highway network plan will offer direct vehicular access to the airport and new territories, putting icc in an enviable position. the shenzhen western corridor linking the northwest new territories and shekou in shenzhen will significantly boost traffic capacity between the two. a new cross - border coach terminus planned for kowloon station will give icc tenants a full range of travel options

    世邦魏理仕執行董事辦公樓部亞洲區施禮賢表示,環貿廣場除有完善的鐵路網外,港府的策略性高速公路計劃將使西九迅速直達機場及新界各地,而連接深圳蛇口和香港新界西北部的深圳西部通道落成后,可大幅提升過境通道的車輛容量,加上粵港中港巴士總站設於九站,能為客戶提供多而廣的運輸選擇,助他們拓展中港貿易商機。
  9. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  10. Firstly, the development condition of the post assessment of highway construction project was introduced in this thesis. the signification, basic content, and assessment procedure of the post assessment were analyzed, and the relationship and difference between the post assessment and feasibility research were elaborated. then the post assessment for operation condition and operation management of chengdu chengbei entrance expressway were studied, some related proposed was put forward, in this thesis, the post assessment for operation condition and operation management was studied emphatically. the main contents of traffic survey were produced, the calculating methods of capacity and service level were studied and analyzed, and the idex system of the post assessment for operation condition was established

    論文首先介紹了高速公路建設項目后評價是高速公路基本建設程序的重要組成部分,是管理周期中不可缺少的信息反饋環節,對全面總結項目前期工作,提高高速公路建設項目決策、設計、施工和運營管理水平具有重要的意義,已經成為全面、客觀衡量項目前期工作,提高項目效益的重要手段;研究了高速公路建設項目后評價的發展現狀,分析了后評價工作的意義、基本內容和程序,探討了后評價與可行性研究的聯系與區別。
  11. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  12. From its change trends we can believe the structure of highway capacity is more and more reasonable. but there still exists big gap to satisfy the advanced and specialized needs. comparing to developed districts, hubei province lags behind

    從其近十年的發展變化趨勢來看,可以認為湖北省公路貨運結構日趨合理;但是從滿足高等級、專業化需求來看還存在很大不足,與國內外先進地區運力結構相比有較大差距,在全面建設小康社會的新時代社會發展要求下,交通發展面臨更高的服務質量需求。
  13. In the research of highway capacity, the development and perfection of traffic flow theory has incarnated the deepness and width in research

    在道路通行能力研究中,交通流理論的發展和完善體現了其研究的深度和廣度。
  14. The domestic and international study on two - lane highway capacity is summarized and commented at first in the dissertation, especially american study history and conclusion in the highway capacity manual ( hcm ) in detail is analyzed, and our researches ’ achievements on two - lane highway capacity are reviewed and outlined

    本文首先對國內外雙車道公路通行能力的研究現狀進行了總結和評述,特別是對美國道路通行能力手冊( hcm )中的相關研究歷史及結論進行了詳細分析,並回顧總結了我國在雙車道公路通行能力研究中取得的成果。
  15. Highway capacity manual hcm

    公路容量手冊
  16. ( 6 ) a highway capacity calculating model for basic sections is set up by using the maximum wave velocity

    ( 6 )提出了用最大波速計算通行能力的公式。
  17. Chapter 4 made a research of abroad development of highway capacity, which provides guidance to chinese development. the 5th chapter made a forecast of coming 20 years social needs with scientific methods

    第四章研究國外公路運力發展的歷史及趨勢,以求對我國的發展起到一定的借鑒指導作用。
  18. In this paper, we study traffic flow from the viewpoint of hydrodynamics, and set up the traffic flow theory that can be used to calculate the highway capacity and judge the level of service

    還沒有建立起一套得到公認的理論體系。本文運用流體力學的研究方法,建立了能夠應用於通行能力計算及服務水平評價的交通流理論。
  19. Actual capacities of guangzhou - shenzhen, guangzhou - foshan and shanghai - nanjing freeway are calculated. using the data from highway capacity manual 2000, the capacities under the different weather are predicted

    對廣深高速公路、廣佛高速公路和滬寧高速公路的實際通行能力進行了計算;採用hcm20oo的數據,預測了不同氣候條件下的理論通行能力。
  20. This thesis takes the narrow sense meaning of traffic capacity that is transportation equipment as the research object, mainly study the adjustment of highway capacity structure of hubei province

    通常我們把運力理解為狹義的運力,即運輸設備,本文研究的運力指運輸設備或稱為交通工具。本文以湖北省公路貨運運力結構調整為研究對象,旨在通過研究為湖北省公路運力結構調整提供一定的理論指導。
分享友人