hole bottom 中文意思是什麼

hole bottom 解釋
井底
  • hole : n 1 洞,穴,孔;(衣服等上的)破洞;傷口;漏洞;窩,坑;水流的深凹處,(河道的)緩流窪。2 (獸的...
  • bottom : n 1 底,底部。2 地基,基礎;根底;底細,真相,原因,根源。3 (樹的)根干;(山)麓麓;〈方,常 pl...
  1. Secondly, programmed the image processing arithmetic code which include the bottom arithmetic for the general condition comprises threshold division, region combination and informate and the middle level arithmetic for the given task comprises detecting the line dation creirection according to the hough transform in order to fix on the hole ’ s azimuth angle, detecting the aiguille tip position according to the image movement according to the environment and the image format

    然後,根據目標環境要求和攝像機採集圖像格式,開發了圖像處理演算法程序。圖像處理演算法包括底層演算法和中層演算法兩部分,底層演算法針對通用情況,包括閾值分割、區域合併和信息生成。中層演算法針對具體任務設計,包括利用hough變換檢測棱線的方向,從而確定圓孔的方位角和利用基於圖像運動檢測鉆頭尖端位置。
  2. Planting bar used syringes from the bottom of the hole to put adequate amounts of external uniform adhesive filling injection hole, pay attention not to air hole inclose

    使用植筋注射器從孔底向外均勻地把適量膠粘劑填注孔內,注意不要將空氣封入孔內
  3. The bag has wave - type rope, and is densely covered with air holes ; the bottom of the bag has air outlet ; the hanging hole is clearly marked, hence it is convenient and highly practical

    袋體自帶波浪型繩條,袋面密布透氣孔,袋底留有出氣口,掛孔特殊標記,方便實用。
  4. Bottom - hole pressure drawdown

    井底壓降
  5. According to this problem, this paper proposes a modified isochronal well test with bottom hole liquid loading

    針對這個問題,提出了一種存在井底積液時的修正等時試井資料解釋方法。
  6. The modified isochronal well test data with bottom hole liquid loading will have abnormity, causing a fail of processing with the original theory or much error

    摘要存在井底積液的修正等時試井資料會出現異常,使原有理論無法處理相應的測試資料或處理的結果誤差較大。
  7. Cut out several seaweed pieces from green craft foam. poke a hole nea the bottom of each. use fishing line to tie a metal nut to each piece of seaweed

    用綠色的工藝泡沫材料紙剪幾株水草,在每株水草的地步鉆個洞,然後用魚線給每株水草上系一個螺母。
  8. I noticed there was a hole in the bottom of his pail.

    這時我注意到,他那水桶的底下有一個窟窿。
  9. Bottom hole pressure gage

    井底壓力計
  10. Look from the vertical section plane, project two have not the delta conformation of fill up. project one lost the effectual contains of reservoir. in opposition, project two lost the dead contains. during the experiment of the local former in front of the dam, the quantity of the sandiness out the reservoir appears that lot of sandiness passed the bottom hole and little passed the electricity plant and the water gap

    方案二與初設方案運用對比,方案二淤積總量明顯減少,從淤積縱剖面看,方案二無明顯三角洲淤積形態,而初設方案運用30年淤積形態具有明顯的三角洲淤積形態,從庫容變化看,初設方案運用主要損失有效庫容,而方案二則相反主要損失死庫容。
  11. Being on shore, the first thing they did, they ran all to their other boat, and it was easy to see that they were under a great surprize, to find her stripp d as above, of all that was in her, and a great hole in her bottom

    一上岸,他們首先一起跑去看前一隻小船。不難看出,當他們發現船上空空如也,船底上有一個大洞,個個都大吃一驚。
  12. The rumour up here at summer camp is that kid - eating monster lives at the bottom of the swimming hole. . . and all the other kids dared me to swim across it at night

    在夏天,在這里,傳聞提高露營有個游泳洞的底部住著吃小孩的怪物. . .而所有的小孩刺激我在晚上游過它!
  13. Method of bottom hole assembly design in directional wells

    定向井下部鉆具組合設計方法
  14. Shear failure water inrush mode at karst sink hole bottom in north china coal field

    華北型煤田巖溶陷落柱頂底部剪切破壞突水模式
  15. Z - axis feed dwell time at the hole bottom in a spot - machining spot cycle. set this time in spindle revolutions

    在一個點加工的點循環中,在該孔底z軸進給駐留時間。在主軸回轉數中設置該時間。
  16. When the spot - machining tool reaches the hole bottom, the z - axis will firstly srop moving until the spindle makes d3 revolutions, and then return to the original position at the rapid feedrate

    在點加工刀具碰到孔底后, z軸會先停止運動,直到主軸旋轉了d3圈后,才會以快速進給速率返回到原始位置。
  17. 5. 6 excellent hole bottom surface sunken degree of depth quite on 15mm, flawed or damaged area quite on bottom 2 3 of area allow artificial to mend

    5 . 6棒孔底面凹陷深度不大於15mm ,缺損面積不大於底面積的三分之二允許人工修補。
  18. Application of hole bottom water medium - controlled blast technology in zhujabaobao iron mine

    孔底水介質控制爆破技術在朱家包包鐵礦的應用
  19. The existing results about scour hole was summarized. experiments was made about the influence of aeration on scour, the dynamic pressure on the original riverbed and the scouring hole bottom, and the influence of aeration on the dynamic pressure and the velocity of submerged jet. scour was simulated by numerical model

    在總結前人研究成果的基礎上,試驗研究了摻氣對基巖沖刷破壞的影響;基巖沖刷過程中沖坑底部脈動壓強隨沖坑深度的增加而變化的特性;摻氣對沖坑未形成前河床底部及基巖沖刷坑底部脈動壓強的影響;摻氣對射流軸線流速變化的影響等。
  20. The application and effects of hole - bottom detonating in medium - length hole blasting

    論中深孔爆破孔底起爆的實施和應用效果
分享友人