  1. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  2. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  3. To design the water cushion of baishan arc dam, the design experiment of ertan hydraulic power station, xiao wan hydraulic power station were refereed. through large amount of scientific experiments and theoretical calculation, and the design coefficients of water cushion in domestic and abroad were summarized, then the design layout of the baishan cushion was worked out at last

    本文針對白山拱壩水墊塘方案設計,參考國內二灘、小灣等工程設計經驗,通過大量的科學試驗和理論計算,總結國內外的水墊塘設計參數,最後確定了白山水墊塘的設計方案。
  4. Based on the systematic study on the coal - bearing strata in the dam region of some hydraulic key project, southwest of china, the paper disclosures the distribution of the discarded caves, analyses the engineering effects of the existence and the deformation of the discarded coal caves during the construction of the hydraulic key project and running of it

    摘要通過對西南某水利樞紐工程壩區煤系地層的系統研究,揭示了在壩區左右岸煤洞的展布特徵,結合工程,分析了煤洞的存在及其變形的工程效應。
  5. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。
  6. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  7. Hydraulic fill dams are built of sand and silt brought into the dam in a stream of water, usually through a pipe.

    水力沖填壩通常是用一根管子利用水流把砂和粉沙運到壩體處築壩。
  8. A small leakage through an earth fill or hydraulic fill dam or its foundation removes some fine material in suspension.

    貫穿填土壩、水力沖填壩或壩基的一個細小的漏水孔隙以懸浮的方式帶走一些細小的土粒。
  9. Earth dam is an old hydraulic construction. it is also the highest type of dams in the world. earth dam has the advantages of lower requirement to terrain conditions and less cost

    土壩是一種古老的水工建築物,也是世界上建成的壩型最高的水工結構,它具有對地質條件的要求低,造價低廉的特點,因而,越來越多的人從事土壩的研究。
  10. The method of hydraulic calculation with non - pressure flow from the outlet pipe of the warping dam

    淤地壩涵管無壓流水力計算方法
  11. Various computational examples are presented in the paper for different cases, such as simultaneous routing of main and branch streams, routing of dam - break flood, computation of simultaneous outflow from dam, flood calculation in watercourse with multiple branch steams, and computation of the hydraulic grade line in the reservoir

    論文針對不同條件分析了干支流同時演進計算、潰壩洪水計算、干支流大壩泄洪對下游的影響、多支流河道演算和庫區水面線的計算。
  12. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  13. It founds natural heightening theory for warping dams and puts forward specific way of diversion, measures for preventing dam eroded and design for energy dissipation and flood storage of cofferdams and sedimentation and dewatering through exploration and study on deposition in front of natural formed dam and the techniques of building dam through hydraulic filling

    通過對天然聚湫壩體前的淤積和「水力沖填」築壩技術的探索和研究,創立了淤地壩壩體自然加高的理論,並提出了具體的導流方式、壩體防沖措施及圍堰消能蓄洪、留淤脫水設計。
  14. Some primary researches are given in this paper, combined with the project - stability evaluation of concrete high arch dam of tengzigou, which is cooperated between hydraulic structure center of hohai university and dongbei hydroelectric investigation & design ltd. considering actual research work and specification, either concrete strength limit analysis of dam or shear failure of seams in rock abutments are taken singly into account for safety evaluation of high arch dam

    本文就這個問題,結合河海大學水工結構所和水利部東北勘測設計研究有限責任公司的合作項目?藤子溝水電站雙曲拱壩整體穩定性分析,在這方面做了一些初步研究。現行規范將壩體混凝土強度校核和壩肩穩定安全度評價分開進行,沒有考慮兩者的關聯性,然而這兩類破壞常常是相互聯系,伴隨發生的。
  15. Study on mechanism of hydraulic fracturing in core of earth - rockfill dam

    土石壩心墻水力劈裂機制研究
  16. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  17. Accessing the data, the knowledge, the model and the relative parameter from database, knowledge - base, model - base and the interface, the expert system automatically infers and calculates the maximum depth and length of stilling basin the bantai hydraulic project and the xiangyanghe dam have been given as the example

    以班臺閘和向陽河壩為工程實例,根據數據庫、知識庫、模型庫中的相關數據、知識經驗、模型,以及人機交互界面的相關參數,進行分析推理計算,求出最大消力池深和池長,對系統的相關功能模塊進行的驗證。
  18. After the hydraulic project of the three gorges of the yangtze river is completed, the water level in front of the dam of the three gorges reservoir area will be raised from the now several tens of meters to 175 meters. furthermore, because of the needs of preventing floods, the water level of reservoir area will be adjusted periodically between 175 meters and 145 meters every year. this will inevitably cause the revival of part ancient landslides and the formation of new landslides, which will definitely influence the urban construction, the traffic transportation, the people ' s life and property security, etc. in the three gorges reservoir area

    長江三峽水利樞紐工程建成蓄水后,庫區壩前水位將由現在的幾十米海拔高程提高到175m ,且由於防洪的需要,庫水水位每年還將在175m與145m之間進行周期性調節,這無疑將導致部分古滑體的復活和新滑體的產生,結果勢必會對未來三峽庫區范圍的城鎮建設、交通運輸、人民生命財產安全等造成一定的影響。
  19. 5 ) to solve the uncertain modeling problem about hydraulic buildings, a new modeling method named aggregation modeling based on graph object technique is put forward. as a result, the graph model of solid gravity dam is designed. the graph object of water _ proof dam section taken as an example, the design and implement of self defined graph object is discussed

    5 )根據水工建築物不定型建模的特點,提出一種基於圖形對象技術的聚合建模方法,詳細討論了聚合建模法的基本原理;設計了實體重力壩的圖形對象模型,並以擋水壩段圖形對象的設計為例,研究了自定義圖形對象的設計和實現;基於objectarx的通知? ?反應機制,採用數據庫反應器和對象反應器,建立了圖形對象的互動操作機制;以擋水壩段斷面優化設計為例,研究了圖形對象和分析、計算功能的集成方案。
  20. People came in flocks to see the new hydraulic power station beside the dam

    人們成群結隊地來參觀水壩旁邊新建的水電站。