hydro-development 中文意思是什麼

hydro-development 解釋
水力開發
  • hydro : n 1 〈口語〉水上飛機(=hydroplane)。2 〈英俚〉水療處,接待水療病人的旅館(=hydropathic establi...
  • development : n. 1. 發展,發達;進化。2. 展開;擴充;開發。3. 發達物,新事物,發展階段。4. 【生物學】發育(史);【軍,數】展開;【攝影】顯影,顯像;【音樂】展開(部);研製,研製成果。
  1. Hydro development in yalong basin and inspirations

    雅礱江流域水電開發及啟示
  2. Foundational work for development - oriented resettle - ment of hydro project

    論水利水電工程開發性移民的若干基礎性工作
  3. In this paper, thermal evolution history of organic matter of the source rocks and hydrocarbon generation history have been researched by tti method, hydrocarbon migration direction and migration times were probed combining with the area structure development feature ; distribution pattern of the main reservoir intervals on lateral and longitudinal have been predicted by researching on development feature and control factors of the reservoir intervals, the actions of reservoir conditions in hydrocarbon accumulation and bearing also were probed combining with pore evolution feature ; the micro - pore feature of regional cap and direct seal in carboniferous - lower triassic in this area have been determined with micro - capillary pressure curve and intrusive mercury curve ; the prospecting districts have been pointed out combining with the hydro - geologic feature, the potential reservoirs were classified according to trap types in this area, the author attempt to evaluate on the hydrocarbon - bearing condition in the str ata of carboniferous ~ lower triassic from hydrocarbon generation and migration reservoir condition, reserved condition etc, and predict the reservoir types and hydrocarbon - bearing patterns combining with the structure evolution. based on above, the author point out that the central block of chenghu - tuditang synclinorium and the southern block of dangyang synclinorium are the advantageous regions for exploration

    本文用tti方法研究了烴源巖有機質的熱演化史和油氣生成史,並結合區內構造發育特徵,探討油氣在區域上的運移方向和在時間上的運移期次;通過對儲集層段的發育特徵和控制因素的研究,預測了本區主要的儲集層段在橫向上和縱向上的分佈規律,並結合孔隙演化特徵,探討儲集條件在油氣聚集成藏中的作用;利用微毛細管壓力曲線法和壓汞法,對石炭系?下三疊統的區域蓋層和直接蓋層的微孔隙特徵進行了定量評價,並結合水文地質分佈特徵,指出有利於油氣保存的地區;根據區內存在的各種圈閉類型,對可能存在的油氣藏進行了分類,並試圖從油氣的生成與運移、儲集條件、保存條件等方面,動態地綜合評價石炭系?下三疊統油氣成藏條件,並結合構造演化特徵,預測其油氣藏類型和成藏模式。
  4. Development of reduced chemical reaction kinetic model for hydro - carbon fuel combustion

    碳氫燃料點火燃燒的簡化化學反應動力學模型
  5. This paper firstly deals with the general automation development of hydro plants. in our country, then analyses the technology of automation as well as the chance & challenge of the automation of hydro plant

    本文首先從我國水電廠自動化發展概況入手,分析了我國水電廠自動化技術發展的過程,以及水電站自動化面臨的機遇與挑戰。
  6. The dredger is one of major facilities in the fields of channel dredge, hydro project, prevent or control flood, ocean development, seaport construction etc. at present, the management maintenance methods of dredger are primary time based maintenance and run - to - breakdown maintenance

    挖泥船是航道疏浚與整治、水利工程、防洪搶險、海洋開發及海港建設的主要工具。目前對挖泥船管理維修的方法主要有定期維修和事後維修。
  7. The main results of this paper are as follows : ( 1 ) the operation chart for individual and associated operation of new and old units, is plotted by using series of multiyears flows and the associated charts is advised to direct the reservoir operation. ( 2 ) on the basis of analysis on the characteristics of hydro - information observation system and flood forecasting system, some key problems in flood operation such as dispatching period of time, decision - making method and so on are studied. ( 3 ) the study and development of flood - dispatching simulation model

    論文取得的研究成果如下: ( 1 )採用長系列徑流資料,繪制了新老機組單獨運行和聯合運行調度圖,通過對比分析,建議採用聯合運行調度圖來指導水庫運行; ( 2 )在對石泉水庫水情測報系統和洪水預報系統的特點進行分析的基礎上,研究了洪水調度中的幾個關鍵問題,如調度時段、決策方法等; ( 3 )洪水調度模擬模型研究與開發。
  8. Simultaneously constructing navigation facilities of goupi shoal hydro - power station to promote comprehensive development and utilization of wujiang river

    同步建設構皮灘水電站通航設施促進烏江綜合開發利用
  9. Relied on the project “ management system of the hydro engineering construction trade of tianjin ” ( msect ) of hcht, this thesis analyzes the national situation of engineering construction trade and the domestic and international network trade at present, expatiates the knowledge of engineering construction trade, discusses the tender review methods which are often used and sets the mathematic models for methods of tender review which are being studied, designs the structure models and application development in detail, at last describes the technologies being used in network security, information security and impartial supervision

    本文依託北京海策環通科技發展有限責任公司承接的「天津市水利工程建設交易管理系統」開發項目,對國內工程建設交易的現狀和國際國內網上交易的情況進行了分析,對工程建設交易理論知識進行了全面闡述,對常用評標方法進行了對比研究,對在研評標方法進行了數學模型方面的探討,對系統的架構模型和應用開發進行了詳細設計和研究,最後對網路安全、信息安全和公正監督等採用的技術進行了重點闡述。
  10. Development and application for hydro - lubricating non - contacting spiral groove mechanical seals

    流體動力潤滑螺旋槽非接觸機械密封的發展及應用
  11. Then, by the comprehensive analysis of essential conditions for stone forest development, and the quantitative study on the evolution phases of bajiang karst catchment and the spacial coupling analysis of its hydro - geomorphological system, the paper studies the relationship between the evolution of bajiang karst drainage area and the development of stone forest, and, combined with the evolution history of the catchment, puts forward a model concerning the relationship between the evolution of bajiang karst catchment and stone forest development, in the mechanism of " tri - level erosion ", if a < s < c, the visible and actual height of stone pillars will keep on increasing, meanwhile, soil layer among stone pillars will become thicker and thicker, so the the height of stone pillars " root will become higher and higher, too

    在「三重剝蝕」機制中,若a s c ,石柱的可見高度和實際高度會不斷增高,同時,石柱的根部的土層會增厚,其土下部分的高度也會不斷增大。若a c s ,說明石柱的實際高度在增加的同時,其可見高度也在增加,但土層會變得越來越薄,最終當底土被完全剝蝕掉后,氣下溶蝕和土下溶蝕的差異消失,此時a接近於c ,石柱的實際高度將停止拔高或極緩慢增長,並在各種物理、化學風化的作用下而變得日益矮小。若s a c ,石柱的可見高度將趨于變矮,但驅動石林發育的土層厚度將會增大。
  12. Therefor, in the light of theory and methods of karst hydrogeomorphology and the knowledge of transformation, balance and variation of matter and energy in karst drainage basin, we can examine stone forest within a specific scope of time and space, and reveal the mechanism and the development model of stone forest with the help of the principle of the mutual response processes among base - level, water flow and forms. just based on the understanding above, the paper, with a special reference to the lunan stone forest which is the best developed one in china, discusses the hydro - geomorphlogical structure of the bajiang river, geomorphological types and spacial distribution feature of the stone forest, and studies the erosion rate on the top of stone forest, soil erosion rate, sub - soil dissolution rate and their combined influences on the evolution of stone forest, furtherly brings forward and demostrates the " tri - level erosion " mechanism for the development of stone forest

    正是基於這種認識,本文以我國石林發育最完美的路南石林為研究對象,研究了巴江喀斯特流域的水文地貌結構特徵、石林的形態類型及其空間分佈特徵;探討了石柱頂部的剝蝕速率( a ) 、表土剝蝕速率( s ) 、土下溶蝕強度( c )及其組合對石林發育的影響,提出並論證了路南石林發育的「三重剝蝕」機制;通過對石林發育必備條件的剖析,以及對巴江喀斯特流域演變階段的定量研究、水文地貌系統的空間耦合分析,探討了巴江喀斯特流域的演變與路南石林發育間的關系,並結合該流域的演化史,提出了巴江喀斯特流域演變與路南石林發育的模式。
  13. This thesis introduce the research and experiment of the application and the characteristic of the hydro - viscous drive, as well as problem solving in development of the hydro - viscous drive in practice

    本文研究工作對液體粘性調速離合器的工程應用性和工作特性進行了研究和實驗,並解決了產品研製過程中的實際問題。
  14. Chapter 1 mainly introduces the background and significance of the research theme, including the performance of the hydro - viscous and the advantage of the use of hydro - viscous. it also introduce of the development of the hydro - viscous at home and abroad

    具體內容主要包括以下幾個部分:第一章為緒論,著重分析了選題背景和意義,包括液體粘性調速離合器性能和優勢,國內外研究現狀。
  15. The old excitation setting in an _ kang hydro power plant restricts the development of the microcomputer regulator of speed, microcomputer protection and the computer supervisor and control that has altered, has become a bottleneck in improving the level of automation in power plant

    安康水電站原勵磁裝置嚴重製約已實施改造的微機調速、微機保護、計算機監控作用的發揮,已成為進一步提高電廠整體自動化水平的瓶頸。
  16. At present, the hydropower station is the construction in the energy sector that our country supported development especially, most power stations operate the monitoring to the efficiency of hydro - generator unit not perfect enough at home, overhaul to put forward and perfect constantly concept by condition - based maintenance of unit, load optimizes of unit and economical operation is the good trend that operates of hydropower station, monitor to hydro - generator unit operation parameters particularly essential in real time

    目前,水電站是我國重點支持發展的能源建設,而國內大多數水電站對水輪發電機組效率的在線監測剛剛起步,隨著機組狀態檢修概念的提出和不斷完善,機組負荷優化、經濟運行是電站良好運行的必然趨勢,所以對水輪發電機組效率的實時監測尤為必要。
  17. Article 38 people ' s government ' s at all levels shall, in accordance with the principles of suitability to local conditions, provision of multiple forms of energy to complement each other, comprehensive utilization and stress on benefits, enhance development of energy in rural areas and exploit and utilize methane, solar energy, wind energy, hydro energy, geothermal energy, and other renewable and new energy resources

    第三十八條各級人民政府應當按照因地制宜、多能互補、綜合利用、講求效益的方針,加強農村能源建設,開發、利用沼氣、太陽能、風能、水能、地熱等可再生能源和新能源。
  18. The project will focus on the following critical national demands : ( 1 ) rehabilitate wetland ecosystem, prevent flood and drought, and mitigate eco - risks from the viewpoint of scientific development ; ( 2 ) improve water quality, ensure drinking water safety, protect human health, and establish an environmental - friendly society ; ( 3 ) establish a sound ecological security system, build an early warning and forecasting system for handling disasters occurring in wetland hydro - ecosystem and water environment, safeguard regional eco - security, and thus comply with the ramsar convention

    總體目標: 1 、從濕地系統層面豐富和發展濕地學理論; 2 、解決我國濕地研究面臨的一系列基礎科學問題; 3 、顯著提高我國濕地科學的整體研究水平; 4 、有效協調區域社會經濟發展與濕地保護之間矛盾。
  19. Shui buya hydro - hinge is the upest cock step of three - step cascade hydroelectric power stations from upstream to down stream on the middle low reach of the main course of qingjiang river, which is going to be developped by hubei qingjiang hydroelectric development ltd after constructing ge he yan and gao ba zhou hydroelectric power stations

    水布埡水利樞紐是湖北清江水電開發有限責任公司繼隔河巖、高壩洲水電站之後,在清江中下游幹流上實施三級梯級開發的最上一級龍頭水電站工程。
  20. According to the research development of flow - induced gate vibration in recent years, the paper presents a retrospect and a summary on the relationship between hydrodynamic loads and gate vibration characteristics, the hydrodynamic load characteristics and controlling means, the optimum design methods for gate anti - vibration, the dynamic stability analysis of the radial gate ' s arm, the methods to simulate the gate ' s hydro - elastic vibration, as well as the simulation analysis of flow - induced gate vibration

    摘要從水動力荷載與閘門振動特性的關系、水動力荷載作用特點及其控制方法、閘門減振優化設計方法、弧形閘門支臂動力穩定性分析、閘門水彈性振動模擬方法以及閘門流激振動模擬分析等方面,對水工閘門流激振動的研究進行了回顧。
分享友人