hydropower tunnel 中文意思是什麼

hydropower tunnel 解釋
水力發電隧洞
  • hydropower : n. 【電學】水力發出的電。
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now

    特別是對在高地應力、高地下水位區域的隧洞建設,其施工難度更大,在國內的水利水電工程建設中並不多見。
  2. Construction of long tailrace tunnel bifurcation concrete structure for dachaoshan hydropower station

    大朝山水電站長尾水隧洞岔管混凝土施工
  3. The penstock for jinhe hydropower station is less in china, as it has a obliquity of 50 on the bending and inclined straight section in space ; for which the manufacture and installation are smoothly completed under the construction condition in the tunnel and the environment of alpine region with available construction method in combination of limited construction method for the key technical problems of the manufacture and installation of the penstock, which provides a reference for the constructions under the similar circumstance

    摘要金河水電站壓力鋼管的空間轉彎和斜直段的50傾角在國內是比較少見的,針對鋼管製造、安裝的技術難點,在高寒和復雜的洞內施工環境中,結合有限的施工手段,採取有效可行的施工方法,順利完成了製造、安裝任務,對類似環境下的施工提供了一定的借鑒。
  4. Upper access tunnel collapse treatment for laxiwa hydropower station

    拉西瓦水電站左岸高線上壩交通洞塌方處理
  5. An engineering geology analysis of the frature seepage of a conveyance tunnel of hydropower station

    電站輸水隧洞破裂滲水事故工程地質分析
  6. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    錦屏二級水電站是一首部設低閘,採用長隧洞引水的高水頭、大流量的引水式電站。
  7. The chemical grouting technique is widely applied in many kinds of engineerings, such as hydropower, tunnel, subway, mineral mountain, coal, transportation. . etc. the technique has characteristics of fleetness, economy, special and dependable etc. and develop its original effect well in civil engineering of waterproofing process, treatment to leakage, structural reinforcement

    化學灌漿技術在水電、隧道、地鐵、礦山、煤炭、交通等各個領域有很廣泛的應用。具有快速、經濟、獨特、可靠等特點,在土木工程的防滲、堵漏、補強、加固中充分發揮其獨到的效用。
  8. Based on the moveable - bed model tests and some relative studies, it is found that the proposal reservoir for the hongshiyan hydropower station will be a heavy deposit reservoir, its sand - flushing sluice could not effectively de - silt and serious hidden - troubles exist in its diversion tunnel

    摘要待建的紅石巖水電站水庫屬嚴重淤沙型水庫,通過動床水工模型試驗和有關研究分析發現,其沖沙閘排沙效果不理想,引水隧洞存在進沙嚴重的隱患。
  9. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場內環線道路黑水河溝隧道進口滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上進洞所發揮的作用。
  10. Excavation of left - bank flood discharging tunnel at gongbo gorge hydropower station

    公伯峽水電站左岸泄洪洞開挖施工
  11. Many conveyance and hydropower projects including many hydraulic tunnels are built since 1949. a lot of experiences at the construction of tunnel are accumulated

    新中國成立之後,我國進行了大規模的水利水電建設,修建了許多水工隧洞,積累了許多經驗。
  12. Construction technology of access tunnel for laxiwa hydropower project

    拉西瓦電站左岸高線交通洞粘土巖及斷層施工技術
  13. The following three alternatives are used to assess the impact caused by the projects, ( l ) the entrance of tunnel is at the downstream of the huanren dam and the main purpose of the huanren reservoir is to supply water for the project, ( 2 ) the entrance of tunnel is at the downstream of the huanren dam and the main purpose of the huanren reservoir is hydropower generation and ( 3 ) the entrance of tunnel is at the upper of the huanren dam

    本文擬研究該調水工程的水源工程?桓仁水庫的調度運行方式,使工程的正面效益較大,負面損失盡可能地小。桓仁水庫的調度方式有三個方案: ( 1 )以供水為主的壩下取水方案; ( 2 )以發電為主的壩下取水方案; ( 3 )庫區取水方案。
  14. During the construction of the concrete lining for the diversion tunnel of xiaowan hydropower station, the concrete linings for the sides and the crown of the tunnel are simultaneously placed by the integral steel shuttering trolley with the greatly shortened construction progress

    摘要小灣水電站工程在導流洞混凝土襯砌施工中,邊頂拱混凝土採用整體式鋼模臺車一次襯砌成形,大幅提高了施工進度。
  15. Design and construction of hydraulic tunnel of hongjiadu hydropower station

    洪家渡水電站水工隧洞設計與施工
  16. This paper presents a new synthesized statistical method for acoustic detection data processing based on the contrast to and statistic & analysis on a great deal of data of acoustic detection, elastic modulus and tunnel operation conditions, which has been applied in many hydropower projects

    為此,通過對大量聲波、彈模數據和工程運行情況進行對比、統計和分析,總結出了一種針對隧洞高壓固結灌漿效果的多種聲波檢測綜合數據統計方法,並已用於多個水電項目中。
  17. In order to calculate the high external water pressure, the rock seepage field and external water pressure coefficient should be treated in detail. concentrated on the questions of high external water pressure and flow of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied, the high external water pressure of jinping cascade 2 hydropower station is analyzed and studied in detail

    本文在總結前人研究成果的基礎上,圍繞深埋隧洞的突涌水和高外水壓力問題,系統地研究了深埋隧洞襯砌水荷載和外水壓力的作用機理及計算方法等理論,並對錦屏二級水電站深埋引水隧洞的外水壓力問題進行了詳細的分析和研究。
  18. Access tunnel excavation technology on the right bank in longtan hydropower station

    龍灘水電站右岸交通洞開挖技術
  19. Investigation on the concentration level of radon in the tunnel workplace in a hydropower station

    水電站隧道作業場所空氣氡濃度水平調查
  20. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外水壓力問題,進一步分析和研究了襯砌水荷載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和灌漿封堵方案不同情況下的滲流場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措施。