immersed tube 中文意思是什麼

immersed tube 解釋
沉管
  • immersed : adj. 1. 浸入的,沉入的。2. 【宗教】行浸禮的。3. 【生物學】陷入的4. 【植物;植物學】沉水(生長)的。
  • tube : n 1 管,筒;顏料管。2 管狀地下隧道;〈口語〉(倫敦的)地下鐵道。3 【炮】炮身;【汽鍋】鍋管;【解...
  1. Both tsing kwai highway and west kowloon highway are essentially on viaducts, until the route finally enters hong kong s first dual 3 - lane immersed tube tunnel, the western harbour crossing, which measures 2 km from the portal on the west kowloon reclamation near yau ma tei to the exit and the end of the new airport access, at sai ying pun on hong kong island

    青葵公路和西九公路均主要為高架道路,直至進入本港首條雙程三線沉管隧道西區海底隧道。這條過海隧道由位於西九填海區近油麻地的入口至設于港島西營盤新機場通道終點的出口計,全長兩公里。
  2. Highway structures, three immersed - tube cross - harbour tunnels, nine road tunnels and three bridges built high above sea level

    座道路構築物、三條沉管式過海隧道、九條行車隧道和三條跨海大橋。
  3. Figure 3 - immersed tube tunnel option - above seabed

    圖3 -沉管隧道方案在海床之上
  4. Abstract : based on references and works of authors, this paper presents the developments, key techniques of immersed tunnel tube in abroad and home recently years, and an alyses its advantages and shortcomings. finally, it gives an intro duction of so me model experiments ( including transportation, immersing, silting and ventilating ) for immersed tube

    文摘:對沉管隧道的國內外發展情況、沉管隧道的防水、地基處理、浮運沉放等技術作了概述,文中還將沉管隧道與橋梁、沉埋法與盾構法進行了相應比較,指出了沉管隧道的優點及有關顧慮,最後就有關沉管隧道的模型試驗作了相應介紹
  5. Immersed tube tunnel options

    沉管隧道方案
  6. Immersed tube tunnel

    沉管隧道
  7. The foundations of the cwb tunnel cause further constraints to immersed tube tunnel construction

    -中環灣仔繞道隧道的地基,對建造沉管隧道構成進一步的限制。
  8. Figure 4 - immersed tube tunnel option - below seabed, profile between pla berth and central reclamation phase i

    圖4 -沉管隧道方案在海床之下,地鐵荃灣線的剖面圖
  9. Abstract : in the internal circulating fluidized bed, there exist the moving zone, fluidizing zone and heat transferring zone with different fluidized air velocities. the convection heat transfer coefficient of immersed tube in the heat transferring zone is impacted by the velocity of the moving zone nearby and its data and change trend are obviously different with those of the common bubbling bed. the maximum heat transfer coefficient is evidently higher than that of the bubbling bed. as the bed materials have not been fluidized in the heat transfer zone, the coefficient has increased highly. the curve of that changes gently, feasilble to control the combustion intensity in the fluidizing zone

    文摘:垃圾焚燒系統中,內旋流流化床存在不同布風速度的移動區、流動區和換熱區,處于換熱區的埋管的對流換熱系數受附近流動區氣流參數的影響,其變化趨勢及數值大小與普通鼓泡型流化床之間有明顯不同:最大的對流換熱系數明顯高於鼓泡床;換熱區尚未流化時,對流換熱系數已經大幅提高;整條換熱曲線的變化比較平緩,易於流化床濃相床內換熱。
  10. Study on possibility of sand liquefaction of immersed tube foundation in earthquake

    地震作用下沉管地基砂土液化可能性研究
  11. Constructing the cwb as an immersed tube tunnel, without reclamation over the top of it, would result in various problems mainly associated with the fact that the tunnel structure would be above seabed level

    -以沉管隧道方式興建中環灣仔繞道,但繞道上又不進行填海的話,會引致多個問題,主要因為隧道結構在海床之上。
  12. If an immersed tube about 10 metres high is placed above the existing seabed level, which is at around - 12mpd

    -假如在現有海床上約主水平基準面以下12米處敷設直徑約10米的沉管。
  13. Dredging of an immersed tube tunnel trench to - 30mpd alongside the existing gravity structure seawalls would undermine the seawalls, the bases of which are around - 5mpd

    現有的重力式結構海堤的地基在主水平基準面以下約5米,沿海堤挖掘沉管隧道坑道至主水平基準面以下30米會削弱這些海堤。
  14. At the end of 2002, hong kong had 1 924 kilometres of roads and 1 044 road structures, three immersed - tube cross - harbour tunnels, nine road tunnels and three bridges built high above sea level

    截至二零零二年年底,香港共有全長1924公里的道路、 1044座道路構築物、三條沉管式過海隧道、九條行車隧道和三條跨海大橋。
  15. At the end of 2004, hong kong had 1 944 kilometres of roads and 1 087 road structures, three immersed - tube cross - harbour tunnels, nine road tunnels through hills and three bridges built high above sea level

    截至2005年年底,香港共有1 955公里道路及1 129座道路構築物三條沉管式過海隧道九條過山行車隧道和三座跨海大橋。
  16. At the end of 2003, hong kong had 1 934 kilometres of roads and 1 057 road structures, three immersed - tube cross - harbour tunnels, nine road tunnels through the hills and three bridges built high above sea level. these facilities provide a comprehensive road network

    截至2003年年底,香港共有1934公里道路及1057座道路構築物、三條沉管式過海隧道、九條過山行車隧道及三條跨海大橋。這些設施為本港提供完善的道路網路。
  17. It connects the new west kowloon reclamation with sai ying pun on hong kong island. it is the first dual 3 - lane immersed tube tunnel and forms part of the 34 km expressway to the new hong kong international airport at chek lap kok

    這條隧道連接新的西九填海區及港島的西營盤,為本港首條雙程三線沉管式隧道,亦是長達34公里通往赤角新香港國際機場干線的一部分。
  18. A staged construction similar to that currently proposed for the implementation of the project will be required, even for the immersed tube tunnel option

    -沉管隧道方案必須分段施工與目前的工程計劃建議相類似。
  19. For the " immersed tube option ", it has to be built above seabed level and the navigational depth available is not adequate

    如選擇海床上採用沉管的方法,繞道需在海床上建造但導航水深不足。
  20. The application of immersed - tube ramming grouting in chaoyangzhou of nanchang

    在南昌朝陽洲的應用
分享友人