incline forward 中文意思是什麼
incline forward
解釋
把身子向前傾-
It is firstly found that for alloys in transitional region, with enhancement of atomic interaction energy, pregnant period of " phase is shortened dramatically, and process of clustering accelerated remarkably, stages of growth and coarsening of " phase brought forward, i. e. precipitation mechanism of alloy in transitional region incline to that of alloy in instable region
首次發現,隨著原子間相互作用勢的增加,過渡區合金中有序相的孕育期明顯縮短,原子簇聚過程明顯提前,相的長大和粗化階段也有所提前,即促使過渡區合金的沉澱機制偏向失穩區合金。 -
But they did not listen or incline their ear, but walked in the counsels and the stubbornness of their evil hearts and went backward and not forward
24他們卻不聽從,不側耳而聽,竟隨從自己的計謀和頑梗的惡心而行,向後不向前。 -
" yet they did not obey or incline their ear, but walked in their own counsels and in the stubbornness of their evil heart, and went backward and not forward
耶7 : 24他們卻不聽從、不側耳而聽、竟隨從自己的計謀、和頑梗的惡心、向後不向前。 -
Aiming at the problem of incline of lintel in warm extrusion forming process for copper alloy solid bearing retainer, the rigid - plastic fem analysis models have been setup and numerical simulation and analysis been made, improving measures put forward
摘要針對軸承保持架溫擠壓成形中出現的過梁傾斜等問題,建立了剛塑性有限元模型,對溫擠壓成形過程進行數值模擬,並提出了相應的改進措施。 -
Brought forward a new method of estimate the movement speed and incline from the acceleration. introduced an important reference to estimate activity intensity
提出一種根據加速度信號估計運動速度和運動角度的新方法,為準確評估運動強度提供了參考依據。 -
Moreover, a series of solution to these difficulties are brought forward : applying the theory of fold related to fault to interpret complex structural belts in piedmont : analyzing the features of the surface and underground seismic reservoir prediction and porosity model construction to predicate effectively the texture and quality of sandbodies ; using structural model to direct the construction of velocity model and process prestack migration imaging of seismic data ; utilizing interval velocity to forecast reservoir pressure : improving the drilling technology for pressure detection and prompt protection of vertical well against incline well
並針對主要難點提出了解決對策:正確應用斷層相關褶皺理論解釋山前復雜改造、開展地表井下地震儲層與孔隙建模有效預測砂體結構與質量,利用有效構造建模指導速度建模與疊前偏移成像、開展層速度預測地層壓力與鉆井壓力檢測及快速防斜打直配套鉆井技術攻關等。
分享友人