infeasibility 中文意思是什麼

infeasibility 解釋
不可行性
  1. This paper will discuss and prove the infeasibility of system of people ' s jurors in current china from the lawsuit culture and judicial system ' s angle, through a method of comparative analysis

    基於此,本文從訴訟文化、訴訟制度的視角出發,通過比較分析,試圖論證人民陪審制在當前中國的不可行性。
  2. Abstract : the gpc or crhpc strategy with input constraints will be possible to lead to infeasibility of the control algorithm and the performance of the control system will get degradation or instable. in order to overcome this problem, a control algorithm with guaranteed feasibility is proposed in this paper. it is shown that the algorithm makes the plant asymptotically stable and drives condition setpoint close to the actual setpoint of the plant

    文摘:在系統輸入受限的情況下,採用一般的廣義預測控制或受限時域預測控制有可能會造成控制演算法不可行,從而使系統的性能變壞或不穩定.針對這個問題,本文提出一種保證可行性的控制演算法,並證明該演算法能夠使系統漸近穩定且最終使條件設定值跟蹤系統的實際設定值
  3. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具有結構新、工藝復雜、體積大、運輸困難,將常規鐵路的橋梁廠製造橋梁、經過鐵路運梁到工地、邊鋪邊架進行橋梁製造與架設的傳統施工模式應用到該線是行不通的,必須在現場預制橋梁、並採用專門的運架梁設備進行橋梁架設,因此箱梁的製造、架設施工成為該線施工技術攻關的重點和難點。
  4. The first part comprises industrial pta oxidation process modeling, residual fluid catalytic cracking process modeling, complex distillation modeling and analysis, the application of pta oxidation process soft - sensor technology. in the second one, the infeasibility degree based genetic algorithm is proposed to handle constrained optimization problem in engineering cases and the neighborhood and archive based genetic algorithm and its variant are proposed to treat the multi - objective optimization problem. with that, the pta oxidation process is regarded as a benchmark for the application of the proposed multi - objective optimization genetic algorithm

    論文內容分為兩部分,第一部分對包括三個典型的工業過程, pta氧化反應器、渣油催化裂化反應系統和復合式精餾塔進行分析、建模以及pta氧化過程的軟測量工程實施;第二部分分別提出了基於進化演算法解決工業過程中普遍存在的約束優化問題和多目標優化問題的過程優化演算法? ?基於不可行度選擇遺傳演算法和基於鄰域和存檔操作遺傳演算法,並利用該演算法對工業pta氧化過程操作進行多目標優化研究。
  5. Taking load uncertainties, infeasibility problem and multiple objection of the reactive power optimization in the radial distribution system into consideration, loads are modeled as fuzzy interval numbers. fuzzy power flow is proposed based on fuzzy interval load for the more practical membership function of line losses rate and maximal voltages offset. this thesis presents multiple objection model of the reactive power optimization considering uncertainties using the fuzzy set theory

    對配電網電壓無功優化問題中負荷的非概率性的不確定性問題、多目標問題、約束不可行性問題進行了研究,用模糊區間來描述實際的負荷情況,並用負荷的模糊區間值計算配電網的潮流,得到有功功率損耗和電壓的模糊區間值,使網損率和節點電壓最大偏移量的隸屬函數更接近實際情況;將改進遺傳演算法與模糊集理論相結合,通過求解多目標函數和約束條件的模糊集合的交集,得出網損率和節點電壓最大偏移量最小的最優運行狀態。
分享友人