installation capacity 中文意思是什麼

installation capacity 解釋
設備能力
  • installation : n. 1. 就職,就任,就職禮。2. 裝置,設備。3. 安裝;設置;安置。4. 軍事設施。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. This paper analyzes the fire danger factors for torching system and vent pipe, and addresses the key design matters of deployment, height, discharging capacity and automatic monitoring device of torch as well as the discharging gas concentration, installation position and security device of the vent pipe

    文章分析了火炬系統和放空管的火災危險因素,並從火炬的布置、高度、排放能力、自動監控裝置以及放空管的氣體排放濃度、安裝位置、安全裝置等方面,重點論述了火炬系統和放空管的消防安全設計要點。
  2. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除水電工程總承包外,還將業務擴展到各類土木工程、市政工程、海事工程的設計、施工、機械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成土石方開挖15000萬立方米、混凝土澆注1500萬立方米、發電機組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能力。
  3. Dbw, sbw series single - phase and three - phase super power voltage regultor of new age having the advantages of large capacity, high efficiency, wide range, high precision, strong protection, without wave - form distortion, reliadle operation and casy installation, etc

    Sbw系列單、三相大功率電力穩壓器是我公司在參數照國際同類產品、結合我國國性的基礎上研製生產的新一代節能電力穩壓器,具有容量大、效率高、穩壓范圍寬、精度高、保護功能強、無波形畸變、運行可靠、維護簡便等特點。
  4. Capacity of the output contacts is 150 w 1250w, max. working current is 5 a, but arc extinction is not permitted. mechanical data and installation

    裝置出口接點和信號接點最大允許接通功率為150w或1250va ,最大允許長期接通電流為5a ,且不允許斷弧。
  5. In the 1990s, the booming of plastics processing industry had spurred on the requirement of po resin and almost all the domestic po installation production had surmount the designed capacity

    20世紀90年代,塑料加工業的興旺帶動了對聚烯烴樹脂的需求,國內幾乎所有聚烯烴裝置的生產都突破了其設計能力。
  6. C. 1 control of customer - supplied documents and data ? the organization shall establish and maintain a documented procedure ( s ) to control all customer - supplied documents and data ( e. g., network architecture, topology, capacity, installation termination assignments, and database ) if these documents and data influence the design, verification, validation, inspection and testing, or servicing the product

    客戶提供文件及數據控制組織將建立並且維護文件化程序以控制所有客戶提供的文件和數據(例如,網路體系結構,布局,容量,安裝結束任務及數據庫)如果這些文件和數據影響設計,驗證,確認,檢查及測試,或服務于產品。
  7. I plant located in the " chinese silk screen of the township " hebei anpingxian ' s chengdong development zone, protective network is the largest local production, marketing leading enterprises one from the plate with yuan, wire drawing, welding to spray, jin su finished the installation, production, servicing capacity

    我廠位於「中國絲網之鄉」河北省安平縣城東開發區,是本地最大的防護網生產、銷售龍頭企業之一,具有從盤元、拔絲、焊接到噴、浸塑成品安裝、生產、服務能力。
  8. High interrupting capacity, fast fusing speed, reliable analysis for low rate overload current, outstanding current limitation, small fusing i2t, low power loss, small volume and light weight only 25g as well as easy installation, etc.

    分斷能力高熔斷速度快低倍過載電流可靠分析限流特性顯著熔斷i2t小功率損耗低體積小重量僅為25克安裝方便
  9. Moreover, under the air pollution control ( furnaces, ovens and chimneys ) ( installation and alteration ) regulations, for a pet cremator ( and any other cremators ) of an installed capacity not high enough to be classified as a specified process, if it consumes more than -

    此外,根據《空氣污染管制(火爐、烘爐及煙? ) (安裝及更改)規例》的規定,如寵物焚化爐(及其他所有焚化爐)的裝置能力未達指明工序規模,但其使用燃料的總量超過下列數值-
  10. For the cooling system capacity of no4 main transformer in jinmen thermal power plant being inefficient, through technical analysis, the design of new cooling system was put forward and the installation process was introduced

    摘要針對荊門熱電廠4號主變冷卻系統存在冷卻容量不夠等問題,進行了技術分析,提出了新冷卻系統的設計並介紹了其安裝過程。
  11. Hotel is equipped with 366 rooms and suites with free broadband access, 3 multi - functional conference halls with 800 people capacity respectively, 6 multi - specification meeting rooms, luxurious chinese and western dinner halls, high - grade single - rooms, barbecue by pond, golden beach you can enjoy dignified honor and courtesy in the fashionable and luxurious gulf club with the area of 3, 000 square meters, which is equipped with first - class sound installation, novel and elegant performance hall, individuality ktv boxes, studio halls presenting classical and fashionable movies, professional sauna massage, fitness center, water - treatment massage, seascape crystal swimming pool, up - to - international tennis court and unique cigar bar

    酒店擁有各式客房366間,免費寬頻上網三間容納800人大型多功能會議廳,六間容納100 - 150人的多種規格會議室,豪華中西餐廳高檔包間,池畔燒烤黃金沙灘擁有一流音響設備近3000平方米的高檔豪華海灣會,更給您增添一份驚喜:新穎別致演藝廳個性化ktv包廂懷舊品新影視廳專業桑拿按摩健身中心水療推拿海景水晶泳池國際標準網球場,還有獨具特色的雪茄吧,讓您真正享受至尊禮遇!
  12. The plans included the establishment of dams, for the purpose of increasing the reservoir s capacity to 194 million gallons, the construction of pumping stations and the installation of pumping machines

    漆鹹的計劃草案較具體的工程內容包括了興建水壩(使水塘容量增加至1 . 94億加侖) 、抽水站及加設抽水機,整體工程費用預算為78萬港元。
  13. Definitions for cables, wires and flexible cords for power installation ; current - carrying capacity

    電力裝置用電纜電線和軟線定義.第8部分:電流負荷能
  14. Capacity will be further enhanced. the installation of the automatic train protection ( atp ) signalling system in 1998, and the arrival of 96 new train cars in 2001 and 2002 will increase east rail s capacity by another 20 %

    東鐵於一九九八年安裝了列車自動保障信號系統,加上二零零一及二零零二年會有九十六個新列車車廂運抵,可將東鐵的載客能力再增加百分之二十。
  15. " this was due in large part to the substantial investment we have been making to enhance our productivity, by completing both refurbishment of our entire east rail fleet of trains and installation of an automatic train protection signalling system on the same line, " he said, adding both measures would increase east rail s passenger carrying capacity by 38 %

    他說:有此佳績,主要是因為我們致力提升生產力,並為此作出重大投資,包括全面翻新東鐵車廂,以及在東鐵安裝列車自動保障信號系統。這兩項措施使東鐵的總載客能力提高了百分之三十八。
  16. Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station

    雲南省瀾滄江小灣水電站位於雲南省南澗縣和風慶縣的交界處,最大擬建壩高292m ,裝機容量420萬千瓦,屬特大型水電工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖高度達80m ,開挖對邊坡的穩定性產生很大的影響。該邊坡的穩定性對水電工程建設的順利進行。
  17. Our company not only has the strong technical strength, but also owns the large production capacity and abundant experiences in installation and commissioning

    不僅技術實力雄厚,而且還擁有雄厚的設備製造和安裝調試經驗。
  18. To cater for our future capacity expansion, further enhancement and upscaling of the effluent discharge facilities including installation of new water recycle system and effluent treatment plant have been implemented by phases.

    有關的設施包括全新的污水循環系統及排放系統,目前正分期興建,並可完全應付未來廠房的產能增加時需要。
  19. In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil

    摘要針對長江口深水航道治理二期工程施工過程中遇到的堤身在波浪重復荷載作用下地基土出現軟化、承載力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高效的深水砂被鋪設和海上塑料排水板打設施工工藝及專用船機設備,探索了一整套帶橡膠阻滑板的沉箱預制施工工藝,確保了抗軟化工程措施的有效實施。
  20. The company has 52 ( sets ) large and medium type equipments. so it has the capacity of installing large, medium and small type cement complete set equipments and mine, metallurgy, machinegy - electronic equipments. its installation capacity and technical forces are at the lead level among the same domestic industry

    朝陽重型安裝有限公司擁有大中型設備52臺(件) ,完全具備了大、中、小水泥成套設備及冶金、礦山、機電設備的安裝能力,安裝能力及技術力量居國內外同行業中領先水平。
分享友人