installation site 中文意思是什麼

installation site 解釋
安裝場所
  • installation : n. 1. 就職,就任,就職禮。2. 裝置,設備。3. 安裝;設置;安置。4. 軍事設施。
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  1. Installation of the unitized curtain wall system on site

    工地進行組合式幕墻系統安裝。
  2. After considering explanations of the scenic spots and characteristics of tourists, ten planning requirements were identified : formation of guide teams, analysis of the main objects of self - guided trail explanations, consideration of resources to develop trails, determination of the interpretive themes, selection of site descriptions, writing of the plans, design of the interpretive signs, evaluation and revision of the signs, manufacture and installation of the signs, and overall evaluation of the interpretive sites

    以人本主義思想與后現代主義思想為指導原則,結合旅遊景區解說資源的特性與遊客特徵,分析出自導式解說步道規劃包含組建解說隊伍,決定解說受眾,調查解說資源,確定解說主旨,決定解說細節,撰寫解說計劃,設計解說牌示,評價與修改,生產與安裝牌示,解說點評估等10個具體步驟,並對各個具體步驟進行了探討。
  3. Free training shall be provided on site for whole installation and commissioning period

    安裝調試期間免費提供技術咨詢、現場服務指導、培訓。
  4. Pipeline installation site

    現場管線安裝
  5. Supervise mill site piping installation construction

    監督製造現場的管道安裝建設。
  6. In the design of residences, the installation site of fuel gas measuring meters shall be set in the space for common use outside residence units, except those not having relevant designing conditions

    住宅設計時,應當將燃氣計量表的安裝位置設置在住宅單元外的共用部位,但相關設計條件不具備的除外。
  7. Owing to supply by stated length, in the process of installation, the length of toe plate after fixed maybe inconsistent with length of platform, which require installer cut to use on site

    由於踢腳板是按一定的長度提供的,因此,在踢腳板的安裝過程中,有可能踢腳板連接后的長度與平臺長度不一致,這就要求施工人員在現場截取。
  8. Installation of domestic heating and cooking appliances burning solid mineral fuels - recommendations for design and on site installation

    燃燒固體燃料的家用採暖設備和灶具的安裝.設計與現場安裝推薦標準
  9. Together with our customers at the installation site, if necessary we proceed to analyse all requirements, define core properties, analyse mounting and usage conditions and often already develop initial approaches to a solution at that stage

    我們與客戶一起如果需要,就在安裝現場分析所有的要求,定義關鍵屬性,分析安裝和使用環境。但通常在與客戶一起分析前,我們已經做出了原始的方案。
  10. At installation site. 3. the capacitance tolerance in each serial group and segment shold no more than 0. 5 %. the ratio between maximum value and minimum value of capacitance which is measured at any two termin - als of capacitor unit in three phases should no more than 1. 02

    3 .電容器內部每個串聯組串聯段間的電容之差不大於0 . 5 % ,三相單元中在任何兩個線路端子之間測得的最大電容與最小電容之比不超過1 . 02 。
  11. Through analysis of instability probabilistic indices ( plos ), it is found that in different installation site, or with different control system parameters, or using different control strategies, the effects of facts to hybrid power system are different. therefore, how to further develop advantages of facts elements is the emphasis of the future work

    通過對系統的失穩概率指標( p _ ( los ) )的分析,得出不同的安裝地點、不同的控制系統參數、不同的控制措施的採用, facts元件對混合系統的穩定性影響也不盡相同,因此如何合理有效地將facts元件的優點發揮到最大將是以後工作的重點。
  12. 3. there should be no hazardous gas, steam and conductive explosive dust exist at installation site

    3 .安裝場所應無有害氣體及蒸汽,應無導電性或爆炸性塵埃。
  13. 1. capacitor installation is sorted into indoor and outdoor type. the ambient temperature range for capacitor installation and operation : - 40 b. there should be no corrosive gas, steam, conductive explosive dust and strong vibration exist at installation site

    1 .裝置分為戶內櫃式和戶外框架式,環境空氣溫度類別- 40 b安裝使用場所應無導電性或爆炸性塵埃應不含對金屬有嚴重腐蝕的氣體及蒸汽應無劇烈機械震動。
  14. In the afternoon, all dealers visited shanghai jielong china - daily paper co., the csrs demo installation site in shanghai and all felt excited and appreciated the high efficiency of the system

    下午,全體代理商前往設備安裝地點,上海界龍中報有限公司參觀,並對設備的實用效果感到興奮和贊賞。
  15. Abstract : this paper summarizes installation and test of mine car rollovermachine rowa at north entrance of qingling tunnel. it briefly describes selection of installation site, foundation construction, mechanical structure, and installion and test of electric and hydraulic system

    文摘:本文通過總結進口rowa礦車翻轉機在秦嶺隧道北口的安裝和調試過程,對翻轉機的安裝場地選擇、基礎施工、機械結構件、電氣以及液壓系統的安裝和調試方面,進行了簡要的敘述。
  16. Fit for observation. decision of gauge diameter ( shape dimension ) should be based on installation site and illumination condition

    適于工作人員的觀測。根據檢測儀表所處位置和照明情況選用表徑(外形尺寸)不等的儀表。
  17. 5. the knockdown design is applied to all kinds of water storing volume and installation site limit

    5 .組合式設計適合各種儲水量要求及安裝場地限制。
  18. 3. there should be no strong vibration at installation site

    3 .安裝場所應無劇烈的機械震動。
  19. 2. there should be no strong vibration at installation site

    2 .安裝場所應無劇烈的機械震動。
  20. 7. there should be no strong vibration at installation site

    7 .安裝運行地點應無劇烈振動或顛簸。
分享友人