installation specifications 中文意思是什麼

installation specifications 解釋
裝配指導書
  1. Its owner has to submit the plans and specifications of the cremator to epd for approval not less than 28 days prior to its installation, and should only install and operate the cremator after the plans and specifications have been approved

    其擁有人必須在安裝焚化爐前不少於28天,向環保署呈交焚化爐的圖則及規格,並須在獲得該署批準圖則及規格后,方可安裝和操作焚化爐。
  2. Specifications for manufacture, installation and acceptance of steel penstocks

    壓力鋼管製造安裝及驗收規范
  3. Through analysis of the change of the specifications of the clothing wires made of alloy steel before or after the tempering process, the paper puts forth that installation of tempering device after the punching and quenching process is helpful to better quality of clothing wires, improving the color difference of clothing and prolong the service life of clothing

    摘要通過分析合金鋼針布齒條回火前後各項指標的變化,指出在沖淬工藝后加裝回火裝置有助於提高金屬針布性能,改善針布齒條色差,延長其使用壽命。
  4. Ansi a108. 1 - 1992 specifications for installation of ceramic tile with organic adhesives or water cleanable tile setting epoxy adhesive included in ansi a108. 1 - 1992

    用有機粘結劑或水可洗環氧樹脂陶瓷磚粘結劑鋪設瓷磚的規范
  5. Aeronautical ground lighting electrical installation. isolating transformer. equipment specifications and tests

    航空地面照明電子設備.絕緣變壓器的設備規范和試驗
  6. Aeronautical ground lighting electrical installation - isolating transformer - equipment specifications and tests

    航空用地面照明電氣設施.隔離變壓器.設備規范和試驗
  7. Provisional specifications for supervision of postal equipment installation engineeing

    郵政設備安裝工程監暫行規定
  8. Specifications for construction and acceptance of high voltage electric devices installation

    電氣裝置安裝工程高壓電器施工及驗收規范
  9. Part common to dtu 26. 2 and dtu 52. 1 - installation of insulating undercoats under floating screed or plates, slab and under tiles - technical specifications

    Dtu 26 . 2和dtu 52 . 1的通用部分.抹灰準條或樣板平板和瓷磚下絕緣內塗層的鍍塗.技術規范
  10. Operation of power installation ; supplementary specifications for electro fishing installations

    電力設備的運行.第5部分:電氣捕魚設備的補充規范
  11. Specifications for polymer modified cement grouts for ceramic tile installation

    陶瓷磚鋪設用聚合物改良水泥薄泥漿規范
  12. Ansi a108. 1 - 1992 specifications for contractors option : installation of ceramic tile in the wet - set method with portland cement mortar or installation of ceramic tile on a cured portland cement mortar bed with dry - set or latex portland cement mortar included in ansi a108. 1 - 1992

    簽約人的選擇規范:用濕處理方法使用普通水泥砂漿鋪設瓷磚或用干處理方法使用普通水泥砂漿層或乳膠普通水泥砂漿鋪設瓷磚
  13. Has four main workshops for castings processing, steel parts processing, installation and debugging and spray painting. the company mainly produces plastic injection molding machines in more than ten specifications and models with injectioncapacity of45 - 2, 500g and mold clamping force of 500 - 5, 000kn. the major parts such as electric equipment as well as hydraulic and sealing parts all employ advanced imported products, which have greatiy improved the precision and stability of the plastic machines

    設有鑄件加工鋼件加工安裝調試噴漆四大車間,主要生產注射量45 - 2500g ,合模力500 - 5000kn共十幾種規格型號的塑料注射成型機電器液壓和密封件等主要部件均採用先進的進口件,使
  14. Specifications for installation of ceramic tile on a cured portland cement mortar setting bed with dry - set or latex portland cement mortar included in ansi a108. 1 - 1992

    用乾的或漬漿的波特蘭水泥灰漿在彎曲的波特蘭水泥灰漿層上安裝瓷磚的規范
  15. Specifications for nonferrous metal mine shaft to installation engineering construction and acceptance

    有色金屬礦山井巷安裝工程施工及驗收規范
  16. Beijing jiade shichuang refrigeration equipment co., ltd is a professional company engaged in installation of freezing, refrigerating, air - conditioned fresh keeping and deep freezing equipments with various specifications

    北京嘉德實創製冷設備有限公司專業安裝各種規格的冷凍、冷藏、氣調保鮮及速凍設備。
  17. Specifications for installation of ceramic tile in the wet - set method, with portland cement mortar

    用波特蘭水泥灰漿用濕固定法安裝陶瓷磚的規范
  18. Buyer shall be responsible for timely completion, in accordance with the installation timetable herein, of any necessary on - site preparations and modifications of buyer ' s facilities based on the specifications set forth in the site preparation guidelines previously provided to buyer

    買方應根據本合同的安裝時間表,按照預先交給買方的場地準備指南所規定的規格,負責按時完成任何必要的現場準備及買方設施的修改。
  19. Ansi a108. 1 - 1992 specifications for installation of ceramic tile with modified epoxy emulsion mortar grout included in ansi a108. 1 - 1992

    使用改良環氧乳狀砂漿薄泥漿鋪設瓷磚的規范
  20. Ansi a108. 1 - 1992 specifications for chemical resistant furan resin mortars and grouts for tile installation included in ansi a108. 1 - 1992

    瓷磚鋪設用耐化學藥品呋喃樹脂砂漿和薄泥漿規范
分享友人