intake construction 中文意思是什麼

intake construction 解釋
進水建築物
  • intake : n 1 吸入,納入,收納。2 進水口 (opp outlet); 輸入端,(礦井的)進風巷道,通風孔。3 吸氣,進氣。...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. " the public housing development at area 4c and 38a in heung fan liu, with a planned population of 17, 500, is under construction and will start intake in early 2006, " the spokesman said

    發言人說:香粉寮第4c及38a區正在進行公共房屋發展,計劃供17 , 500人居住,預期於2006年年初入夥。
  2. For intake system, adopting the resonant intake manifold construction, make use of the intake motive effect to increase volumetric efficiency ; adopt measure to prevent the heat transmit between intake pipe and exhaust pipe, lower the intake air temperature to increase volumetric efficiency

    對于進氣系統,採取諧振進氣的結構措施,利用進氣動力效應來提高進氣充量;採取進、排氣管隔熱措施,降低進氣溫度來提高進氣充量。
  3. Prediction of the air temperature in the intake shaft during construction period of a deep mine

    深井建井期入風井簡風溫的預測
  4. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Construction of lagoons reservoirs in the reclamation area will block existing pumping station intake and outfall pipes

    -在填海區內興建瀉湖蓄水庫會阻礙現有抽水站的進水及排水管道。
  8. Investment spending slowed down abruptly after the first quarter of 2001, as the dim business outlook deterred machinery and equipment intake, and as building and construction activity slackened amidst the subdued property market and the substantial cut - back in public housing production

    投資開支則在第一季后急速回落,原因是機器及設備吸納受營商前景黯淡所抑制,而物業市道淡靜和公營房屋興建量大幅縮減亦令樓宇及建造活動放緩。
  9. Impacts of the construction of key water conservancy projects in the yangtze river and sea level rise on water quality of shanghai water intake

    三峽與南水北調工程建設及海平面上升對上海城市供水水質的可能影響
  10. Anchorage cable construction on intake side slope and quality control in sanxia underground power station

    三峽地下電站進水口邊坡錨索施工及質量控制
  11. Construction of roads and other infrastructure commenced in january 1999 for completion in phases to meet the population intake there

    為配合居民遷入,道路和其他基建工程已於一九九九年一月展開,並會分階段完成。
  12. The new typhoon shelter opened in 1991, while reclamation of the old typhoon shelter was completed in mid - 1997. construction of roads and other infrastructure commenced in january 1999 for completion in mid - 2003 to meet the population intake there

    為配合居民入住,道路和其他基建工程已於一九九九年一月展開,預期在二零零三年年中完成。
  13. Reduce the intake of mixed construction waste at landfills

    減少堆填區接收混雜的建築廢物。
  14. Moreover, the effects of the resonant intake manifold various construction parameters on volumetric efficiency are analyzed in this paper, and the best project is provided for the model 4108q diesel engine

    文中還計算分析了諧振進氣系統各結構參數對充量系數0的影響規律,為lf4108q型柴油機利用諧振進氣系統改善其性能,提供一個最佳方案。
分享友人