interval operation 中文意思是什麼

interval operation 解釋
間期手術
  • interval : n 1 (空間方面的)間隔;空隙。2 (時間方面的)間隔,間歇;工間休息,幕間休息。3 【軍事】(各小隊...
  • operation : n 1 動作,行動,活動;業務,工作;作用。2 效果,效力;有效范圍,有效期間。4 【數學】運算;【醫學...
  1. Issuers collect fund for infrastructure or operation through issuing securities and retain liability at the same time. issuers are obligated to repay the bondholder the principal amount and interest at a specific interval. in the mean time, this liquidized iou is called " bond "

    當發行人透過發行有價證券,直接或間接地向投資大眾籌措建設經費或營運所需資金,並相對地承擔債務亦即發行人承諾按時支付本金或票面利息給債券持有人之時,該種具有流通性表彰債權之借款憑證,即謂之債券。
  2. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  3. By studying on different operation mode and different interval flood of longyangxia reservoir, as well as the flood propagation time, pre - alarm scheme is established, which can alarm in order to lower construction losses when flood is in excess of standard

    通過研究龍羊峽水庫的不同運行方式和不同頻率的區間洪水,以及水量傳播時間的研究,得出預警方案,當發生超標準洪水時,提前報警使施工損失降低到最小。
  4. In respect that, the concept of region which is made up of infinite interval sequence is introduced. based on this, unary operation about region and binary relationship between region is defined

    基於上述考慮,在本文中,我們提出了由區間的無限序列組成的區域的概念,定義了區域的一些一元運算和二元關系。
  5. On base of analysis of the main factors of construction risk, interval flood character, operation mode of longyangxia and gongboxia reservoirs, the risk of longyangxia reservoir in different operation mode is estimated

    通過對施工渡汛風險的主要因素、區間洪水特性、龍羊峽和李家峽水庫的運行方式等方面的分析和計算,得出龍羊峽水庫不同運行方式下的風險率。
  6. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間洪水特性和黃河上游梯級運行特點,針對龍羊峽水庫實際運行狀況,分析不同狀態下的龍庫運行方式對公伯峽水電站的施工渡汛影響。
  7. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  8. In this article, according to heat conduction theory and finite element theory, the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, thermal insulation change, surrounding temperature change and water storage on temperature field in the arch dam are also considered

    論文根據熱傳導理論及有限元理論,用三維有限元浮動網格法對施工期和運行期溫度場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、絕熱溫升過程及壩體材料分區、水庫分期蓄水和環境溫度變化等因素對壩體溫度場的影響。
  9. Based on analyzing discharge data in guide, xunhua, tongren hydrologic station and river course character, propagation time of different discharge in different river course is presented, and prediction period of interval flood, main stream flood during construction and operation period are acquired

    通過對貴德、循化、同仁水文站流量資料以及河道特性的分析研究,得出不同流量在不同河道上的傳播時間,歸納出區間洪水和幹流洪水在施工期和運行期的預見期。
  10. Improving blasting performance and reducing operation cost by means of adopting sublevel interval charging

    採用分段間隔裝藥技術提高爆破質量降低采礦成本
  11. Results : there were no differences between the two groups in terms of operating time, postoperative pain, nausea or vomiting, pain - free interval after operation, analgesic requirements or patients ' satisfaction with the method of anaesthesia

    結果:兩組之間的手術時間、術后疼痛、惡心或者嘔吐、術后無痛間隔時間、止痛劑需要量或者患者對麻醉方法的滿足程度均沒有差異。
  12. The influence of specific charge, hole arrangement, charge structure, stem length, millisecond interval and ignition mode on the yield of the blasted boulder is analyzed some measures to lower boulder yield in deep hole blasting of underground mine are presented through the optimization of blasting operation parameters as follows : lowering deep hole blasting effect of geology structure, rationally determining specific charge, using technique of wide - space small burden blasting, technique of manifold charge structure and technique of millisecond compression blasting, strengthening the management of boring construction and blasting construction

    該優化技術措施主要有:減少地質構造對深孔落礦的影響,合理確定炸藥單耗的方法,使用大孔距小抵抗線落礦技術,採用多種裝藥結構技術,採用多排微差起爆技術,加強深孔的施工管理和加強爆破施工的現場管理。
  13. Therefore, it is insufficient to test computer hardware for proper operation during a one hour interval, when the system will be called upon in worst case conditions to run continuously for 14 days at a time

    因此,如果要求系統要在最惡劣的環境連續運轉14天,那麼對計算機硬體進行為期1小時的正確操作測試是不夠的。
  14. An interval optimization approach is introduced in modeling of reservoir flood operation by the description of interval mathematics. a method of interval optimization in solving reservoir optimal dispatching model is introduced and developed

    在對區間數學進行描述的基礎上引入區間優化方法,對水庫防洪優化調度問題建立了區間優化模型。
  15. So it can be used as one part of the industrial process control or a valuable associated software for analyzing and simulating control systems. iterative learning control based on the study of robotic control adjusts control input repetitively with simple learning control algorithms, using input and output data of the previous operation over a fixed time interval, until perfect tracking is achieved

    在機器人背景下發展起來的迭代學習控制對解決具有某種重復運動(運行)軌跡跟蹤問題具有獨特的能力,本文研究的目的是利用迭代學習控制理論為一般控制系統的設計性能優良的控制器,以期擴大迭代學習控制的應用領域。
  16. Based on velocity and interval between vehicles during driving which are the two most important factors related to safety, the time relationship between surrounding perceiving, decision making, operation, vehicle response and driving speed is analyzed

    以汽車駕駛中行駛速度和與車距這兩個重要安全因素為基礎,分析了汽車行駛中感知、判斷決策、操作和汽車響應與速度的時間關系。
  17. Pneumatic and automatic separator of injector valve and orifice is based on pneumatic measurement and 8051 mcu, which is used for data processing and control. it can automatically separate injector valve and orifice, whose nominal size is 6 and tolerance is + 10u, with the interval of 1u, accuracy of 0. 5u and speed of twenty pieces per minute around. the automatic separation system of injector valve and orifice has low cost, high separation accuracy, high separation speed and easy operation

    使用氣動噴油嘴偶件針閥、針閥體自動分選系統能實現對公稱尺寸為6 、公差為10的噴油嘴偶件針閥、針閥體按1分選間隔、 0 . 5分選精度的自動分選,分選時的速度可達每分鐘20件左右。
  18. Starting from the time theory and the temporal logic, and taking into account the dynamic properties of multimedia performance, the extended uncertain interval relationships set adapting to describe the multimedia system is proposed. by deducing in theory, it is simplified to a very plain temporal model that has only 6 canonical operation symbols. 2

    從時間理論和時態邏輯的途徑出發,結合多媒體表現的動態特性,通過分析推導得出適合多媒體系統的非確定的時間片關系的擴展集,並將其簡化為只有6個操作符規范的、非常直觀的多媒體時態模型。
  19. Moreover, we proposes an average factor in the process of approximate reasoning based on interval - valued fuzzy sets in a double - input - single - output approximate reasoning scheme in this paper. the method proposed can simplify the process of operation and quicken the pace of reasoning

    本文在基於區間模糊集的雙輸入單輸出系統近似推理的過程中引入了平均因子,這種方法能夠簡化運算過程、加快推理速度。
  20. As per optimal operation pattern function with annuals cycle, each decision of annual cycle and corresponding operating factors in the light of observed value of random variable, regression analysis at each time - interval is carried out and then regression equation will be as the operation function to guide cooperating operation for group hydropower station

    依據優化調度模型函數,以年為周期,將各年周期的決策值及其相關的運行要素作為隨機變量的觀測值,逐時段做回歸分析,並將其回歸方程作為指導水電站群聯合運行的調度函數。
分享友人