investment schedule 中文意思是什麼

investment schedule 解釋
投資表
  • investment : n. 1. 投資;投資額;(時間、資本等的)投入;投入資金的東西。2. 授職(儀式);授權。3. 包圍,封鎖。4. 覆蓋。
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. Rapid prototyping technology changed the traditional pattern of product design, which could offer product sample for the designer, reduced design cycle and quicken the schedule of new product design, and it gave the decision - makers visual feeling. ; rp technology provided kinds of molds including resin - boncled mold laminate mold, investment mold and lost foam casting mold and so on for sand casting investment casting and cavityless casting, it could also use direct shell production casting to make pattern dies metal dies die - casting dies injection dies directly, and it could even produce casting products in small scales. the applications of fdm technology in plaster precision casting and the rapid casting technology based on sls technology were introduced, the organic combination between rapid prototyping tecnnology and foundry process, which initiated a new period of rapid manufacturing metal parts, by using advanced new technology alternated traditional foundry industry to make it looked brand - new, thus, the competition of foundry industry would be improved ; rapid prototyping technology offered a rapid economical feasible technical method, common processes of using rapid prototyping technology to produce dies were discussed, in the paper it explored that. the problem of combining rapid prototyping technology with electric arc metal - spraying technology to make metal dies and technics in dies manufacturing of combining rapid prototyping technology with precision casting, rapid tooling based on rapid prototyping, integrated advanced new technology and tradition technology of rapid prototyping manufacture, each superiority were exerted, rapid prototyping technology had been an efficiency measure to rapid update products and develop new product, and to middle -

    快速成型技術改變了傳統的產品開發模式,可以為設計者提供產品樣件,縮短設計周期,加快新產品的開發進度,為決策者提供直觀性;快速成型技術迅速提供砂型鑄造、熔模鑄造、實型鑄造用的各種模樣,包括樹脂模、層壓模、熔模和消失模等,還可採用直接制殼鑄造法直接製造熔模鑄造用的壓型、金屬型、壓鑄型、注塑模,甚至直接製造小批量鑄件,介紹了熔積成型技術在石膏型精密鑄造上的應用和基於選擇性激光燒結技術的快速鑄造技術,快速成型技術與鑄造工藝的有機結合,開創了快速製造金屬零件的新階段,對用高新技術改造傳統的鑄造工業,使其面貌煥然一新,增強鑄造行業的競爭能力;快速成型技術為母模的製造提供了一條快速、經濟、可行的技術途徑,討論了利用快速成型技術製造模具的一般工藝方法,探討了將快速成型技術與金屬電弧噴鍍技術結合起來快速製造金屬模具問題,以及快速成型技術與精密鑄造技術相結合的模具製造工藝,基於快速成型製造的快速模具技術,集成了快速成型製造高新技術和傳統技術,發揮各自優勢,已成為產品快速更新換代和新產品開發及中、小批量生產的有效手段之一。
  2. Main contents including agriculture, forestry, animal husbandry, greenhouse farming and processing industries etc. were studied seriously. in chapter four, the author analyzed the scale, structure and investment schedule of the construction projects in the sic - tech district, and evaluated the economic effect of projects

    主要內容包括以林、草、畜、設施農業及加工業開發的目標、任務和規模;總體規劃的技術經濟指標和控制指標,土地開發利用、管理中心布局和生產構成,水利工程、防護林體系、道路、交通、附屬設施建設等方面。
  3. If the hedged risk is an interest rate risk or risk of repayment ahead of the schedule, the held - to - maturity investment shall not be designated as a hedged item

    被套期風險是利率風險或提前還款風險的,持有至到期投資不能指定為被套期項目。
  4. Following this principle, dpc adopted the method of " goal management ", i. e. disintegrating the three goals of investment, schedule and quality to different levels in accordance with different administrative levels to keep their consistency generally. moreover, dpc tried some effective new pattern such as in - phase management, strategic pass management and block management to shorten the time limit on the premise of ensuring the project quality. using some effective science way and modern management technology such as key line method to realize the reasonable resources allocation, including human resource, material resource and financial resource

    在這一理念的指導下,大連石化分公司運用了目標管理,將投資、進度、質量三大目標層層分解,並保證目標點的設置和時間段的劃分切實可行,方便合理;目標分解結構在較粗的層次上與組織分解結構一致,實現了組織結構設計與目標分解設計的配套;努力提高作為建設單位為各參建方的服務意識,注重與參建各方的有效溝通和相關單位的全方位協調;採用同步管理、關口管理和分塊管理等多種有效的新模式,在保證工程質量的前提下,趕工期,搶進度;用關鍵線路法、凈值法等有效的科學手段和現代管理技術來實現建設工程中資源的合理配置。
  5. 2. the chinese and foreign investment partners must have already made their investment contributions pursuant to the schedule and amounts stipulated in the joint venture contract and these funds must have already been examined and verified

    中外合營者已經按合營合同如期如數出資並經過驗資,確因經營管理不善而難以維持的合營企業。
  6. R & d projects have some characteristics such as high technology, long life cycle, and large investment scale, which results in remarkable schedule risk problem

    研發項目技術含量高、研製周期長、投資規模大,進度風險問題非常突出。
  7. [ 3 ] contra posing the main abuse in traditional investment / schedule control method, the principle of the earned value concept ( evc ) measurement in quantity universally in the international is introduced to make conprehensive investment / schedule control

    ( 3 )針對傳統造價/進度控制方法的主要弊端,引入國際上通用的贏得值定量評估原理( evc )來進行造價/進度的綜合控制。
  8. Accordingly, place produces the analytic personage of research center of 3 class market to think in, from its the loan time limit of set and reimbursement means and month offer the characteristic with little, high interest to be able to see, " the balloon is borrowed " the person that do not suit all rooms to borrow, accord with the following the crowd of 4 features can consider to choose " the balloon borrows " : it is to consider short - term room to borrow, have ahead of schedule the person buy a house of reimbursement demand ; 2 it is to anticipate future is shorter fixed number of year ( the 10 years longest ) in oneself capital actual strength can have bigger rise or the person buy a house that later period will have big fund to enter zhang ; 3 it is loan period repays only less month is offerred, use the others money to other investment channel, invest strategic eye and the house property investor that dare to assume a risk with obtaining what invest redound higher to have ; the 4 house property consumer that are estate of the good - paying in applying to

    因此,中原地產三級市場研究中心的分析人士認為,從其設定的貸款期限和還款方式以及月供少、利息高的特點可以看出, 「氣球貸」並不適合所有的房貸者,符合以下4個特徵的人群可以考慮選用「氣球貸」 :一是考慮短期房貸,並有提前還款需求的購房者;二是預期未來較短年限(最長10年)中自己的資金實力會有較大提高或後期將有大額資金進賬的購房者;三是借款期僅償還較少月供,將其餘款項運用至其他投資渠道,以獲得更高投資回報的具有投資戰略眼光和敢於承擔風險的房產投資者;四是適用於中高收入階層的房產消費者。
  9. [ 4 ] investment / schedule target risk analysis is a new demand to project managemeimt engineeis. a study of the main content of risk analysis of construction project management is made, and an elementary research on the application of computer simulation to the investment / schedule risk analysis is carried out

    ( 4 )造價/進度目標風險分析是監理規范對監理工程師的新要求,對監理風險分析的主要內容進行了研究,並就計算機模擬在造價/進度目標風險分析中的應用進行了初步探索。
  10. After analysising the five factors ( schedule, quality, investment, claim, risk ) which influence the limit point, this paper presents that the clients should decide the time for the construction in accordance with their own characterististics and utilizing benefits, and decide the project quality according to the sum of purchasing costs ( the price of contracts ) and the utilizing costs ( the costs to run and maintain ), and make it most possible to use supervisim optimal design and construction and to reduce claim and risk, which gives the clients a satisfying project with minimal investmentat the same time, this article tells the contractors how to optimize and make decision to minimize the costs in practice on the basis of meeting the requirment of the clients

    在分析了影響極值點的進度、質量、投資、索賠和風險五大因素之後,提出了業主應結合自身的特點,根據工程使用效益來決定工期,根據購置成本(即合同價格)和使用成本(即運行費和維護費)之和來決定工程質量水平,並盡可能通過監理來優化設計、優化施工,減少索賠和風險,使業主最終既能得到滿意的工程,又能使總資金投入最小。同時,也指出承包商應如何在滿足業主要求的前提下,進行優化和決策,使實際發生的成本最小。
  11. Based on internal rate of return as dynamic index of financial evaluation, the authors quantitatively analyse the critical point of investment inflation for a project, which can be explained as follows. assuming that the project is in a definite time limit during which the internal rate of retum should not be less than minimun attractive rate of return ( marr ), an analysis is made on the critical value of allowable maximum inflation of investment cost. similarly, assuming that the project is in a definite investment, an analysis is made on the critical point of allowable maximum delay of time limit for the project. by critical analysis of inflation of investment and delay of time limit for a project, an investigation can be made on the capacity for a project to bear the risk of investment inflation and time limit delay ; and then a scientific basis can be offered for arranging invesetment and drawing up schedule of construetion

    根據建設項目財務評價的動態評價指標? ?內部收益率,定量地分析建設項目的投資膨脹臨界點.假設在工期一定情況下,研究分析項目的內部收益率應該至少等於國家規定的行業基準收益率時,其允許投資費用的最大膨脹臨界值.類似於投資膨脹臨界分析,假設在項目投資一定情況下,得到允許建設工期的最大膨脹臨界點.通過投資與工期膨脹臨界分析,可以考察投資項目承受投資增加和工期拖延的風險能力,為合理安排投資和編制施工進度提供科學依據
  12. From the side of supervision engineers and by means of investgation, demonstration and anaylysis, this article presents the same basis of the three targets - the schedule, quality and investment - in order to obtain the most economic effect. from theory, this article also gives the limit points to find the limit points to find the faster progess, the reasonable quality and minimal investment

    本文從監理工程師的角度出發,通過調查、認證和分析,提出工程項目監理的進度、質量、投資三大目標的共同基點是取得最大的投資效益,從理論上提出了如何尋求進度較快、質量適合、投資最省的極值點,並從業主的角度給出求極值點的量化公式。
  13. Enjoy whole life protection option to make single premium or schedule more payments for additional investment

    可隨時投入一筆過款項或增加定期供款作額外投資
分享友人