joint section 中文意思是什麼

joint section 解釋
合頁鉸頁片
  • joint : n 1 接合,榫接合處,接合點。2 【解剖學】關節。3 【植物;植物學】節。4 【電學】接頭。5 【建築】接...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. From the analysis, some suggestion about joint rigidity design is put forward : 1. joint initial rigidity can be enhanced within the limited range when to increase end - plate thickness ; 2. the rigidity and ultimate moment can be enhanced obviously when to adopt the beam with inclined section or to add axilla at the connections between beam and column ; 3. withm the permissive construction condition, exteriorly extended end - plate inclinedly placed is suggested to be applied firstly ; 4. when the rate of joint rigidity to beam rigidity, that is called, is less than 0. 1, the joints can be regarded as zero - rigidity joints ; on the other hand, if is more than 26, it is rigid connection joints

    採用斜截面梁並在樑柱交接處局部加腋能明顯提高節點剛度和梁的抗彎能力; 3在允許的施工條件下,應優先採用外伸式端板斜放節點,有利於提高節點剛度,進而提高節點的抗彎能力; 4節點剛度與其連接構件的剛度比值0 . 1時,可按鉸接節點設計; 26時,可按剛接節點設計。
  2. Method of macro test for section of spot welded joint

    點焊接頭截面肉眼檢測方法
  3. Backing weld procedure technique of all - position narrow gap and thick - walled pipe welding is developed about all - position single - pass welding section analysis, wire feeding behavior, weld arc length, welding current analysis, procedure and joint test. the achievement has general guide meaning to producing and testing all - position welder

    從單焊道全位置區段、送絲行為、焊接弧長(電壓) 、電流行為分析、工藝試驗和接頭檢驗等幾方面介紹管道全位置打底焊工藝特點,其研究成果對全位置焊接機的製造和調試具有普遍指導意義。
  4. Abstract : backing weld procedure technique of all - position narrow gap and thick - walled pipe welding is developed about all - position single - pass welding section analysis, wire feeding behavior, weld arc length, welding current analysis, procedure and joint test. the achievement has general guide meaning to producing and testing all - position welder

    文摘:從單焊道全位置區段、送絲行為、焊接弧長(電壓) 、電流行為分析、工藝試驗和接頭檢驗等幾方面介紹管道全位置打底焊工藝特點,其研究成果對全位置焊接機的製造和調試具有普遍指導意義。
  5. The work done in this paper is mainly as follows : ( 1 ) the wide beam should intrude to the wall at some length to make the flexural stress uniform along beam section width, thus make full use of the beam ' s bearing capacity and avoid the shear failure in the concrete joint. and it also prevents stress focus and concrete crack in the local shear wall

    關于寬梁與薄墻肢節點,可以得出以下幾點初步結論:寬梁應該深入墻肢一定的深度,以使寬梁截面的彎曲應力沿著梁截面寬度分佈均勻,充分發揮寬梁的抗彎能力,同時避免節點區混凝土的剪切失效,也避免剪力墻的局部因為受到的應力過大而拉裂。
  6. Based on the experiment results, the damage form of abnormal exterior joint are summarized, characteristics of hysteresis curve are studied, the effect of stirrup ratio and height of column section and beam section on anti - shear property of abnormal joint are discussed, working mechanism of abnormal exterior joint is researched, the conclusion that the anti - crack and bearing capacity of abnormal joint are studied by analyzing the minor core of abnormal exterior joint is proposed, the basic data is provided for the design formula of abnormal joints

    根據試驗結果,總結了異型邊節點的破壞形態,研究了節點滯回曲線的特徵,討論了節點核芯配箍率、樑柱截面高度變化對異型邊節點抗剪性能的影響,分析了異型邊節點的受力機理,提出應以「小核芯」為分析單元來研究此類節點抗裂和承載力的建議,為異型節點設計公式的建立提供了基礎數據。
  7. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  8. Based on the pseudo - static experimental results of nine abnormal joints, the damage process of abnormal joint is divided into four stages of original crack, entire crack, ultimate state and failure, the effect of axial force ratio, stirrup ratio and height of column section on seismic behavior of abnormal joint are discussed, the conclusion that anti - shear capacity of abnormal joint are studied in entire crack state by studying the minor core of abnormal joint is made, the calculating formula for anti - shear capacity of abnormal joint is proposed with a view to asymmetry in stirrup yield

    摘要根據9個鋼筋混凝土框架異型節點試件的擬靜力試驗結果,指出異型節點受力過程分為初裂、通裂、極限和破壞4個階段;討論了軸壓比、節點核芯配箍率、柱截面高度變化對異型節點抗剪性能的影響;提出應考慮節點核芯區箍筋屈服的不均勻性並在通裂狀態下以「小核芯」為分析單元來研究此類節點抗剪承載力的建議;最終給出了異型節點抗剪承載力的計算公式。
  9. Analysis of sino - french joint delimitation of the guangdong section in sino - vietnamese boundary

    中法會勘中越邊界粵越段之淺析
  10. The second section is concerned with joint crime theory related to the instigator in civil law

    第二部分大陸法系有關教唆犯的共同犯罪理論。
  11. Wong chi - kwong, 46, and co - defendant lok how - chuen, 47, a former cleaning subcontractor of citybus, faced a joint charge of conspiracy for public servant to accept advantages, contrary to section 4 ( 2 ) of the prevention of bribery ordinance. wong further faced another similar alleged offence

    黃志光,四十六歲,城巴前清潔督察,及另一被告駱孝存,四十七歲,城巴前清潔承辦商,同被控一項串謀使公職人員接受利益罪名,涉嫌違反《防止賄賭條例》第4 ( 2 )條。
  12. Study on regulation project for xuliujin joint - baimao sand bank section of yangtze river

    長江徐六涇節點和白茆沙河段治理工程研究
  13. The xibiehe section and xibiehe formation of the bateaobao area in darhan mumingan joint banner, inner mongolia

    內蒙古達茂旗巴特敖包地區的西別河剖面與西別河組
  14. The key factors affecting the stagnation point position of l - type pipeline section are the setting position of bellows type expansion joint and the bend angle degree

    影響水平轉角管段駐點位置的主要因素為波紋管補償器設置位置、彎頭角度。
  15. The calculation of stagnation point position of straight pipeline section with both movable ends and l - type pipeline section with bend at one end and bellows type expansion joint at other end is discussed

    摘要探討了兩側為活動端的直管段及一側活動端為彎頭,而另一側活動端為波紋管補償器的水平轉角管段駐點位置的計算。
  16. In this paper global joint planning for middle and low voltage network is considered. both line arrangement and cross section and transformer arrangement and rate are considered. it is a non - line combined optimum problem more complex than single network planning

    本文從整體的角度考慮中壓和低壓配電網路的聯合規劃,不僅考慮了線路走向和導線截面大小,而且考慮了變壓器的布置位置和容量,這是一個比單純的網架規劃更復雜的非線性組合優化問題。
  17. Design of locating apparatus for operation on femoral section prosthese of tumorous type artificial knee joint

    腫瘤型人工膝關節股骨段手術定位器械的設計
  18. In allusion to section modality and transverse joint of common span bridges, we choose two kinds of calculating theories in transverse distributing calculate process : the theory of rigidity crossbeam and the theory of hinged girder and slab. making the use of the theory of optimized design, i constitute mathematics model and choose appropriate calculated method. and find the form and detail dimension of section when beams of the bridge satisfy bending moment ^ shearing force and torsional moment

    在用橫向分佈理論計算單梁扭矩過程中,針對現有常用跨徑橋梁的截面形式和橫向連接狀況,選取了兩種計算理論:剛性橫梁法和鉸接梁(板)法,利用結構優化設計原理,建立主梁承載力的數學模型,選擇合適的優化計算方法,得出在滿足彎剪扭承載力要求時主梁的細部尺寸。
  19. Focus on the problems, three different typical section of mechanism and components was selected to be make computer programs in the research : the joint part with prime motor, the power transmission and the operator. the programs were designed in visual program langue visual c + +. the component ? solid modelings were made using the parametrize feature moulding software pro / e

    針對農業機械設計中存在的設計效率低下,設計手段落後,需要反復修改設計的問題,本研究以可視化的程序設計語言visualc + +為開發工具,以參數化的特徵造型軟體pro / e為造型工具,從與原動機聯接部分、動力傳遞部分、工作部件三個不同側面選取農業機械中典型的機構及零部件進行了計算機輔助設計,編制了參數設計的程序,並進行了實體模型的建造,大大提高了這些機構及零部件的設計效率,並為其它零部件的cad提供了參考。
  20. With checking and optimization, some rational suggestions on bridge location, shape and overall arrangement is put forward. after construction checking, the author also puts forward some requests for construction pre - cove and safety pier setting, at the same time gives optimum design on joint balance pier. construction structure checking indicated that not only the strength and stability coefficient of rotation stiffness framework is affluent, but also the section size

    通過驗算及優化,對該橋推薦方案的橋址、武漢理工大學碩士學位論文橋型及橋梁總體布置提出了合理化的建議;通過施工驗算,對施工預拱度及保險墩的設置提出了要求,對交界平衡墩進行了優化設計;施工結構驗算表明,轉體勁性骨架強度、穩定性富餘系數較大,截面幾何尺寸過大,結構設計過于安全保守,並提出了結構優化的方法,從而大大節省了工程投資,加快了工程進度,增強了橋梁的美觀。
分享友人