key construction 中文意思是什麼

key construction 解釋
重點工程
  • key : n 1 鑰匙。2 要害,關口,要沖。3 關鍵,線索,秘訣;解法。4 (外國書的)直譯本,圖例,題解,圖解,...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Based on the background of a city key construction project 棗 hongshan bridge, the loading characteristics of the deck system consisting of mutirow cantilever in composite structure of steel and concrete is studied in the thesis

    本文以長沙市洪山大橋為工程背景,對組成橋面板系的多排懸臂鋼-混凝土組合梁的受力特點進行了研究和探討。
  2. The keqikesubutai bridge is a long span railway bridge with high - rise piers located in the strong wind pressure and active seismic region, and is also a key construction project and the highest bridge on the jinghe - ining - horgus railway

    摘要克其克蘇布臺特大橋是一座位於高風壓、高地震區的高墩大跨鐵路橋梁,是精伊霍鐵路的重點工程之一,為全線最高橋。
  3. This project includes as follows : key construction of the incubator base of software industry of the high - tech research and development ( 863 ) programme, and the construction of zhongguancun software park, zhongyuancun life science and technology park, returned students pioneering park, zhongguancun environment science and technology demonstration park, zhongguancun yongfeng industrial base, northern shangdi quarter as well as western zhongguancun quarter and the industrialization ( beijing ) base of national integrated circuit

    重點開展國家863軟體產業孵化基地建設;中關村軟體園、中關村生命科技園、留學生回國創業園、中關村環保科技示範園、中關村永豐產業基地、上地北區、中關村西區的建設;國家集成電路設計產業化(北京)基地建設。
  4. To specify the project, by selecting materials, choosing construction methods, arranging construction process, locating expanding joints, disposing key construction, the outside shell temperature was controlled not exceeding + 25 at surroundings, which met the need of design and check requirement

    針對工程具體情況,通過材料選擇、施工方法確定、施工程序安排、膨脹縫的布置、關鍵結構的處理等問題,得出使爐墻外壁溫度控制在環境溫度+ 25的范圍內,滿足設計及施工驗收規范要求的方法。
  5. Manwan hydropower station, located in the middle stream of lancang river, is the largest state key construction project in yunnan province

    摘要位於瀾滄江中遊河段的漫灣水電站是雲南省至今投資最大的國家重點建設項目,電站建設和運行以來出現了一些社會、經濟和生態環境問題。
  6. The sun project is among the national key construction projects, which has four 300000 - kw condensing coal - fired generators with total investment of rmb 5. 5 billion yuan

    陽光發電公司工程是國家重點建設項目,總裝機容量為4臺30萬千瓦凝汽式燃煤發電機組,總投資約55億元人民幣。
  7. The development of zhongyuan urban agglomeration, as a key construction project of building a comfortably off society an all - round way in henan province, is being paid attention widely

    中原城市群經濟隆起帶作為河南省全面建設小康計劃的重點建設項目,其發展受到廣泛注視。
  8. On the left of the right side of the bill is a design of the monument of heaven that can be seen in a transparent area and on the right is an active holographic mark. on the reverse side is china millenium monument, a key construction marking advent of the millenium

    其主色調為金黃色,正面主景以北京九壁「升」為設計依據, 「 」的左側為「火珠」吉祥圖案,票面左側透明視窗為「天壇」圖案,右側為動態全息標志。
  9. Based on the project of the chenglingji tunnel acres the changjiang river, with adopting the drill - blasting method of constructing, the construction characteristics, construction principle, key construction technology and safety measures are introduced

    摘要結合城陵磯長江穿越隧道工程的工程實例,介紹了在越江隧道鉆爆法施工中,越江隧道工程的施工特點報和施工原則、關鍵施工技術以及安全措施。
  10. Key construction project of military colleges and schools

    軍隊院校重點建設工程
  11. Key construction projects ; key investment project

    分灶吃飯重點建設
  12. Key construction projects

    分灶吃飯重點建設
  13. The high pressure handed in and united the cable in the company in 2002, succeeded in investing the national key construction project of tens of billion yuan to win a bid - the purchase order of new bai yun international airport of guangzhou, and run well

    公司高壓交聯電纜,成功中標投資數百億元的國家重點建設工程廣州新白雲國際機場的采購訂單,且運行良好。
  14. Key construction project and likelihood happen serious and secondary the construction project of calamity, must undertake seismic security is evaluated ; the result that evaluates according to seismic security, decide aseismatic fortify asks, undertake aseismatic fortify

    重點建設工程和可能發生嚴重次生災難的建設工程,必須進行地震安全性評價;並根據地震安全性評價的結果,確定抗震設防要求,進行抗震設防。
  15. Through the practice of deep foundation top - down for youyou international square, some key construction techniques were introduced, including structure of bored and double stirring piles, down - top construction in high - rise buildings, top - down in low - rise buildings, protection of railways, methods for excavation

    摘要通過由由國際廣場深基坑逆作施工實踐,著重介紹了灌注樁加雙排攪拌樁止水帷幕圍護體系、主樓順作裙房逆作、電纜翻交、軌道交通四號線保護、挖土施工等關鍵施工技術。
  16. In order to provide data reference for ships equipped with anti - rolling tank, based on the item the anti - rolling tank test equipments on the ship among the country 211 key construction projects, the paper goes on deep analysis and research on test platform of tank and motion of rolling and swaying

    為了給實船裝備減搖水艙提供數據參考,結合國家「 211 」工程重點投資建設項目「船舶減搖水艙試驗裝置」的研製工作,本課題對水艙試驗臺架及橫搖、橫蕩運動進行了較深入的分析和研究。
  17. Foreign capital is mainly used in the key construction and in technology reformation of the existing enterprise

    外資主要用於關鍵的建設項目和現有企業的技術改造。
  18. During this period, the company accepted the internal and external decorating projects for yantai civil aviation building, the glass curtain wall project for the building of bank of china in jinan ( it lies in the most flourishing commercial area. it is a 25 - story building with a height of about 100 meters. the project costs about 10 million rmb ), the external vertical decorating project for jinan real estate building ( the project is a key construction project in jinan city

    2000年至今公司在總體規模、施工能力及管理水平上再上新臺階,在此期間,公司憑實力先後承接了煙臺民航大廈內外裝工程、濟南市中銀大廈玻璃幕墻工程(該工程位於濟南市最繁華商業區,共25層,高度約100米,專項造價約1000萬元) 、濟南市房產大廈外立面裝飾工程(該工程為濟南市政府重點建設項目,共26層,高度約150米,專項造價約1300萬元,公司為此動用了同濟大學專家設計力量及國內一流的施工隊伍) 、人民銀行濟南分行金庫單元幕墻窗工程等。
  19. The paper is based on the item the anti - rolling tank test setup among the school 211 key construction projects. tank system design, control method of tank and correlation technique of simulation of the test rolling table are investigated mainly. the paper introduces the classifications and characteristic of the anti - rolling tank and summarizes the state - of - the - art of the anti - rolling tank at home and abroad

    本論文u型減搖水艙和試驗搖擺臺實驗研究是基於學校「 211 」重點建設項目「船舶減搖水艙試驗裝置」進行的,主要研究u型減搖水艙系統設計、 u型減搖水艙控制方法和試驗搖擺臺模擬中的相關問題。
  20. The paper is based on the item the anti - rolling tank test setup among the school " 211 " key construction projects. the control method of the controlled passively anti - rolling tank is mainly investigated, and test about the controlled passively anti - rolling tank is researched

    本論文是基於學校「 211 」重點建設項目「船舶減搖水艙試驗裝置」進行的,主要研究可控被動式減搖水艙控制方法和對可控被動式減搖水艙進行搖擺臺模型試驗。
分享友人