lane closed 中文意思是什麼

lane closed 解釋
車道封閉
  • lane : n 萊恩〈姓氏,男子名〉。n 1 小路,小巷。2 (行列間的)通路。3 航道;空中走廊;規定的單向行車道。4...
  • closed : adj. 1. 關閉著的,封閉著的;密閉著的;保密的。2. 〈美國〉準備好了的;定了契約的。3. 【語音】閉音節的。
  1. One lane is closed while they 're paving the road.

    他們封鎖了一條車道在鋪路。
  2. At about 4 am, the first lane and second lane of lantau link before the toll plaza were closed for roadwork. a private car driven by a 42 - year - old man was travelling along lantau link towards the airport and reportedly rammed the rear part of a truck parking on the first lane before the toll plaza to direct traffic

    早上約四時,青嶼干線近收費亭前的第一及第二行車線正進行重鋪路面工程,一輛由一名四十二歲男子駕駛的私家車沿青嶼干線行駛,該輛私家車到達收費亭前據報撞向一輛停泊在第一線指揮交通的工程車。
  3. The team carried out three drainage surveys and four closed - circuit tv surveys covering extensive areas. dye - tracing was used to track misconnections back to where they originated, and the epd also cracked down on illegal back - lane dishwashing at food stalls and restaurants

    負責的隊伍進行了三次廣泛的渠道調查和四次閉路電視調查,此外並應用色粉測試法追蹤誤駁污水管的源頭,以及打擊熟食檔和在後巷清洗碗碟的食肆。
  4. Postal vehicles with special postal marks which need to pass through a lane closed to traffic or to stop in no - parking sections of the road shall be verified and approved by the competent department concerned for passing or parking

    帶有郵政專用標志的郵政車輛需要通過禁行路線或者在禁止停車地段停車的,由有關主管部門核準通行、停車。
  5. Wing ming street and wing ming lane will be closed

    (一)永明街及永明裡將會封閉;
  6. Wing ming street and wing ming lane may be closed to traffic between 7 am and 7 pm

    (四)永明街及永明裡將于上午七時至晚上七時封閉;
  7. Wing ming street and wing ming lane will be closed to traffic between 7 am and 7 pm from october 13 and 14

    (四)永明街及永明裡將於十月十三及十四日期間上午七時至晚上七時封閉;
  8. Wing ming street and wing ming lane will be closed to traffic between 7 am and 7 pm on october 22, 23 and 24

    (二)永明街及永明裡將於十月二十二、二十三及二十四日上午七時至晚上七時封閉;
  9. Wing ming street and wing ming lane will be closed to traffic between 7 am and 7 pm on october 17, 22, 23 and 24

    (二)永明街及永明裡將於十月十七、二十二、二十三及二十四日上午七時至晚上七時封閉;
  10. The eastbound lane of aberdeen main road between yue fai road and aberdeen praya road will be closed to all vehicular traffic

    香港仔大道東行介乎漁暉道與香港仔海傍道的行車線將臨時封閉。
  11. Carnarvon road south of its junction with granville road, hau fook street, cameron lane, humphreys avenue, prat avenue, hart avenue, mody road ( between nathan road and chatham road south ), hanoi road, bristol avenue, minden row, minden avenue and blenhiem avenue will be closed

    加拿芬道以南與加連威老道交界、厚福街、金馬倫里、堪富利士道、寶勒巷、赫德道、 (介乎彌敦道與漆咸道之間的)么地道、河內道、碧仙桃路、緬甸臺、棉登徑及白蘭軒道將不準車輛行駛;
  12. Carnarvon road south of its junction with granville road, hau fook street, cameron lane, humphreys avenue, prat avenue, hart avenue, a section of mody road between nathan road and chatham road south, hanoi road, bristol avenue, minden row, minden avenue and blenhiem avenue will be closed to traffic ; - northbound chatham road south between salisbury road and granville road will be closed

    加拿分道南與加連威老道、厚福街、金馬倫里、堪富利士道、寶勒巷、赫德道、介乎彌敦道與漆咸道之間的么地道、河內道、碧仙桃路、緬甸臺、棉登徑及白蘭軒道之交界處將不準車輛行駛;
  13. The fast lane of aberdeen main road southbound between lok yeung street and wu pak street will be closed to all vehicular traffic

    封閉行車線香港仔大道南行介乎洛陽街與湖北街的快速行車線將臨時封閉。
  14. The slow lane of westbound che kung miu road between sha tin tau road and chui tin street will be closed

    (三)沙田頭路與翠田街的一段車公廟路西行慢線將會封閉;
  15. Cheung woo lane and bowrington road will be closed

    祥和里及寶靈頓道將會封閉。
  16. This dissertation is faced to the process of steel rolling to found network of manufacture material flow, basing on it founding guide line evaluation system of the cost of unit standard producing working procedure, guide line evaluation system of the quality cost of unit standard producing working procedure and guide line evaluation system of performance and efficiency ; and base on the cost data of all kinds of material flows, manufacture flow, flux data, manpower, energy consume, material consume, capital asserts occupied, fund occupied, and the production in working procedure, throughput of the materials in working procedures in the flow and countercurrent flow in the network of material flow of recorded in working procedure producing, using the “ whole closed down lane ” model to describe network of manufacture material flow of steel rolling, found the cost analyzing model system of the network faced to producing process. make the cost increasing of the producing by abnormity material flow in working procedure, and even the cost increasing of the producing procedure as the cost of the management behavior of working procedure fallen under cost evaluation guideline in responsible working procedure, so as to ration measure the factors fast correlated with management behavior by measuring the cost

    在企業管理信息化輔助工具所建立的數據平臺基礎上,建立了以基準物流圖模型為基礎的軋鋼生產主流程物流網路拓撲圖,根據圖論的理論求解最大流量和最小費用;計算每個生產節點的加工成本,分離質量成本,克服了單純財務數據進行成本核算所帶來的缺陷;建立了軋鋼生產主流程工序含鐵物料吞吐能力基準圖模型,並根據此模型建立了軋鋼生產主流程工序激勵物流協調性和匹配性、工序響應物流協調性和匹配性分析的過程能力指數計算方法;通過引入決策單元綜合投入與綜合產出效率最優原則的模型和基於投入不變、分析產出是否有效或基於產出不變、分析投入是否有效的模型,實現了對多個績效指標在不同績效值集合之間的相對比較,並可根據投入產出效率準則、或者投入(產出)有效性準則進行排序。
  17. The inner lane of westbound carriageway of hennessy road between jardine s bazaar and canal road east ; the inner lane of eastbound carriageway of hennessy road between percival street and 50 metres east of canal road east ; and the western traffic lane of percival street between hennessy road and lockhart road will be closed at 7 pm

    介乎渣甸街及堅拿道東的一段軒尼詩道西行內行車線、介乎波斯富街及堅拿道東行以東五十米的軒尼詩道東行內線、介乎軒尼詩道及駱克道一段的波斯富街西行將于晚上七時封閉。
  18. Forty at the new bridge, they have the center lane closed

    新橋路段的40號大道已關閉主幹道
  19. 2. right - hand lane closed ahead

    2 .前面右邊行車封閉
  20. 1. right - hand lane closed ahead

    1 .前面右邊行車封閉
分享友人