level control dam 中文意思是什麼

level control dam 解釋
液面控制堰, 水位控制堰
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖槽的回淤量,必須依靠控制上游來沙量、調整入水口門位置、加設防淤堤及提高庫水位等手段,而不能通過調整挖泥槽寬度、位置及數量等措施來達到目的。
  2. The research progressing as follows : ( l ) basic developmental character and engineering control effect of continuous macrostructure plane ( i and ii level ) of dam abutment has been systemically studied. and this kind of structural plane took important effect to appraise rock mass distortion and failure and stability

    論文研究進展主要有以下幾方面: ( 1 )系統研究了壩肩宏觀貫通性結構面(分類中的及級)發育的基本特徵以及它們的工程式控制制效應,闡明了該類貫通性結構面對壩肩巖體變形破壞及巖體穩定性評價起主導作用。
  3. ( 2 ) statistical character and engineering control effect of short and intermittent structural plane ( iiia and iiib level ) of dam abutment has been systemically studied. and this kind of structural plane took important effect to appraise whether latent discrete boundary of massif could be formed and rock mass quality

    ( 2 )系統研究了壩肩短小、斷續性結構面(分類中的_ a類和_ b )的統計特徵及其工程式控制制效應,闡明了此類結構面對能否構成壩肩巖體塊體的潛在分離邊界以及對巖體質量的評價起著重要作用。
  4. Taking into account of water level and temperature, horizontal displacement monitoring control index of typical monolith of huangtankou concrete gravity dam is determined by the improved method of probability, which can be used as a reference for dam safety monitoring

    綜合考慮水位溫度對壩體位移的影響,採用改進小概率法,擬定了黃壇口重力壩壩頂水平位移監控指標,為今後一定時段內大壩安全監控提供參考。
  5. Jahezi reservoir is located at the northwest arid area of china, the primary tasks of which are flood control land irrigation. it has been reinforced in 2003 so the discharge capacity and the safety of dam were increasing at large degree, which created the conditions to utilize the flood sufficiently by raising the limited water level

    夾河子水庫地處我國西北乾旱區,主要承擔防洪及灌溉任務, 2003年除險加固完成後,水庫的泄流能力及大壩安全都有很大程度的提高,為水庫抬高汛限水位,實現洪水資源化創造了條件。
  6. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  7. Mathematics statistic model of the main observation variables and horizontal displacement hybrid model of typical monolith of huangtankou concrete gravity dam are established. through model analysis and parameter inversion, taking into account of water level and temperature, deformation monitoring control index of typical monolith is determined by the improved method of probability. the primary contents are as follows : 1

    建立了黃壇口混凝土重力壩主要觀測量的數理統計模型和典型壩段水平位移混合模型等,通過對各數學模型的分析和參數反演,綜合考慮水位溫度採用改進小概率法擬定了典型壩段水平位移的監控指標,得到一些有益的結論,其主要內容如下: 1
分享友人