lever rule 中文意思是什麼

lever rule 解釋
杠桿定律
  • lever : n 利弗〈姓氏〉。n 1 桿,杠。 a ball lever 浮球桿。 a brake lever 閘桿。 a control lever 控制桿。 ...
  • rule : n 1 規則,規定;法則,定律;章程,規章;標準;(教會等的)教規,條例,教條;常例,慣例。2 統治,...
  1. Based on consider hereinbefore, this dissertation discusses several aspects on the problem of the sustainable and optimum exploitation of groundwater resources as follows : ( 1 ) reviewed entirely the origin and evolvement of the concept " sustainable development ", stated and commented the study status in queue on " sustainable development " around national and international range, thorough discussed the science connotation about the concept " sustainable development " ; ( 2 ) looked back and commented across - the aboard some furthest basic concept and proposition related to groundwater resources, put forward self opinions on a few existent mistake points of view and chaos understandings ; ( 3 ) expatiated entirely on the content and meaning of the theory of changeable groundwater resources system, contrast with the traditional methods of groundwater resources calculation and evaluation, combined example to show the application of this theory ; ( 4 ) thorough analyzed the difficult and complexity to forecast the groundwater resources, fully stated the traditional methods of groundwater resources forecasting, pointed out the characteristic and applying condition of these forecasting method, introduced the main ideas and methods of wavelet analysis developed recently, and the matlab software be known as the fifths era computer language, and its accessory wavelet analysis toolbox, applied these methods and tools to analyze the groundwater dynamic curve, adopted the b - j method and morte - carlo method, combined with the theory of changeable groundwater resources system, discussed the new view on the forecast of groundwater resources ; ( 5 ) synthetically analyzed the characteristics and limitations of the present all kind of groundwater manage model, combined mathematical programming mathematical statistics random process and the theory of variation system of groundwater resources on the unite optimum attempter of surface water and groundwater, emphasized how to make the model more nicety, more simple, more practicality ; ( 6 ) analyzed the inside condition and outside condition to assure the sustainable and optimum exploi tation of groundwater resources, the inside conditions are the follows : correct resources idea, scientific methods of resources calculation and evaluation, credible forecast methods of resources, exercisable measures of resources management, the outside conditions are the follows : the development idea of high layer, the transform of manage system, the matched policy and rule of law, the adjusted of economy lever, the improve of cultural diathesis, the boosting up of water - saving consciousness and detail measures, the control of population rising, the prevention and cure of water pollute, the renew and rebuild of ecology ; ( 7 ) scan the sustainable and optimum exploitation of groundwater resources from the high level of metagalaxy, earth system science, and philosophy ; lint out the more directions on groundwater resources

    基於以上考慮,論文主要從以下幾方面對地下水資源可持續開發問題進行了比較深入的探討:全面回顧了「可持續發展」概念的由來與演變,對國內外「可持續發展」的研究現狀進行了述評,並對「可持續發展」概念的科學內涵進行了深入探討;對涉及地下水資源的一些最基本的概念和命題進行了全面的回顧和評述,對目前仍然存在的一些錯誤觀點和混亂認識提出了自己的見解;全面闡述了地下水資源變值系統理論的內容和意義,並與傳統的地下水資源計算評價方法進行了對比分析,結合實例具體說明了方法的應用;深入分析了地下水資源預測預報工作的極端重要性和復雜性,對傳統的地下水資源動態預測方法進行了全面的評述,指出了各類預測預報方法的特點及適用條件,對最近二十多年剛發展起來的小波分析技術的主要思想和方法及其應用范圍,以及號稱第五代計算機語言的matlab軟體和附帶的小波分析工具箱進行了介紹,並應用於地下水動態過程線的分析,採用時間序列中的b ? j法,蒙特卡羅方法,與地下水資源變值系統理論相結合,探討了地下水動態資料分析和地下水資源預測預報的新思路;綜合分析了現今各類地下水管理模型的特點及缺陷,將數學規劃、數理統計、隨機過程等與地下水變值系統理論相結合進行地表水地下水或多水源的聯合優化調度,使模型更準確、更實用;對保證地下水資源可持續開發的內部條件和外部條件進行了分析,內部河海人學博卜學位論文前言、摘要、目錄條件主要是正確的資源觀,科學的資源計算與評價方法,可靠的資源預測預報技術,可操作的資源管理措施,外部條件主要是高層發展思路、管理體制的變革、配套的政策法規、經濟杠桿的調節、人文素質的提高、節水意識的增強及具體節水措施、人口增長的控制、水體污染的防治、生態的恢復和重建等;從宇宙科學、地球系統科學及哲學的高度審視地下水資源的可持續開發;指出了地下水資源可持續開發的進一步研究方向。
  2. The lever rule applies in two-phase regions of ternary (as well as binary) systems.

    杠桿規律(除了二元體系之外)還適用於三元體系的二相區。
  3. Long - term and efficient work safety mechanism must be established in high risky industries such as coal mine industry, in which the concept of scientific development must be insisted, economic rule must be obeyed, and economic lever must be brought into full play

    在以煤炭生產為代表的高風險行業中建立「長久」而又「有效」的安全生產機制,必須堅持科學發展觀,嚴格遵循經濟規律,充分發揮經濟杠桿作用。
  4. By using ncep / ncar reanalysis data of height and wind, the inter - monthly lpac map, the climate lapc map, inter - annual anomaly map and mean variance map of monthly wind field of 850 and 500hpa and monthly height field of 850, 500, 150, 30hpa are calculated in a globe - belt area, which situates between 30 s and 75 n, from december 1957 to december 1997, according them we analysis the rule of the season transfer and anomaly of nh mean circulation. the results show that the climate map of lapc can describe the seasonal transfer process of large scale circulation better. the advance process of summer circulation establish is form south to north at the middle and lower level of the troposphere, that is reflected primly in the inter - monthly wind and pressure map of lapc ; at lower lever of stratosphere, the establish process is simulate to that of troposphere, and reflect of process of that the south asia high toward plateau ; at middle stratosphere the summer circulation establish begins at middle and high latitude initially, and then transmits to low latitude gradually, while the seasonal variability in mid - stratosphere is stronger than it in troposphere and low - stratosphere

    利用ncep ncar再分析高度場和風場資料,計算了30 s 75 n球帶區域1957年12月至1997年12月逐月850 、 500hpa風場及850 、 500 、 150 、 30hpa高度場月際局地型相似系數圖、多年平均圖(即氣候lpac圖) 、年際異常圖及均方差圖,在此基礎上,分析了北半球平均環流季節轉換及其異常的規律。分析表明,氣候局地型相似系數圖較好地給出了大尺度環流季節轉換發生的過程:在對流層中、下部,風、壓場月際局地型相似系數圖清楚地反映了夏季型環流建立由南向北的推進過程;低平流層夏季型環流的建立與對流層接近,其中,南亞高壓上高原過程有明顯反映:中平流層,夏季型環流的建立明顯表現為從中、高緯度開始,逐步向低緯傳播的特徵,且變化較對流層和低平流層明顯。
  5. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  6. By adopting the layered architecture, two - lever state machine, message queue based publish / subscribe pattern and rules expressed in xml, by using technologies involved in activex, xml and distributed components, icall - aldp provides application developer with supports as rule - based flow process, asynchronism and concurrent message process, external system communication - oriented protocol - transform, and dynamic expand of components

    通過使用activex控制項的動態加載機制、連接外部系統的通信協議轉換機制和基於元數據的柔性機制,增強了平臺的可擴展性。在設計和實現中採用了activex 、 xml 、設計模式以及分散式構件等技術,實現了基於規則的流程處理、支持並發與異步的消息處理以及構件動態擴展的功能。
分享友人