lift bridge 中文意思是什麼

lift bridge 解釋
升降吊橋。

  • lift : vt 1 舉起,使升起,提起,抬起;提高;提升。2 使高尚;鼓舞。3 運送,搬運;空運 ( = airlift) 4 ...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Midge : it ' s brand new. revolutionary up - lift : no shoulder straps, no back straps, but it does everything a brassiere should do. works on the principle of the cantilevered bridge

    米姬:這是全新的。革命性的改良。沒有肩帶,也沒有背帶,但是所有胸罩的功能它都有。運用懸臂式橋梁的原理來支撐。
  2. The truck crane ( gantry crane, tower crane, mobile slewing crane, bridge crane, crawler crane ) can lift a weight of 15 tons

    這臺汽車起重機(龍門吊、塔式吊、懸臂汽車吊、橋式吊、履帶式起重機)能吊起15噸的重物。
  3. Especially, some new advanced techniques such as integral casting concrete, integral sliding formwork are firstly applied in this project in china. a new style bridge girder erection machine which can lift a piece of box girder weighting 300 tons once was designed and manufactured successfully

    特別是本工程首次採用的一次性整體澆灌混凝土工藝、整體滑動模板設計、以及300噸拆裝式架設機的研製成功,為今後同類產品的施工提供了一些新思路和寶貴的實踐經驗。
  4. This ship is a non - propelled fixed luffing 500t steel crane vessel. this vessel is mainly used to lift and hookup the concrete components, bridge blocks, mechanical electrical equipments for harbours, bays, quays and jetty

    建港304為非自航固定變幅式500噸鋼質起重船,主要用於中國南海沿海各港灣港口及內河碼頭和堤岸的混凝土構件橋梁機電設備等吊裝工程。
  5. There are many materials and members to be hoisted during construction of the suspension bridge, unfortunately, the out - spread overhead curved cable makes it impossible for hoisting the stiffening girder with normal cable - supported lift. in order to ensure the construction proceeded smoothly, a multifunctional overhead cableway system is developed, thus accommodating all the hoisting tasks for the superstructure ( stiffening girder )

    懸索橋施工中需要吊裝的材料和構件很多,豐都長江大橋懸索橋主纜採用空間外張式,使加勁梁的吊裝不能採用一般的纜載吊機形式,為使施工的順利進行,本橋施工中開發了多功能高架索道施工方案,以一副索道完成了多種工作,全面解決了上部結構(包括加勁梁)的多項吊裝作業。
  6. Have bore stage car, grab, fork - lift truck, self - propelled to bridge machine, booth shop machine, roller, bulldozer, land leveler, tong carries car of stage of build by laying bricks or stones of line of pump, hydraulic pressure, crane, complete station the construction such as appearance, ride meter, dynamo and detect professional equipment 850 ( set ), technology of average per capita equips twenty - five thousand eight hundred yuan

    擁有鉆孔臺車、挖掘機、裝載機、自行式架橋機、攤鋪機、壓路機、推土機、平地機、砼輸送泵、液壓襯砌臺車、吊車、全站儀、測震儀、發電機等施工及檢測專業設備850臺(套) ,人均技術裝備2 . 58萬元。
  7. 1. after a series of comprehensive testing and structure analysis to various bridges on the guangshe, huning, jinqin, shenshan, jingguang. ln our opinion, the key problems of the railroad bridge are as follows : ( 1 ) bridge construction is not well at the request of the railroad train speed - lift, primarily because of low dynamic property of the horizontal frame ; ( 2 ) the bad liability of the bridges structure, concrete beam ' s horizontal plank coupling form ; the low capacity of some of the bridges

    在對廣深、滬寧、京秦、沈山、京廣干線上不同橋梁結構進行的一系列綜合試驗的結果分析后認為,我國鐵路橋梁目前存在的主要問題為:橋梁結構不適應列車提速的要求,主要反映為結構橫向的動力性能較差;橋梁結構的耐久性問題;混凝土梁的橫隔板聯結方式;部分橋梁承載能力不足。
  8. We analyzed the design theory of dam of bridge crane and design technology of dam of bridge crane, and revised mathematical model and experience formula which are used in the process of the design of bridge crane dam. with the foundation of object - oriented program method, we adopt the graphical program tools and program the dam of bridge crane computer aided optimization design software. this software has friendly man - machine interface, can achieve optimal lift system with the fundamental arguments of bridge crane dam. and can output this optimal designed result to a text document which engineering staff can be referred to

    本課題通過對起重機小車設計理論構成和設計方法的分析,結合計算機輔助設計技術的基本設計理論和工程技術人員的實際生產經驗,對以往起重機小車設計過程中所使用的數學模型、經驗公式等進行了修正,以面向對象的程序設計方法為基礎,採用可視化編程工具visualc + + + 6 . 0編寫了起重機小車計算機輔助優化設計軟體系統。
分享友人