line congestion 中文意思是什麼

line congestion 解釋
線路擁塞
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  • congestion : n. 1. 【醫學】充血。2. (交通的)擁擠;(貨物的)充斥;(人口)過剩,稠密。
  1. In the proposed method, the controller takes the buffer length as congestion indication, takes sources quality and bandwidth utility as object function so as to learn on line. as the controller outputs, the coding rate for input traffic sources and the corresponding user percentage are used to adjust the cells " arrival rate to the multiplexer buffer. compared with the previous method where cells " arrival rate is tuned only by the encoding rate and the encoding rates for all input traffic sources are regulated in a body, the proposed method guarantee that the quality of cells are optimal while cell loss rate is minimized, which means quality of service is guaranteed

    在該方法中,擁塞控制器以緩沖區大小信元作為擁塞指示,以信源質量和帶寬利用率作為目標函數進行在線學習,控制器輸出包括信源編碼率及其對應的用戶數在全部用戶中所佔的百分比,即根據信源編碼率及對應的用戶百分數調整信源輸入流,從而克服了以往擁塞控制方法中僅僅調整編碼率帶來的對所有信源進行整體調整的缺陷,使控制系統在信元損失率最小情況下確保信源輸入流質量最高,從而有效地利用了網路帶寬。
  2. The government is committed to implementing the spur line project to relieve the congestion problem at lo wu

    政府承諾興建鐵路支線,以紓緩羅湖擠塞的問題。
  3. In addition, the government is committed to the spur line project to relieve the congestion problem at lo wu

    此外,政府承諾興建鐵路支線,以紓緩羅湖擠塞的問題。
  4. To minimize worsening of traffic congestion and taking environmental and visual concerns into consideration, most mrt system routes in metropolitan areas are underground. except for those stations and crossovers where wide ranging areas are involved, the tunnel boring machine is usually applied. conventional tunnel boring was first adopted in 1818 in london, but at that time was only used on a one - line circular tunnel basis

    為減少對交通之沖擊及環境之影響,一般于都會區大眾捷運系統之路線劃皆以地下化為主,而整條路線除大面積開挖之地下車站及轉轍段外,其餘皆以潛盾隧道工法作為設計之主要考量。
  5. The patronage forecast for the airport express line ( ael ) made in the new airport master plan ( the plan ) in 1991 was based on a number of assumptions, including competition from buses, ael s fare level, air passenger volume and composition, and congestion on north lantau expressway

    於一九九一年擬訂的新機場總綱計劃(計劃)中所預測的機場快線乘客量,是基於一系列的假設,包括來自巴士的競爭、機場快線的票價水平、飛機乘客量和組合,以及北大嶼山快速公路的擠塞情況。
  6. Mr blake noted the urgency attached to completing the spur line to relieve increasing congestion at lo wu, particularly during festival holidays

    詹伯樂指出有急切需要興建落馬洲支線,以解決羅湖過境的擠塞問題,這問題在假日尤為嚴重。
  7. The commissioning of the shenzhen bay and lok ma chau spur line boundary - crossing points in 2007 will help alleviate congestion at existing boundary - crossing points

    為紓緩現時各邊境管制站的擠迫情況,深圳灣管制站及落馬洲支線管制站,將於二零零七年啟用。
  8. In light of a fire broke out on 7. 1. 00 in a congestion relief works site at the north point station of mtr island line, ir dr hon raymond ho chung - tai raised a question on emergency plans for fires occurring in mtr premises

    鑒于在2000年1月7日在地鐵港島線北角站進行紓緩擠塞工程的地盤發生火警,何鍾泰議員就應付地鐵范圍內火警的緊急計劃提出質詢。
  9. Over the medium term, decisions have also been announced to construct the shenzhen - hong kong western corridor which would provide an additional boundary crossing point, and the spur line railway project which would greatly relieve the congestion problem at lo wu

    中期方面,政府亦已公布興建深圳西部走廊,以為兩地提供新的跨界通道;及落馬洲支線鐵路項目;大幅舒緩羅湖通道的擠塞情況。
  10. Given the current traffic congestion in the kowloon city district, whether the government will expedite the vetting and approval of the above projects, so as to enable the east kowloon line and the north island line to become operational before 2006

    鑒於九城區現時的交通已非常擠塞,政府會否加快審批上述計劃,令東九及港島北能早於二零零六年通車?
  11. If this congestion continues to worsen, it will affect seriously the operation of exchange square, hong kong island station airport express tung chung line, ifc, hotel developments, ferry piers and other commercial developments in the area

    假如擠塞情況持續惡化,將會嚴重妨礙交易廣場香港站機場快線東涌線國際金融中心酒店發展項目渡輪碼頭,以及區內其他商業發展項目的運作。
  12. The new line will help to relieve existing congestion on the nathan road corridor of the mass transit railway and it will also serve new developments on the west kowloon reclamation

    新鐵路有助紓緩地下鐵路彌敦道沿線現時的擠塞情況,並為西九龍填海區的新發展區域提供服務。
  13. Without additional rail lines congestion was forecast on some sections of the tung chung line, the tsuen wan line, across the harbour and across the boundary with shenzhen

    倘若沒有新增客運線,預料東涌線、荃灣線、過海及連接深圳的跨界鐵路均會局部出現擁擠情況。
  14. Finally, the paper analyzes transmission congestion to the line attain over a long period of time what degree should consider an extension or build a new line to eliminate congestion, from opportunity cost angle. the paper gives a presentation on the challenge that transmission network planning faces and its basic way of thinking in power market environment. the paper also proposed a methodology for transmission network planning based on reformative congestion sensitivity indices

    文章最後,從機會成本角度分析了長期阻塞線路的阻塞達到何種程度時該考慮擴建或新建線路用於消除阻塞,簡要介紹了電力市場環境下電網規劃面臨的挑戰及其基本思路,並提出了改進的基於阻塞靈敏度因子的電網規劃方法,發展和豐富了電力市場環境下電網的輸電阻塞管理研究。
  15. Before the power flow reaches line maximum transmission capability, there is no congestion and congestion cost

    由於線路潮流在達到線路容量上限之前,不存在阻塞,各交易成交量的變化不對阻塞承擔責任。
  16. Each class of traffic is prioritized, so the higher priority queues are first in line for borrowing resources during periods of link congestion or over subscription

    信息流量的每一類是被規定了優先等級,在鏈路擁擠或使用過度時,隊伍中優先權更高的排隊首先借用資源。
分享友人