line construction 中文意思是什麼

line construction 解釋
線路架設
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. After 15 minutes ' intensively discussion, they started to exhibit their results. the nine groups, adding culture construction group, drumbeating group started their aboil contend and pk match. first, the elected leaders steped onto the platform to declare their team name and catchwords, and devised themselves ' characteristic behave. this activity bubbled up the assembly room ' s atmosphere. then we let the leaders stand in a line and give them the last 2 minutes ' speak time to draw tickets. lastly, we decided to choose the winner using the method that every group votes two tickets. but for there were 3 winners at last, we handed out a few lollipops averagely to this 3 groups. their great ambition expressed in last prevail speech reminded us the experience and scene in summer camp

    首先是剛才大家公認選出的組長上臺代表自己的小組發言,宣布自己組的隊名和口號,並作出自己特色的表現,一輪下來,整個會場幾近沸騰,接下來我們讓每位組長上臺一字排開,並給他們每人最後的兩句話的表現機會,大家積極踴躍發言為自己的小組拉票,最後我們由每個小組頭兩票的方式決定最後的獲勝者,結果出人意料的出現了並列三組第一的局面,我們只得把我們為數不多的棒棒糖平均分給了三個小組,在他們的獲勝感言上他們又一次表達的自己的雄心壯志,我們在這里看到了我們曾經夏令營的經歷和場面。
  2. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  3. It is right apprehensible for higher system of a kind of performance another a kind of system of in lieu of process, and also apprehensible for right a production line for better system, return apprehensible for the ameliorative process that the system of the interpersonal bargain activity construction

    它既可理解為一種效益更高的制度對另一種制度的替代過程,也可理解為對一種更有效益制度的生產過程,還可理解為人與人之間交易活動的制度結構的改善過程。
  4. Where the building lot for a building and connected facilities in a hot spring area is subject to a restriction requiring the installation of a pedestrian footpath to be set back from the building line or the side of a roadway within the building lot, the city / county ( municipal ) government with due jurisdiction shall consider the particular situation of the hot spring area in setting the principles for review of the setback distance or exemption from setback in accordance with article 263, paragraph 2 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設施之建築基地,受應自建築線或基地內通路邊退縮設置人行步道之限制者,直轄市、縣(市)政府應考量溫泉區特殊情形,依建築技術規則建築設計施工編第二百六十三條第二項規定,就退縮距離或免予退縮,訂定認定原則審查。
  5. Since the dfac has set up during the 1960 ' s, the " 3 - line " construction period as a military industry enterprise, the administrative pattern in the planned economy marked the dfac ' s logistic management of raw material deeply and firmly

    由於東風汽車公司建於60年代「三線」建設時期的軍工企業,計劃經濟的管理模式在東風汽車公司原材料物流管理中烙下了深深的印記。
  6. Threaded zinc - coated ferrous strand - eye anchor rods and nuts for overhead line construction

    架空線結構用加螺紋鍍鋅鐵絞線孔眼緊固桿和螺母
  7. Standard for threaded zinc - coated ferrous strand - eye anchor rods and nuts for overhead line construction

    架空線結構用加螺紋鍍鋅鐵絞線孔眼緊固桿和螺母標準
  8. Shoulder live line extension links for overhead line construction

    架空線結構用帶肩線膨脹鏈
  9. Combined with the operation conditions and upgrading needs of a certain cc line, construction scheme of cc data mart and processing method of collected process control data are introduced

    摘要結合某連鑄線的現狀和改造要求,介紹連鑄數據集市的構建方案和過程式控制制記錄數據處理的方法。
  10. Application of fx - 4800p - type electronic calculator to overhead transmission line construction

    型計算器在架空輸電線路施工中的應用
  11. Zinc - coated steel bolts and nuts for overhead line construction

    架空線結構用鍍鋅鋼螺栓和螺母
  12. Standard for zinc - coated steel bolts and nuts for overhead line construction

    架空線結構用鍍鋅鋼螺栓和螺母標準
  13. Guide for inspection of overhead transmission line construction

    架空傳輸線結構檢查指南
  14. The contrastive study between three - line construction and west development

    三線建設與西部大開發
  15. Hunan huazhong electric power construction and development group co., ltd. ( hereinafter referred to as “ huazhong group ” ), with registered capital 58 million yuan, has a wide range of business scope including electric transmission line construction as its major business ; hot - galvanizing for electric facilities ; research and development of new materials with high technology ; information service and information network project construction

    湖南華中電力建設開發集團有限公司是一家以輸變電建設為龍頭,以電力器材熱鍍鋅加工製造、高新技術新材料研發生產以及信息服務和信息網路工程建設為依託的綜合性集團公司。
  16. Question 3 : what ' s the sequence of rail transit line construction

    地鐵建設時序是怎樣的?
  17. Insulator pins with lead threads for overhead line construction, galvanized ferrous bolt - type

    架空線路架設用鍍鋅鐵制螺栓型帶導向螺紋的絕緣子柱銷
  18. Application of heavy maintenance construction model in the new line construction

    大修施工模式在新線建設中的應用
  19. Zinc - coated ferrous lag screws for overhead line construction

    架空線架設用鍍鋅鐵方頭螺釘
  20. Zinc - coated ferrous insulator clevises for overhead line construction

    架空線建造用鍍鋅亞鐵u型鉤絕緣子
分享友人