linear plan 中文意思是什麼

linear plan 解釋
線性規劃
  • linear : adj. 1. 線的,直線的。2. 長度的。3. 【數學】一次的,線性的。4. 【動、植】線狀的;細長的。5. 由線條組成的,以線條為主的,強調線條的。
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. I have taken impotance to analyze the rallying point of famous product, concrete cost and capability of providing and guarantee in this artical, meanwhile, i have caculated the quantity of concrete needed for the year and got the regression equation with the historic data for drilling footage of eight years and the consuming quantity of oilwell cement by the method of linear regression, and it has very significance for the making of stock contract and the plan of concrete production, i have analyzed the physical distribution of oilwell cement by the transpotation flex and the advantage or disadvantage between direct distribution and distribution to store in this artical, and i have tried to find the balance point of the two distribution ways by the ecnomic analysis and pointd out the conception of economic semidiameter, and come to the conclusion of direct distribution, distribution to store, and subarea of distribution to store at last

    本文對油井水泥供應商在品牌號召力、水泥成本、供應保障能力等方面進行了詳盡分析,並對供應商進行了能力排序;用線性回歸方法從八年鉆井進尺與油井水泥消耗量的歷史數據推算了當年度油井水泥需求量,得出了回歸方程,這對于油井水泥采購合同的制訂、水泥供應商生產計劃的制訂具有相當重要的意義;從運輸彈性分析出發對油井水泥物流配送進行了研究,對直達配送、入庫配送的優缺點進行了詳細的分析,在經濟分析的基礎上力求找到兩種配送方式的均衡點,並提出了經濟半徑的概念,得出了直達配送、入庫配送、入庫分區距離等幾項結論。
  2. We propose using fuzzy linear programming to workout a production plan

    本文提出用模糊線性規劃方法編制煉油企業生產計劃。
  3. Article 19 the so - said “ also applicable ” in paragraph 2, article 11 of the act means that, for the new towns approved by the executive yuan before the act is enforced, the exemption of inhertance tax and gifts tax is also applicable to land transfer caused by inheritance or presentation between spouses or linear descents for the lands within the scope of sectional expropriation, within 5 years commencing from the date when the executive yuan approves or the plan of the special area determines the implementation of zone expropriation to return of the compensation lands

    第19條本條例第十一條第二項所定亦適用之,指本條例公布施行前經行政院核定開發之新市鎮,于經行政院核定應實施區段徵收或特定區計畫確定應實施區段徵收之日起,至實施區段徵收發還抵價地五年內,應實施區段徵收?圍內之土地,因繼承或配偶、直系血親間之贈與而移轉者,亦適用同條第一項之規定,免徵遺產稅或贈與稅。
  4. The basis of current architectural programming theory localized on the elements of linear science with mathematics represented by statistics and the thinking manner is based on the complex reductionist and old system theory from the point of singleness and linearity. the plan and scheme derive from such a theory will deviate the rules of architectural activities and the requirements which architectural design should conform to rationality

    目前建築策劃理論基礎局限於近代數學以統計學為代表的線性科學基礎上,思維方式是從單一的、線性的角度對復雜的建築作還原論和舊的系統論的思考,在此基礎上進行設計任務書的制定、策劃建築的未來即不符合建築活動的規律,也不符合建築策劃以「合理性」為判斷基準的要求。
  5. By use of the techniques of operational research, probability and statistics, and via the combination of qualitative analysis with qualitative analysis, an optinun design of production plan was worked out the model of linear programming has been formulated in this connection, the optimal combination scheme of the product structure and output was obtained via the use of computers, the sensitivity analysis was performed and the results were optimized as well the comprehensive production plan was then worked out simultaneously, the optimal economical lot size of production was extracted from the mode of complete - set products

    並應用運籌學、概率統計學等方法,通過定性分析與定量分析相結合,對企業生產計劃進行優化設計,為此,建立了線性規劃模型,通過計算機求得產品結構及產量的優化組合方案,並進行靈敏度分析,優化結果,從而制定出綜合生產計劃。同時提出主生產計劃優化方案,利用產品配套模型,求得最優經濟生產批量。
  6. The main problems are also discussed such as order arrangement, capacity, capacity requirement plan, dynamic capacity plan based on agreement synchronous linear produce and lead - time control

    討論了系統所需解決的幾個主要問題:訂單管理,生產能力和能力需求計劃,同步線形生產的能力需求計劃的演算法,提前期管理。
  7. Since shop plan is the key of shop producing, with the goal to optimize producing workshop plan, the paper discusses the capacity and capacity requirement plan and provides an agreement synchronous linear production algorithm

    由於車間計劃是車間生產的關鍵環節,本文首先以優化車間計劃制定為目標,研究了生產能力和能力需求計劃,給出了相約同步線形生產的能力需求計劃的演算法。
  8. In accordance with the relative theories concerning the linear model of the operations research, the paper puts forward the assumption ( tentative plan ) to optimize yangtze river ' s electrical coal transportation system in shanghai section. thus gif at the electrical plant and the total operation costs of shipping companies can be reduced to the lowest

    本文以運籌學線性模型的相關理論,提出了對上海電煤長江運輸系統航線設置配船進行優化的設想,以實現電廠到岸煤價和船公司航運總成本最低的需求。
  9. Process capability index ( pci ) is also an important method to measure and improve quality, which has play a key role in assuring quality evidence, lowering cost and raising customer satisfaction indexes ( csi ). this paper studies the applications of pci and control chart from the actual viewpoint, and discusses the applications of the probability a, ( 3 of type i, ii error of the control chart, the detecting power and pci based on x control chart. in addition we explore the relationship between qlf and pci, put forward the concepts of relative loss and loss extent, adopt the linear plan to optimize pci and decide the best loss extent of each process. an example is given

    )控制圖為例,討論了控制圖的兩類錯誤、檢出力與過程能力指數在實際中的應用;重要的是討論了質量損失與過程能力指數之間的關系,提出了相對質量損失、損失度等概念;研究了多道工序相對質量損失、損失度對總質量損失的影響,並從質量損失的角度出發,採用線性規劃的方法,優化多工序的過程能力指數,確定各道工序的最佳損失度,實證討論了這種關系,同時可以利用這種關系對供應商進行評價,給出了從全局的、動態的角度選擇供應商的方法,為上下游企業間的配合、監督及共同進步提供了理論基礎和實現途徑。
  10. The general mode of linear programming modeles of production plan established by medium and small enterprises

    中小型企業建立生產計劃優化線性規劃模型的通用模式
  11. Considering uncertainty of crude oils supplying, uncertainty of the capability and yield of equipments, uncertainty of the price of crude oils. the result is compared with the result found by pros vi. 5, verifying the advantage and realizability of fuzzy linear programming. the model can be used to workout a short - term, middle - term, long - term production plan, also it can be modified to optimize stratagem programming with more uncertainties

    建立了蘭州煉油廠的生產計劃模糊模型,該模型綜合考慮了原油供給的不確定性、生產裝置的生產負荷和收率分佈的不確定性、原油價格的不確定性,並進行了求解,求解結果和申迪公司圖形建模優化排產軟體模型結果作了對比,證明模糊優化方法編制煉油廠生產計劃的可實現性和優越性。
  12. It s not a linear process, as you probably noticed from the plan diagram in figure 1, but the approximate behavior is as follows

    它並不像您在圖1的計劃圖表中看到的那樣是一個線性的過程,而是大致做了以下一些事:
  13. For analyze the relations between all kinds of the factors and the level of compensation, we use linear algebra and the analyzing method of game theory to find the model of the affections. so we can find the key factors of the affections. give a company ' s data ; we can use linear programming and prg method to set up a system to decide the level of the company ' s compensation. so we can find out an math tic model to solve the problem on company ' s total labor cost plan and the employee ' s salary plan

    其次,針對目前我國網路服務企業在薪酬設計中遇到的問題,使用一元回歸分析法及博奕論的相關方法對影響薪酬制度構建的多種外部、內部因素進行量化分析,找出其中各類影響因素對于薪酬具體數額的線性關系,評價各種因素的具體影響方式和影響程度,找到影響企業薪酬設計的關鍵性因素並指出評價各種因素的數量化方法。
  14. Discussion on implementation and management of soil and water conservation plan of linear projects based on yu - huai railway construction

    從渝懷鐵路建設談線性工程水土保持方案的實施與管理
  15. Next we will use the linear regression and the module to forecast the throughput of the dalian port in the next five years. finally we put forward the strategic plan and the corresponding tactics for dalian port to become the regional shipping centers

    接著又運用線性回歸和二次曲線回歸模型,對今後五年大連港的貨物吞吐量、大連港及北方周邊主要港口集裝箱吞吐量進行了預測,在綜合分析預測結果的基礎上,提出了大連港建立區域國際航運中心的戰略發展目標,並制定了相應的發展對策。
分享友人