lining concrete 中文意思是什麼

lining concrete 解釋
襯里混凝土
  • lining : n. 1. (衣服等的)襯里,裡子;襯料。2. 〈古語〉內容。3. 裝襯里[襯套等]。4. 【機械工程】襯,襯套,套筒,襯墊;(汽機的)氣套。5. 【建築】隔板。
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  1. Preparation and application of high strength and high performance concrete of drilling shaft lining in special deep alluvium

    特厚沖積層鉆井井壁高強高性能混凝土配製研究及其應用
  2. Gunite concrete lining

    噴射混凝土襯砌
  3. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明隧道混凝土二次襯砌中的底界厚度、空洞、漏水、鋼筋網變形等質量問題,利用探地雷達技術,通過對檢測方法及工程檢測實驗的研究,進行隧道二次襯砌中雷達波形特徵參數及檢測結果評價,總結了隧道襯砌質量問題的雷達波形特徵,驗證檢測方法的精度和可靠性。
  4. Shotcrete - rock bolt support and concrete lining are important parts of timbering structures in modern tunnel construction, and there are also essentials for natm. the intensity difference of concrete is big because of the big randomicity at the aspects of material, metage of additive, mix round, ratio of water and lime, spray construct and water maintain

    由於噴射混凝土和二次襯砌在拌和料、外加速凝劑的稱量、拌勻以及水灰比的配比、在噴射作業及灑水養護上都存在著很大的隨機性,其強度的差異也較大。
  5. Study on prefab concrete lining technology for open trench subway tunnels

    地下鐵道明挖區間隧道結構預制技術的研究
  6. Optimization design of tailrace surge chamber concrete lining layers for dachaoshan hydropower station

    大朝山水電站尾水調壓室混凝土襯砌分層優化設計
  7. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。
  8. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程襯砌試驗段施工情況,著重從地基處理、墊層料鋪設、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  9. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基土含水量、凍深、凍脹量、凍脹剩餘量、地下水位和砌體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種襯砌型式的防凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲襯砌型式,即混凝土板下鋪設聚苯乙烯板和砂礫石換填層結構型式,加以優化設計,用於工程實踐。
  10. Study on plunge pool concrete lining stability for flood dischare of a high arch dam

    高拱壩泄水墊塘襯砌穩定性研究
  11. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護工字鋼拱應力、錨桿軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  12. Lightweight and refractory ceramsite concrete block for cement kiln lining

    水泥窯用陶粒輕質耐火混凝土砌塊
  13. A kind of knew non - damage inspect method called app tester measuring the intensity of spray concrete was discussed in detail. a kind of non - damage inspect method used ultrasonic instrument and concrete instrument measuring the intensity of concrete lining was discussed. these method was proved to be impersonal and reliable, convenient for operating, laborsaving and timesaving

    結合工程實踐,詳細闡述了一種新的噴混凝土強度無損檢測方法? ?氣壓射釘槍檢測噴混凝土強度,闡述了二次襯砌強度無損檢測方法? ? 「超聲?回彈」綜合法,驗證了該方法具有檢測結果客觀可靠、操作方便、省工省時等優點。
  14. Abstract : this paper uses the supersonics wave inspecting method for judging the damage degree of fire hazard tunnel lining, and puts forward the correlation of concrete supersonics wave speed with relative physics and mechanical properties through test, and gives evaluation and suggestion about conventional supersonics wave inspecting method used in fire hazard tunnel

    文摘:將超聲波檢測法應用於隧道火災后的初砌損傷評定,通過試驗研究給出了砼超聲波速與砼有關物理力學性能的關系,並對超聲波檢測常規方法在隧道襯砌火損后的應用給出了評價。
  15. It is difficult to analyze combined work of underground penstock due to the gap among steel lining, concrete lining and rock

    摘要埋藏式壓力鋼管設計中,鋼襯、混凝土襯圈和圍巖之間普遍存在著不連續的縫隙,致使設計計算時難以進行聯合受力分析。
  16. Considering the gap between steel lining and concrete lining as the imperfect contact, contact layer is proposed to simulate the gap in the combined work analysis

    針對這種不密實接觸問題,採用厚壁圓環組合環法,提出了在鋼襯和混凝土之間設置接觸層的鋼襯、混凝土襯圈和圍巖三者聯合受力分析方法。
  17. The assess to tunnel lining concrete thickness lack many statistic data, all the same adopt un - statistic means to assess, advise adopt the probability statistic expression after gain lots of practice data

    隧道二次襯砌混凝土的厚度評定由於缺乏大量的統計數據,仍然採用非概率統計方法判定,建議在取得大量的統計數據后,應採用概率統計方法表達。
  18. Longtan hydropower station left bank diversion tunnel excavation and lining concrete construction methods

    龍灘水電站左岸導流洞開挖和襯砌混凝土施工方法
  19. After pass through analyze a lot of fact checking data, tunnel lining concrete thickness require could express by probability statistic

    在經過對大量的檢測數據的分析后,隧道二次襯砌厚度的檢測要求可採用數理統計方法表達。
  20. Feasibility research of high - proportion - pozzlan - concrete used in lining concrete of tunnel

    大摻量粉煤灰混凝土應用於隧道襯砌可行性的研究
分享友人