load responsible control中文意思是什麼

load responsible control解釋
力調節

  • load: n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • responsible: adj. 1. 有責任的,應負責任的 (to sb. ; for a thing)。2. 能負責的,可靠的;懂道理的,明白是非的。3. 責任重的(地位等)。adv. -bly
  • control: n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...

※英文詞彙load responsible control在字典百科英英字典中的解釋。

  1. Also a refined - pulp quality predictive model, with specific energy, specific load as the model inputs, and beating degree, wet weight as the model outputs, is presented. simulation results show that the models can be acted as theoretical bases for the automatic control of high - consistence pulp refining process

    即,建立了以原漿流量、白水流量、盤磨機功率為輸入變量,比能量、比負荷、濃縮機漿位為輸出變量的動態模型,以及基於比能量、比負荷的成漿質量預報模型。
  2. Engine load simulated control system was consisted of two unattached parts of work resistance simulated control subsystem and electric bow wave dynamometer control subsystem. with the mathematic models of engine load simulation controller, which transferred the work resistance ' s change to engine load change immediately, the system can met the need of the simulation control system

    發動機負荷模擬加載控制系統包括彼此獨立的作業阻力模擬控制子系統和電渦流測功機控制子系統兩部分,應用發動機負荷模擬控制器數學模型,使作業阻力的變化及時轉換為發動機負荷的變化,能夠滿足模擬系統的控制要求。
  3. When cooling load is less than ice - melting ability, optimal control strategy is just ice priority, optimal control saves 24 - 45 % operating cost compared with chiller - priority. when cooling load is more than ice - melting ability but still less than ice - melting ability plus half of chiller cooling ability, optimal control is to keep chiller load to half of chiller cooling ability and tune ice - melting to meet load, optimal control consumes 13 - 20 % more power but saves 9. 2 - 11 % operating cost compared with chiller - priority. when cooling load is more than ice - melting ability plus half of chiller cooling ability, optimal control is just ice - priority again, optimal control is to keep ice - melting to maximum and tune chiller to meet load, optimal control consumes 0 - 13 % more power but saves 0 - 9. 2 % operating cost compared with chiller - priority

    在冷負荷大於融冰供冷最大功率時,又分兩種情況:總冷負荷小於融冰供冷最大功率加一半的單主機滿負荷時,優化控制是保持主機供冷負荷系數為0 . 5 ,通過調節融冰來改變冷負荷,此時與主機優先比較增加能耗13一20 % ,節約運行費達9 . 2一11 % ;在冷負荷大於融冰供冷最大功率加一半的單主機滿負荷時,優化控制就是融冰優先,通過蓄冰槽滿負荷運行,調節製冷主機來調節冷負荷,此時比主機優先控制僅增加能耗o一13 % ,但能節約運行費o一9 . 2 % 。
  4. Automatic load dispatching control system

    自動給電
  5. Alfc automatic load frequency control

    自動裝入頻率控制
分享友人