local excavation 中文意思是什麼

local excavation 解釋
局部開挖
  • local : adj 1 地方的,當地的,本地的。2 局部的。3 鄉土的,狹隘的,片面的。4 【郵政】本市的,本地的;【鐵...
  • excavation : n. 1. 開鑿;發掘;挖掘;挖土,剜通。2. 穴,洞;坑道,開鑿成的山路。3. 【考古】出土文物,發掘物。
  1. Excavation of tunnel will lead to local geotectonic stress release and redistribution around tunnel ; the appearance of new outlet boundary will lead to outlet seepage of subsurface water and the change of mountain seepage field

    隧洞開挖將引起局部地應力的釋放及洞周附近的地應力的重新分佈;隧洞開挖后新的出水邊界的出現將導致地下水的大量出滲及山體滲流場的改變。
  2. The principal conclusions include : ( a ) the composite system is composed of both active - bearing structural members and inactive - bearing ones, being of a character of combination of rigid retaining structures with flexible ones, so its working mechanism will be behaved as sharing loadings, waterproof and impermeability, loading transfer, local reinforcement and pre - reinforcement ; ( b ) the experimental results show that much more subsoil will participate in retaining action, soil stresses of internal slope will be shared uniformly and deflections caused by excavation will be reduced notably because of cooperation of nails and cement - soil mixing pile wall ; and ( c ) the internal forces of facing in vertical model will be a control factor of design and the cross section tensile strength of cement - soil wall will govern strength of the

    主要研究結論有: ( 1 )復合土釘支護的作用機理主要為臨時加固土體以保證局部穩定、有機聯系以共同承擔荷載、改善土體性質起到止水抗滲作用。 ( 2 )試驗結果表明:復合土釘支護能夠充分調動周圍土體共同作用,有效地控制基坑變形;復合土釘支護中止水帷幕的插入深度和強度對控制邊坡變形與失穩有較大作用;復合土釘支護效果明顯優於一般的土釘支護。 ( 3 )面層與邊坡土體共同變形,設計時可按外力作用下的彈性地基梁進行計算。
  3. Trying to understand the way of life of anping district during dutch occupation period. from the excavation result, thus letting the local residents and citizens further expand their knowledge of anping history

    藉著熱蘭遮城之挖掘考古,嘗試重新發覺荷據時期安平地區過去生活紋理,讓居民及市民更進一步了解安平的歷史。
  4. Because the location of landside is too close to the dam which presents risks to some extent, the treatment methodology involved in local excavation and local slide promotion for no. 2 landslide has been proposed

    鑒于滑坡距壩太近,有一定風險,據此提出對號滑坡分別作局部開挖和局部促滑的處理方案。
  5. Confirm the legality of excavation with the local issuing authorities of rock excavation permits and export licences and require the verification of such permits and licences by local notaries public ; and

    與簽發石料挖掘證及出口證的當地政府人員確認石料挖掘的合法性,並需得到當地公證人認證挖掘證及出口證的真實性;及
  6. We should pay attention to the excavation, publishing and research of books recording local villages and towns

    應該重視村鎮志的發掘、整理、出版和研究。
  7. The antiquities and monuments office of the home affairs bureau had, before the commencement of the project, formed a team consisting of local and mainland chinese archaeologists to conduct excavation work at tung wan tsai, ma wan. the site occupies an area of more than 1, 500 ( in line with other units, it is suggested to amend as " sq. m. " ). the team found antiquities of 6 archaeological periods, including the mid - neolithic age ( about 3000 bc ), the late neolithic age ( about 2000 bc ), the early bronze age ( about 1000 bc ), the han dynasty ( 206 bc - 220 ad ), the tang dynasty ( 618 - 917 ad ) and the qing dynasty ( 1644 - 1911 ad )

    由於馬灣將展開大型房地產發展,民政事務局古物古跡辦事處組織由本地及國內專業人士組成的考古隊,於一九九九年六月至十一月期間,在馬灣東灣仔進行搶救性發掘工作,總發掘面積超過1 , 500平方米,共發現六個時期的考古遺存,包括:新石器時代中期(約公元前三千年) 、新石器時代晚期(約公元前二千年) 、青銅器時代早期(約公元前一千年) 、漢代(公元前206 -公元220年) 、唐代(公元618 - 917年)及清代(公元1644 - 1911年) 。
分享友人