long column 中文意思是什麼

long column 解釋
高料柱
  • long : n 朗〈姓氏〉。vi 渴想,極想,渴望 (for 〈古語〉 after to do)。adj (longer longest )1 長,長的...
  • column : n 1 【建築】圓柱;圓柱狀物〈如煙柱〉。2 【軍事】縱隊 (opp line); 隊;(艦隊的)縱陣,縱列,艦列...
  1. A long stride measured the schoolroom, and presently beside miss temple, who herself had risen, stood the same black column which had frowned on me so ominously from the hearthrug of gateshead

    眨眼之間,在早已起立的坦普爾小姐身邊,便豎起了同一根黑色大柱,就是這根柱子曾在蓋茨黑德的壁爐地毯上不祥地對我皺過眉。
  2. The long shadows of broken column and vague pedestal leaned across the field of ruin.

    毀損斷裂的圓柱和殘缺不全的雕像墊座投下的長長陰影,鋪展在這片廢墟上。
  3. Add up a long column of figures.

    把一串縱行數字相加。
  4. The greater the peak strain of the core concrete is, the greater the stability factor of the medium long column will be

    核心混凝土的峰值應變越大,鋼管混凝土中長柱的穩定系數越大。
  5. There are 2 - 3 layers of long - column - shaped palisade tissue under the upper epidermis, and there are a great number of mechanical tissues which made up of vascular bundle sheath

    上表皮下方有2 - 3層長柱形的柵欄組織,在主脈大側脈外方具有由大量機械組織組成的束帽或束鞘。
  6. He scanned the long column, which mostly concerned bakers, bushel - men, cooks, compositors, drivers, and the like, finding two things only which arrested his eye. one was a cashier wanted in a wholesale furniture house, and the other a salesman for a whiskey house

    他掃了一眼那長長的廣告欄,大多數是關于招收麵包師改衣工廚師排字工車夫等等,只有兩則引起他的注意,一則是一家傢具批發行招聘一名出納員,另一則是一家威士忌公司招聘一名推銷員。
  7. With the development of our society, more and more long span and large column - grid frame is to be applied in house building, public building and factory building

    隨著社會的不斷進步,越來越多的住宅建築、公共建築、工業廠房中要求使用大跨度、大柱網結構體系。
  8. The vector magnetic potential of a system consisting a line electric current and an infinite long magnetic dielectric column is calculated with the method of separation of variables and method of images, it is pionted out that the vector magnetic potential of a system consisting a line electric current and a magnetic dielectric plane, an ideal paramagnetic column, a superconductor column, and a line electric current in homogeneous magnetic field can all be deduced from our calculation

    摘要用鏡象電流法和分離變量法計算了線電流與無限長磁介質圓柱系統的磁矢勢,指出線電流與無限大磁介質分界平面、線電流與超導體圓柱、均勻外磁場中有磁介質圓柱系統時的磁矢勢都可以由線電流與磁介質圓柱系統的磁矢勢的極限情形給出。
  9. The scheming of science channel or column is an overall plan and design to the structure, contents or the external patterns of the channel or column in a long period, while the scheming of science program is a continuous activity with the producing and broadcasting progress of the column

    科教頻道或科教欄目的策劃,是在相當長一個時期中對頻道或欄目的結構、內容與外在形態的總體規劃和設計,而科教節目策劃則是在欄目製作播出的過程中,隨著時間的延續而持續進行的一種策劃活動。
  10. Prestressed concrete slab - column structure has been widely used in long - span and multistory building. there are four commonly used analysis methods for slab - column structure, which are direct design method, equivalent frame method, plasticity method and finite element method

    預應力混凝土板柱結構在大開間的多層及高層建築中得到了廣泛的應用,其設計方法有直接設計法、等代框架法、塑性分析法和有限元法等多種方法。
  11. 4. traditional theories for restrained stress of mass concrete does not agree with the construction method of long block without longitudinal joints, but now more and more dams are being constructed this way. by numerical simulating, this paper studies the temperature in and thermal stress developing process of column concrete blocks with different lengths ( 20m, 40m, 60m, 80m, 120m )

    針對常規的混凝土應力計算方法不支持長澆築塊的通倉澆築方案,而通倉澆築方法卻在工程實際得到越來越多的應用(如二灘,最長澆築塊為60m ;溪洛渡,最長澆築塊為69m )的情況,通過數值模擬分析計算方法,在同等條件下計算了不同澆築塊長度( 20m 、 40m 、 60m 、 80m 、 120m )的溫度過程與應力發展過程。
  12. I stated in this column not too long ago, “ it would have been nice if our community also cares enough about other pressing issues that deserve our immediate attention such as, … mental health care ”

    加拿大地大物博,多元文化的社會是中國新移民立足他鄉的首選,但機遇往往是留給有預備的人。
  13. Enlarging concrete section, enveloping iron and strengthening with carbon fiber sheet are the widely - used methods to strengthen concrete column under axial compression, although these methods have their respective defects : wet - work in construction sit, long time for curing and deformation of appearance, the aging of pouring compounds and so on

    目前對軸心受壓混凝土構件而言,常用的加固方法有混凝土加大截面法、外包鋼加固法、碳纖維布加固法等。而這些方法各有其缺陷,如現場濕作業問題、養護及外觀問題、灌漿材料或粘接劑的老化問題等。
  14. The parameters are measured respectively during the experimental process, such as bearing capacity, deformation, strain and so on. it concludes that when the other conditions is equal, the limit bearing capacity of the concrete filled steel tube long column subjected to axial compress is reduced along with the long diameter ratio increased

    從試驗結果可以看出:鋼管混凝土軸心受壓長柱的穩定承載力,在其他條件相同時隨長細比的增大而逐漸降低;試件在最大承載力狀態下,鋼管表面的平均縱向應變已超過鋼管的屈服應變值,破壞呈現為非彈性失穩破壞。
  15. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設計與施工兩個方面,對預應力筋的選用、布置,錨固區的設計及構造處理,裂縫問題,側向約束對梁軸向預壓應力及柱中第三彎矩的影響,頂層大跨邊柱設計等幾個問題進行系統的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和預防措施,對此類工程設計和施工有一定的參考價值。
  16. The first column of the first result row is converted to a 4 - byte integer long

    第一個結果行的第一列轉換為4位元組的整數(長整型) 。
  17. At last, we can get the limit bearing capacity formula of concrete filled steel tube long column subjected to axial compress. on the basis of the theoretical analysis, twelve samples which have four kinds of long diameter ratio are studied experimentally

    在理論推導的基礎上,對四種長細比12個鋼管混凝土軸心受壓長柱進行了試驗研究,量測了鋼管混凝土軸心受壓長柱在試驗過程中各階段的承載力、應變、縱向變形系數等。
  18. This paper conducts a study of the influence of core concrete performance upon the stability factor of axially compressed medium long concrete - filled steel tube column on the basis of comparison of the axial compression test results of long column made up of common concrete filled steel tube and medium long column made up of lightweight aggregate concrete - filled steel tube, and in accordance with analysis of the constitutive relation curves between both the common and lightweight aggregate concrete

    摘要通過對鋼管普通混凝土長柱和鋼管輕集料混凝土中長柱的軸壓試驗結果的比較,結合對普通混凝土和輕集料混凝土的本構關系曲線的分析,研究了核心混凝土性能對鋼管混凝土軸壓中長柱穩定系數的影響。
  19. The paper detailed analyses the present strengthening methods according to the characteristics of power plant structures, and provides strengthening methods adapting to power plant structures according to the testing results of strengthening joints packed steel outside, and that of long column and short column, similarity, the difficulties calculating the column of boiler are analysed, and the solutions are provided

    本文以河南平頂山姚孟電廠1 #機組的檢測鑒定和加固為例,全面介紹電廠結構的檢測鑒定情況。針對電廠結構的特點,對現有加固方法做詳細分析,根據外包鋼加固節點和長、短柱的試驗結果,提出適用於電廠結構的加固方法。
  20. As for the limit bearing capacity formula of the concrete filled steel tube long column subjected to axial compress, we lead to the tangent modulus and the conception of metal material. the high strength core concrete is divided into two kinds of situations : single axial loading conditions and triaxial loading conditions

    在推導鋼管混凝土軸心受壓長柱臨界承載力公式時,論文利用材料的切線模量,分別推導了鋼材和混凝土的切線模量公式。對于混凝土的切線模量,本文分成單向受壓和三向受壓兩種情況考慮,並分別得出切線模量公式。
分享友人