loop tunnel 中文意思是什麼

loop tunnel 解釋
環形隧道
  • loop : n 1 (用線、帶等打成的)圈,環,匝,框,環孔,線圈;【醫學】(常 the loop)宮內避孕環。2 環狀物,...
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. Fixedness cable already tunnel inner yi safe loop broken circuit and action

    固定電纜既坑道內之安全迴路斷路而動作。
  2. Through tunnel model test, the action law of external water load on secondary lining with a grouting loop is obtained

    根據隧道模型試驗理論,通過室內模型試驗得出了有注漿堵水圈的隧道襯砌結構外水荷載的作用規律。
  3. We introduce the fabrication of all samples and anneal of fexcu ( 1 - x ) granular film in detail. the configuration of granule film is investigated by scanning tunneling microscope ( stm ). the matter phase is analyzed by x - ray diffraction ( xrd ). the hysteresis loop of co / al2o3 / feni magnetic tunnel junction is studied by vibrating sample magnetometer ( vsm ). we use microresistance test system ( mts ) to investigate the character of resistance, conductance, voltage and current

    用掃描電子顯微鏡( stm )觀察顆粒膜樣品的表面形貌;用x ?射線衍射儀( xrd )對顆粒膜樣品進行物相分析;用振動樣品磁強計( vsm )對co al _ 2o _ 3 feni隧道結的磁滯回線作了研究;用微電阻測試系統對樣品電阻、電導、電流、電壓相關特性進行詳細的研究。
  4. The water - proof and drainage system within the tunnel has adopted the comprehensive treatment project of the combined linings and setting the pvc pellicle in the middle, the connection of the longitudinal, loop pipes and the rubber - sealing belt

    洞內防排水採用復合式襯砌中間設聚氯乙烯薄膜結合縱向、環向盲管及橡膠止水帶的綜合治理方案。
  5. Based on the idea of the measured displacement can be divided into elastic and plastic parts, elastic parameters can back analyzed by the elastic displacement, which is the measured instant after blasting excavation. the strength parameter can be got by plastic deformation, which is the measured during the period of construction loop without blasting excavation. lastly, depending on fenner formula, a new and valid evaluating criterion for tunnel stability is presented and the effect of deformation modulus, cohesion, internal friction angle and overburden can be considered

    以解析理論為基礎提出一種實用而簡便的圓形洞室彈性反分析方法,且將其應用推廣到其它洞型、分步位移等不同情況;提出一種圍巖強度參數反演方法,並對其可靠性進行了初步研究; ( 4 )依據芬納公式提出了能夠考慮圍巖變形模量、強度參數、埋深等主要因素的、新的、有效的圍巖穩定性評判方法。
  6. The design of tunnel lining structure is related with the drainage and waterproofing system, lining structure shape, the permeability coefficient of grouting loop and so on, which should be carried out through special research and calculation. it is inappropriate by adopting present standard drawing briefly. ( 9 ) with the action of external

    本論文提出的以堵為主「控制排水」原則和考慮外水荷載作用的鐵路隧道襯砌結構設計等定性原則和定量方法,盡管是初步的、探討性的,但這些原則和方法本身對改進和完善我國現有鐵路隧道襯砌結構設計方法,提高我國隧道設計水平具有重要意義。
分享友人