  1. In accordance with the characteristics of multi - units and high - lift pump station and the application to the actual project, the main pumping house and the auxiliary pumping house are arranged in combination with the intake pond, and then the understructure is integrated with the main pump house ; with which the working space is fully used with convenient management and investment saving

    摘要結合工程應用,針對多機組、高揚程離心泵站的特點,將主副廠房及進水池結合布置,下部結構與主廠房形成整體結構,既便於維護管理,又節省投資、充分利用空間。
  2. " the metal in subject - cadmium is also monitored by the environmental protection bureau of guangdong province at the dongjiang main stream outside taiyuan pumping station where donjiang water is abstracted and the monitoring results are also available at wsd s websites - www. info. gov. hkwsd

    廣東省環保局亦在抽取東江水的太園抽水站外對東江干主流原水的鎘含量有嚴格監察,並將監察數據上載於水務署的網頁:
  3. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  4. The dcs applications in raw water intake, chlorination and chemical dosage, filtration station, output pumping house, power switching house and main control room are specially described in detail under different conditions of waterworks

    並根據水廠生產的工藝過程,著重介紹了集散控制系統在原水取水、加藥加氯、濾池、配電、出水泵房和水廠控制室中各種不同場合的應用情況。
  5. The proposed 800 mm diameter salt water main is a pumping main to deliver sea water from the existing kowloon south no. 2 salt water pumping station to the existing yau ma tei salt water service reservoir. this serves to provide flushing seawater supply to south kowloon areas including the west kowloon cultural district scheme area

    建議的直徑800毫米的鹹水管是泵水干管,作用是把海水由現有的九龍南二號海水抽水站輸送至現有的油麻地海水配水庫,從而為九龍南部地區,包括西九龍文娛藝術區的計劃區,提供沖廁用的鹹水。
  6. Plasma ignition technique for engine is a new pattern technique, at the present some developed countries have studied plasma ignition system. ukraine have firstly used this technique in marine gas turbine and pumping station of the gas turbine used for the long distance oil transportation main from siberia to europe which increases the reliability of retrofires and extend the concentration limit of retrofires

    目前,世界上幾個技術發達國家都開展了等離子點火系統的研究,尤其是獨聯體國家更是率先把等離子點火系統用於艦用燃氣輪機以及從西伯利亞到歐洲的遠距離輸油干線的燃氣輪機泵站上,使發動機的點火可靠性和點火的濃度極限得到了極大的提高。
  7. The construction of phase iii started in september 1935 and was completed in 1939, when the third cross - harbour pipeline had been laid. this phase included the laying of twin cross - harbour pipelines that connected kowloon and hong kong island, the building of the tunnel and pumping station, the heightening of the main dam from 115 ft. to 275 ft. and the construction of an auxiliary dam, named the pineapple pass dam

    第三期工程於1935年9月展開,至1939年第三條海底輸水管建成后才告完工,主要工程包括兩條連接九龍至香港的海底輸水管、連接水塘與供水網路的輸水隧道、抽水機、主壩由115尺加高至275尺,以及興建82尺高的菠蘿凹副壩。
  8. As an inlet structure, the forbay is an important part of the pumping station. the pressurized forbay, close in top structure, is a kind of particular forbay in which water is pressurized. based on the integral hydraulic model test of shanghai changqiao waterwork ' s water - transport pumping station, some research on the hydraulic characteristics of the pressurized forbay has been done in the paper. the main content is listed as follows : l. the hydraulic characteristics of the pressurized forbay in different water supply combination and different pump unit combination without divertion measure, and the reason of the poor flow state. 2. the hydraulic characteristics of the pressurized forbay with diversion pier, and the reason why the flow state can be improved. 3. the experimental research on the critical air suction condition of the pressurized forbay

    本文基於上海長橋自來水廠改造工程送水泵站整體水力模型試驗,對有壓前池的水力特性進行了研究,研究的主要內容如下: 1 、無導流措施的有壓前池在不同供水組合及不同機組開機組合條件下的水力特性,並分析了流態較差的原因; 2 、加設導流墩後有壓前池的水力特性,以及加設導流墩流態改善的原因; 3 、有壓前池進氣臨界條件的試驗研究; 4 、水泵進氣以後水泵性能的討論。