main spot 中文意思是什麼

main spot 解釋
主黑子
  • main : adj 1 主要的,主,全,總。2 充分的,盡量的;全力的,有力的。n 1 體力,氣力;力〈僅用於 with might...
  • spot : SPOT =satellite positioning and tracking 人造衛星定位及跟蹤。n 1 斑點;污點;疵點,缺點。2 地點...
  1. This paper describing for acid fog how to do harm 2030 cm01 acidwashing technological process sector, principle of electrostatic removing acid fog, removing course, spot application, technological process, and so on, then demonstrating acid fog density before removing and after in the main spot by chart

    詳盡敘述了酸霧對該廠2030cm01酸洗工藝段的危害及靜電凈化酸霧的原理、凈化過程、現場使用、工藝流程等,並將治理前後主要部位的酸霧濃度列表說明。
  2. So the circumjacent welding should be applied at this spot and another join symmetrical to it, all sides of the place at which angle iron join are welded around with the main beam

    因此應該在該位置以及與之對稱的另一聯接點處都應採用周邊焊,使角鋼連接處的各邊全部焊接,然後再與大樑周邊焊接。
  3. That the system twist hempen thread draw up the quantification in the design follows the example of checing the target is followd the example of checing that by the twist hempen thread being living ; the faggot payment setup design stressly is puting into practice faggot some system pay, and has been underway the regulation to original pay composition. it is main through the base that the faggot spot manufactures the pay setup, quality, four bibliographic categories branch faggot some component such as post and twist hempen thread effect and so on

    在績效考核制度設計中制定了量化的績效考核指標;薪酬體系的設計重點是實行薪點制工資,對原有工資結構進行了調整,薪點制工資體系主要由基礎、素質、崗位和績效等四部分薪點組成,其中「績效薪點」是本設計方案的核心內容。
  4. In this paper, through practical investigation, spot visit and scientific analysis, the problem which exits in the enterprise ' s inside encouraging system is studied, and by inducing, the following problems are pointed out : first lacking scientific result examination system, unfair distribution system ; second disjointed distribution and personal work - effect, lacking enterprise loudening power, lass of use - full personnel, lacking power of bringing forth the new ideas. in this paper, according the practical situation and combining with the theory of encouraging system, the author analyzed the problem in this enterprise and thought that the main reasons

    本文作者結合所學的激勵相關理論知識,通過實際調查、現場訪問和科學分析的方法,研究該企業在激勵機制上存在的問題,經過認真分析、整理,認為該企業激勵機制上存在的主要問題是:首先在機制上缺乏科學的績效考核體系、分配製度不公;其次,在制度上分配與個人績效嚴重脫節;第三在管理方法上缺乏靈活性、企業缺乏凝聚力、人才流失,缺乏創新力。
  5. Main products : moving heads, scanners, follow spot light, laser lights, strobe lights, flash lights, effect lights, projectors, intelligent lights, disco lights, smaze machine, outdoor lights, search light, sky rose, city color light, fog machine, bubble machine, snow machine, flame machine, stage light, stage lighting, dimmer, dmx lighting controller, parcans, mirror ball, black lights, led lights and so on

    主要產品有:電腦搖頭燈、電腦掃描燈、電腦追光燈、激光燈、頻閃燈、圖案花燈、程序效果燈、戶外燈、煙霧機、泡泡機、雪花機、噴火機、舞臺燈、各種控制臺、專業led等。
  6. The main content of this thesis is about a simulation of tracking a spot and attacking a target with ir imaging guidance missiles, which includes the establishment the math modeling, the production of the dynamic images by programming, and the use of the broadcast memory sbs technique to accomplish the real - time transmitting of ir image and real - time synthesizing of ir image

    本文論述紅外成像制導導彈跟蹤並攻擊飛機目標的模擬全過程,建立數學模型,用編程的方法生成目標的動態紅外圖像,利用共享內存光纖網路完成圖像的實時傳送和實時合成。
  7. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  8. The commander of the combat group , on the spot , stopped the main body in a valley , 4 kilometers to the north of the enemy position and ordered the artillery commander to be ready to support the attack

    戰斗群的指揮官當即命令:主力部隊在北距敵軍陣地4公里的一個谷地停止前進,炮兵司令準備支援攻擊。
  9. In this paper, at the cut - in spot of beam active vibration control and use the pzt material as the drive component, the main research works can be summarized as follows : 1 ) using the finite element theory, a general finite element formulation of piezoelectric media is derived, the direct and converse piezoelectric effects are considered in the formulation

    本文從梁的振動主動控制研究為切入點,利用了pzt材料作為驅動元件,作了如下幾個方面的研究: 1 )利用有限元理論,考慮壓電材料的正、逆壓電效應的影響,導出了機電耦合壓電元件的有限元方程。
  10. This convergence will be reflected in some appreciation in what economists call the real effective exchange rate of the renminbi against other currencies. this will take the form of appreciation in the nominal exchange rate observed in the spot market, most notably the one against the us dollar, currently the main reserve currency of the world

    價格融合將會使經濟學家所指人民幣兌其他貨幣的實質有效匯率上升,這調整可以透過名義匯率,尤其是兌美元現時全球的主要儲備貨幣的匯價在現貨市場上升。
  11. This paper first conducts the research to the steel wire roller conveyer ball bearing rolling body and the steel wire roller conveyer spot contact question, gives the main geometry parameter of the zone of contact by the hertz contact theory, stress extreme value as well as contact body elasticity approach quantity formula, and acts according to the practical application to carry on the simplification, calculates the main parameter of the bearing zone

    本論文首先對鋼絲滾道球軸承滾動體與鋼絲滾道的點接觸問題進行研究,由hertz接觸理論給出接觸區的主要幾何參數,應力極值以及接觸體彈性趨近量的計算公式,並根據實際應用進行簡化,計算出課題所研究軸承接觸區的主要參數。
  12. Journalists at the main press centre in yokohama have been given the chance to try out the fevernova from the penalty spot, with the aim of hitting special targets in the goal

    正在橫濱各主要新聞中心執行采訪任務的記者們也有機會一試身手,他們可以在罰球點試踢"飛火流星" ,目標是踢中球網上的指定位置。
  13. The analysis of the main reasons that the department of the transportation, the locomotive, the circuit, the electricity and the carriage cause the accidents of delaying the train, put forward to the prevention measures. 6. with the safety turbulence situation of chengdu railroad branch, analyzing the safety managements in team management, the staff and workers labor discipline, the on - the - spot control, the staff and workers duty, the equipment quality and the construction safety, the deeply analyzing existing troubles of safety management institution, working out the counter measures of chengdu railroad branch to improve the safety managements and realize the controlling situation

    分析鐵路運輸、西南交通大學工程碩士研究生學位論文第頁機務、工務、電務、車輛等部門造成延誤列車事故的主要原因,提出預防措施; 6 、針對成都分局安全生產形勢動蕩不穩,分析成都分局安全生產中班組管理、職工「兩違」 、現場作業卡控、職工崗位責任制、行車設備質量以及施工安全方面的現狀,深刻剖析安全管理機制方面存在的問題,就實現成都分局安全生產有序可控進行對策研究。
  14. This paper summarizes the history and main symptoms of banana leaf spot disease caused by mycosphaerella spp. ; and also deals with the taxonomy status, biological properties, isolation, detection, and identification of the pathogen

    根據國內外近年來香蕉葉斑病的研究概況,對香蕉葉斑病的歷史、主要癥狀、病原菌的分類及生物學特性、病原菌的分離、監測和鑒定技術、病害的流行條件及防治方法進行了綜述。
  15. Aiming at the ecological environmental deterioration of bashang, from 2002years to3 ~ 5months of 2003 years. sand - transporting quantity of land cover types were on - the - spot moinitoring in gale seaon, comparing the productivity of the main crops. improving environment and developing economy are compositively considered for applying returning cultivated to woodland and grassland to supply the base of theory and technology. the main results as following : 1 observing the sand transporting quantity of artificial grassland, stubble land and cultivate land. indicates that when wind speed is higher ( 8. 0m / s ), the sand transporting quantity of artificial grassland of 200cm reduces 35. 5 % in average more than that of cultivate land, 34. 5 % sand - transporting quantity than that of stubble land. no distinct difference between stubble land and cultivate land. and when wind speed is lower ( = 5. 0m / s ), the sand - transporting quantity of coverage is no distinct difference according to the analysis of variance

    從改善環境和發展經濟兩方面綜合考慮,為實施壩上地區「一退雙還」提供了理論與技術依據。主要研究結果如下: 1對人工草地、作物留茬地及耕翻地的輸沙量觀測表明:勁風( 8 . 0m s )下,人工草地比對照耕翻地輸沙量在200cm高度內平均降低了35 . 5 ,比作物留茬地平均降低了34 . 5 ;作物留茬地輸沙量與耕翻地差異不顯著;微風( 5 . 0m s )下,不同地表覆被類型對輸沙量的影響差異不顯著。
  16. The results showed that grey relation entropy order of peanut yield and main traits was 100 - kernel weight, 100 - pod weight, pods per plant, no. of pod branches, length of subbranches, shelling percentage, no. of branches, plant height, leaf spot resistance, bad pods per plant, growing period

    結果表明,花生產量與農藝性狀的熵關聯度為:生育期0 . 9558 ,株高0 . 9859 ,分枝數0 . 9887 ,結果枝數0 . 9920 ,側枝長0 . 9888 ,單株果數0 . 9932 ,葉斑病病指0 . 9839 ,爛果數0 . 9858 ,百果重0 . 9933 ,百仁重0 . 9936 ,出仁率0 . 9887 ;熵關聯序為:百仁重百果重單株果數結果枝數側枝長出仁率分枝數株高葉斑病病指爛果數生育期。
  17. In boundary treatment, the model turns into generally adds coarseness boundary made of specially complex many coarseness body in the physical model experiment as the coarseness body highly and discharges the density to add the coarseness spot as the main characteristic whole, both to avoid the location within the body of this complex mathematical simulation problems, and could realize this model after to simulate the apron that adds the coarseness namely adds the coarseness section downriver speed of flow to the downriver current of water base speed of flow influence in to hang upward

    該模型在邊界處理時,將物理模型試驗中由特別復雜的多個加糙體組成的加糙邊界概化成以糙體高度為主要特徵的整個加糙部位,既避開了對加糙體內部進行極其復雜數學模擬的這一難題,又能實現模擬海漫加糙段下游水流流速在垂向上的分佈變化這一主要目的。在獲得基本的入流流速分佈、初始水位及加糙體的絕對高度和加糙段長度的情況下,能迅速模擬出加糙段下游各個斷面在垂向上的流速分佈情況。
  18. Today, gulangyu is listed as one of the nation s major scenic spot. the main sites of interest here include the sunlit rock, shuzhuang park, gangzihou bathing beach and memorial hall to zheng chenggong, which are visited annually by millions of people from all parts of the country and the world

    現在,鼓浪嶼被列為國家重點風景名勝區。主要旅遊景點有:日光巖、菽莊花園、港仔后海濱浴場、鄭成功紀念館等。每年有數以百萬計的中外遊人來此觀光游覽。
  19. The ancient grand national musical instruments factory lies in national - level scenic spot - - mo gan shandong department, the township located in the musical instrument of zhejiang - - county of deqing lip river give up town, it is speciality that produce national musical instrument main fact ' s enterprise

    古隆民族樂器廠位於國家級風景區- -莫干山東部,座落在浙江樂器之鄉? ?德清縣洛舍鎮,是專業生產民族樂器為主的企業。
  20. Where to kitesurf : cabarete has one main spot for kiteboarding : the officially designated cabarete kite beach

    上哪乘踏沖浪風箏:咔吧芮特是個沖浪風箏的主打玩點- - -官方指定的咔吧芮特風箏海灘
分享友人