main stress 中文意思是什麼

main stress 解釋
主應力
  • main : adj 1 主要的,主,全,總。2 充分的,盡量的;全力的,有力的。n 1 體力,氣力;力〈僅用於 with might...
  • stress : n 1 壓力,壓迫,緊迫,緊張。2 【語音】重音;重讀;【詩】揚音;語勢,著重點。3 重要(性),重點,...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. The main stress in ` photography ' falls on the antepenultimate syllable

    Photography一字的主重音在倒數第三個音節上
  3. Perfect pre - processing and post - processing function is one of the main factors to evaluate the vitality and market value of the finite element analysis system surveying today development of finite element analysis technology, most of which concentrate on establishing fine user interface, also has some limitation on application, and especially, the research on the visualization of arbitrary cut - plane is always in ascendants to realize the visual processing on cut - plane needs reprocessing the results of finite element analysis which have get, so the algorithm is two parts : seeking the physical value of cut - plane and drawing 2d contours, the former, based on the theory of stress on " arbitrary inclined plane " in physical mechanics, use the method of linear interpolation method to get the coordination and physical value of intersection between cut - plane and element arris ; the latter, based on the tables on elements, nodes, stress and strain, summarize a rapid algorithm of generating 2d contours based on the grid. this thesis synthesizes there two parts and get a visual processing program under fortran

    縱觀有限元分析技術的發展,目前大多集中在建立良好的用戶界面上的研究仍存在許多應用上的局限性,其中對任意剖面上可視化的研究仍處于方興未艾的階段。要實現任意剖面上可視化處理,必須先將得到的有限元計算結果進行再處理,因此在演算法上分為兩部分:求任意剖面上物理量值的演算法及二維等值線演算法。前一部分以彈性力學中「任意斜截面的應力」為理論基礎,利用線性插值方法得到截面與單元棱邊的交點坐標及交點物理量值;在此基礎上;根據已得到的單元及節點序號表、應力應變物理量表,總結出一種基於有限元剖分網格的快速生成二維等值線的演算法。
  4. The main contents are as follows. ( 1 ) filter cloth and the surrounding soil mass are taken as an approximate isotropy in horizontal section, the relationship of stress and strain is studied, the anisotropy is fully considered, the constitutive model of filter cloth reinforcement fly - ash compound is obtained, it is tested with numerous indoor experiments. ( 2 ) the permeable coefficient is introduced into the constitutive relationship of soil mass with relevant seepage theory ( kozeny - carman experience formula ). the test of filter cloth depositing hi the condition of long term seepage flow is done hi the dissertation, the varying regular of permeable coefficient without pressure is presented

    本文首先對國內外的研究現狀作了回顧和總結,然後主要針對土工織物加筋粉煤灰復合體的本構關系和計算理論進行研究,主要內容有: ( 1 )將土工織物和周圍土體視為一種近似的彈性非線性橫觀各向同性體,研究它的應力應變關系,充分考慮它的各向異性,得到土工織物加筋粉煤灰復合體的本構模型,然後通過大量室內試驗進行分析驗證; ( 2 )引入有關滲流理論,即柯茲尼-卡爾曼( kozeny - carman )經驗公式,將滲透系數引進到土體本構關系中。
  5. The fault controlled the magmatism and metallization relevant to the contact zone, and deformed successively and produced cataclastic rocks and two sets of joints ; the second stage was from late cretaceous to eocene. the fault zone deformed right - laterally under ne - sw striking transtention, and new joints zone was produced at the end of the two main faults because of local stress concentration. the fault produced inchoative cataclastic rocks, and two sets of typical joints in plutons ; the third stage of deformation was relatively faint and only a little of microcracks was produced and infilled with vei ns in the deformed rocks, which was during the himalayan movement

    其後的繼承性活動在斷裂帶內形成碎裂程度最強達到碎裂巖的碎裂巖系列構造巖,變形帶兩側發育兩組典型的共軛剪節理;第二次在晚白堊世?始新世,斷裂在北東?南西向近水平擠壓作用下右行張扭性活動,斷裂帶兩主斷裂在斜列重疊的端部由於局部應力集中進一步擴展形成節理帶,而斷裂在巖體區也發育兩組典型的共軛剪節理,斷裂內形成初碎裂巖為主的構造巖;第三次是喜山期以西側抬升、東側下降的強烈升降為主的活動,在基巖中,主斷層兩側圍巖出現微破裂。
  6. The main adverse effect of high speed of operation is the additional stress on the outer race owing to centrifugal force.

    高運轉速度的主要不利後果是由於離心力在外圈上引起附加應力。
  7. The two specimens, which are designed as : main beam - pre - stress beam ? floor ? frame columniation assemble the space specimens. in order to checkout whether the code can be applied for the special structure systems, the structure of the specimens refer to the current gb50010 - 2002 concrete structure design code and gb50011 - 2001 seismic resistant code

    本文試件的各組成構件為:非預應力邊梁預應力梁板框架柱組合空間試件,各組成構件的構造參照了現行《 gb50010 - 2002混凝土結構設計規范》及《 gb50011 - 2001抗震規范》的有關規定,以檢驗規范及設計條例能否適用於該特殊結構形式。
  8. The results indicate the stress of copper interconnects generates in the metallization and the thermal stress caused by thermal mismatch during the damascene process is the main stress. the thermal stress distribution in copper interconnects has been simulated by the finite element analysis software with the different trench structures

    對測量結果的分析得出金屬薄膜的淀積是造成銅互連線中應力的主要原因,熱應力在銅互連線應力中占較大比例,熱處理后銅互連線中應力減小。
  9. ( 3 ) in main stress trace protraction, based on the character of main stress trace, propose an automatic method

    ( 3 )研究了一種簡便快速的主應力跡線自動化繪制方法。
  10. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  11. In addition, the main stress at the interface of the bottom flange and inclined web, which located at the interface with the diaphragm, is the largest. so, it should be taken more attention to them in design

    另外,橫隔梁與斜腹板及底板交界處的底板及斜腹板區域,其主應力數值最大,設計中應給予重視。
  12. Product description : this series product has entire auto - lubrication systems and the ordinary two big kinds supplies to select, this machine major parts cancels the needle, cam and the ball bearing all uses the high quality import components, also selects the high quality steel products quenching heat treatment to the main stress components, the essential components uses special phosphorus processing, the foreign dew components all adopts special - purpose seal - up device and drains the oil the measure, therefore, entire causes machine throughout to locate the lubrication is reliable, the revolution is steady, under the high speed low chirp condition works

    本系列產品具有全自動潤滑型及普通型兩大類以供選用,本機主要零件勾針,凸輪及滾珠均採用優質進口零件,對主要受力零件亦選用優質鋼材淬火熱處理,關鍵零件則採用專門磷化處理,對外露零件均採取專用密封裝置及排油措施,因此,使整機始終處于潤滑可靠,運轉平穩,高速低噪的條件下工作。
  13. The result show, most of the medium - strong earthquakes faults are dip - slip reversed, distribution of the main stress p axis is sector from west to east ; there are large difference between kuche and baicheng region in seismic activities, but the characteristic of cluster is same in the two region ; the distribution of medium - strong earthquakes is nw direction in baicheng region, it show, there can have a concealed fault ; small earthquake clusters ' activities can reflect the effect that local medium - strong earthquakes to the secondary small structure around it

    結果表明:南天山東段中強震震源斷錯以傾滑逆斷為主,主壓應力p軸由西到東呈扇形分佈;相距較近的庫車與拜城地區地震活動存在較大差異,但均存在明顯的成叢性分佈特點;拜城地區中強地震分佈呈北西向可能預示著該區存在隱伏斷裂,小震群活動則可能反映了局部中強震對周圍次級小構造的影響。
  14. 1. under the same kind of wall rock and the same condition, displacement of pipe liner is symmetry, for tunnel structure and suffered load are symmetry. as level terra stress is bigger, the maximum of displacement and the first main stress occur in tie - in of pipe liner structure, and its direction is radial and points in hole ; the direction of the third main stress is annular and its maximum occurs in top and bottom hole inner

    1 、同一類圍巖在同一種工況下,由於結構和荷載的對稱性,管片襯砌結構的位移也表現出對稱性,因水平向地應力較大,位移最大值、第一主應力的最大值發生在管片襯砌結構的接頭處,方向為徑向指向洞內;第三主應力的方向為環向,較大值發生在洞頂和洞底內側。
  15. 3. under different kinds of wall rock and the same condition, from ii iii v kinds of wall rock, and conditions of construction period and operation period, it gradually increases that the maximum of displacement and the first main stress third main stress of pipe liner structure

    3 、不同種類圍巖在相同的工況下,從、 、類圍巖看,不論是施工期還是運行期,管片襯砌結構的位移的最大值和第一主應力、第三主應力最大值都逐漸增大。
  16. 2. under the same kind of wall rock and different conditions, the maximum of displacement and the third main stress of pipe liner structure in construction period is bigger than these of operation period, and the maximum of the first main stress of pipe liner structure in construction period is smaller than these of operation period

    2 、同一類圍巖在不同工況下,施工期管片襯砌結構位移的最大值、第三主應力最大值比運行期要大,施工期的管片襯砌結構的第一主應力最大值比運行期要小。
  17. In dcs, configuration is used to accomplish the on - line calculation of main stress of the orifice of the drum ' s central downcomer. in mis, the client / server structure based on the database is adopted. the program in server pretreats the data from dcs and sends them to the database, while the programs in client accomplished the final treatment and displays the result

    在dcs側,通過組態的方法,在不增加新測點的前提下實現了汽包集中下降管管孔處主應力的在線計算;在mis側,採用基於數據庫的客戶機/服務器結構,服務器端程序對從dcs系統來的數據進行初步的處理並存儲在oracle數據庫中,客戶機端程序完成數據的最終處理及結果的顯示
  18. Study was made by means of information distribution method on the fuzzy recognition of the relationship between the greatest main stress in practically measured ground stresses and the surrounding rock properties. the calculation results show that this method is feasible and has good recognition effect

    用信息分配法進行了實測地應力中最大主應力與圍巖關系的模糊識別研究,計算結果表明該方法是可行的,具有良好的識別效果。
  19. The study sets up 3 - d definite element models in terms of the seismotectonics of danjiangkou reservoir area. the models use drucker - prager yielded criterion to stimulate material property, which consider the influences of average stress and the second main stress on material strength

    本文則根據丹江口庫區的地質構造建立了三維有限元模型,採用drucker - prager屈服準則模擬巖石特性,即考慮了靜水壓力對材料屈服強度的影響,又考慮了中間主應力的影響。
  20. The stress analysis and the fatigue life loss calculation of steam drum are carried out in this article. a simplification formula is proponed to calculate the main stress and is used in configuration of dcs. the rain - flow method is used to count the fatigue cycle, which can satisfy the need of on - line monitoring

    本文對其進行了應力分析和疲勞壽命損耗的計算,並提出主應力計算的簡化公式用於dcs組態,採用雨流法作為在線計算的疲勞計數方法,滿足了壽命損耗在線監測的要求。
分享友人