making cost control work 中文意思是什麼

making cost control work 解釋
計算成本控制工作
  • making : n 1 製作(物),製造(物),生產;一次製造量;發展[發達]過程;成功的原因[手段];組織;〈常 pl 〉...
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的工程造價,即在決策階段編寫詳細的可行性研究報告和編制投資估算;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴格控制工程變更和現場簽證,嚴格審核工程施工圖預算,工程造價的預算採用工程量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施工有關資料,制定嚴密的合同條款。
  2. After analyzing the drive factor to these risks, we can adopt the demand for defining enterprises rationally, carry on the correct assessment measure to the software system and system supplier through certain standard, to reduce the software risks of enterprises ; through trying attention and support, perfect business procedure of enterprise work, and perfect basic management of enterprise of leader, to make the change risk of the project reduce ; through taking and making effective implementation plan, strengthen control over project change, enhancement the control of cost and lead into project manage the measures, to reduce the project change risk that enterprises implement erp project ; through introducing management consulting, strengthens the project training and strengthens construct of the group, to reduce the human resources risk that enterprises implement erp project

    在經過對這些風險的驅動因素分析后,可以採取合理界定企業的需求,通過一定的標準對軟體系統以及系統供應商進行正確的評估措施,來降低企業的軟體風險;通過爭取領導的重視和支持、完善企業的業務流程工作、以及完善企業的基礎管理工作,使項目的變革風險降低;通過採取制定有效的實施計劃、加強對項目變更的管理、加強對實施成本的控制以及引入項目監理制度等措施,降低企業實施erp項目的項目變更風險;通過引入管理咨詢、加強項目培訓工作以及加強實施團隊的假設,降低企業實施erp項目的人力資源風險。
  3. So we must put more attention on measurable management work, it can control and predict software development process more effectively. it also can provide decision - making for balancing quality, cost and schedule in software projects

    因此在軟體項目管理中必須更重視「定量」的管理工作,這樣才有利於控制和預測軟體開發過程,並為軟體項目的質量、費用和進度的權衡發展提供保證和決策的依據。
分享友人