mark completed 中文意思是什麼

mark completed 解釋
標記完成
  • mark : n 馬克〈男子名,Marcus 的異體〉。n 【宗教】(基督教《聖經》中的篇名)《馬可福音》;《馬可福音》的...
  1. Dahlia : it is the mark of samael. don ' t let it be completed

    那是惡魔薩麥爾的印記.千萬不要讓它完成了
  2. 11 the completed nomination form ( in original ) must reach the registrar, social workers registration board at 11 / f heng shan centre, 145 queen ' s road east, wan chai, hong kong on or before 16 july 2007 ( post mark )

    已填妥的提名表格(正本)必須於二零零七年七月十六日(郵戳)前,抵達香港灣仔皇后大道東145號恆山中心11樓社會工作者注冊局注冊主任。
  3. Data capturing of 2. 6 million census questionnaires completed - data input of 2. 2 million short forms and 0. 4 million long forms using optical mark recognition ( omr ) has been completed

    260萬份普查問卷的數據輸入工作已經完成-運用光學標記識別技術輸入了220萬份短問卷和40萬份長問卷的資料。
  4. The new project will mark another important milestone for the norwegian lime producing industry and is scheduled to be completed before the end of 2007

    這個新工程將成為挪威的石灰生產工業中的另一座里程碑,將于
  5. Please mark your name, phone number and e - mail address at the back of the pay - in slip and mail / fax it to us together with this completed subscription agreement

    請于您的銀行存款單背頁寫上您的姓名、電話及電郵地址,連同填妥的訂閱合約郵寄或傳真給我們。
  6. Students who have sucessfully completed the pre - mba program at cist may be accepted into the master of business administration program in community economic development program in cape breton university. april 18, 2006 - 2006 winter semester final mark has been posted

    根據他們的實際情況,從專業英文,學習技巧,研究技能和專業知識等全方面提升學生的學術水平,應用水平及綜合能力的特別課程,旨在為其攻讀北美大學碩士專業課程打下堅實的基礎。
  7. Comprehensive utilization of animal individual mark, one - dimension code, two - dimension code and rfid electron mark, and combination of network and database with pig breeding and slaughter processing were performed to construct a tracing system suitable to chinese situation for monitoring and controlling the safe quality of pig and pork, then a system for identifying individual pig automatically was completed

    摘要綜合應用動物個體標識、二維條碼、 rfid射頻電子標識和一維條碼標簽技術,將網路技術和數據庫技術與傳統的養豬業和屠宰加工業結合,構建了一種適合中國國情的肉用豬和豬肉安全質量監控的可追溯系統。
  8. When the construction of the reservoir was completed in 1936, it was named the " jubilee reservoir " to mark the silver jubilee of king george v. the remains of " gin drinker s line ", a line of defensive positions consisting of dugouts and pillboxes connected by tunnels which formed part of hong kong s defences during world war ii, can be found around smuggler s ridge to the southeast of the reservoir

    第二次世界大戰期間,英軍在水塘東南部至?指徑山頭一帶設立了一條由戰壕及碉堡組成,並以隧道相連的防線,稱之為醉酒灣防線。該等遺跡,現時雖仍殘存,但由於日久失修,遊人切勿進內,免生危險。
  9. Npc ' s who you have completed a quest for will display a question mark on mouseover rather than an exclamation point

    當你完成任務后,當鼠標移過任務npc時,會顯示問號而不是感嘆號。
  10. Can be used to mark the automatically created activity as completed in other words, force a one - step rebase

    可以用於將自動創建的活動標記為已完成(換句話說,強制進行一步變基) 。
  11. If the approval mark is applied before final lesting is completed, describe method used to ensure that the approval mark is removed from any rejected products

    如果經核準的標志是使用於最終測試前,描述標簽可以從不合格品上移除的方法。
  12. Method, get set the value of the text attribute in this object, and mark the todo item as completed on a certain date time

    方法) ,獲取設置該對象中文本屬性的值,以及將該todo項標記為在某個日期時間完成。
  13. In 1995, the " 7 2 " challenge was first accomplished by korean heo young ho and to date, only 5 persons have completed the mission. china is yet to make her mark on this scoreboard

    從1995年韓國人heo young ho第一個完成7 2計劃,到目前為止的十年間,全世界僅有五人完成此項探險,中國仍未有人達成極限目標。
  14. Applicants should send the entrance application form completed filling in, the copies of the degree certificate and the mark sheet of university to the recruitment office of our institute

    將填好的入學申請表和學歷證明成績單等有關材料復印件寄到本院招生辦公室。
  15. Tsim sha tsui the clock tower was completed and came into operation in 1921 as a part of the kowloon - canton railway terminus. the terminus was moved to hung hom in 1975 and now only the clock tower remains to mark the site of the original railway terminus

    整座鐘樓於1921年落成及正式啟用,原為昔日九廣鐵路火車總站的一部分及至總站於1975年遷往紅?后,鐘樓被保存下來,並成為尖沙咀區的標志。
  16. Should be completed within 19 minutes ; bonus marks will be given if completed earlier 1 mark for 1 minute

    十九分鐘內完成每少一分鐘完成可在總分內額外加一分
  17. Should be completed within 19 minutes ; bonus marks will be given if completed earlier ( 1 mark for 1 minute )

    十九分鐘內完成(每少一分鐘完成可在總分內額外加一分)
  18. To mark where replication was last completed

    以標記最終完成復制的位置。
分享友人