marshalling plan 中文意思是什麼

marshalling plan 解釋
堆存安排計劃
  • marshalling : 集結整備
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. Studying of optimization of fixed usage plan for railway marshalling yard tracks

    鐵路編組場線路固定使用方案優選方法研究
  2. Discussing on the capacity - enlarging modification plan in xiangfan north marshalling station

    襄樊北編組站擴能改造方案探討
  3. Study on intelligent generating method of work plan in marshalling station based on multi - agent

    的編組站作業計劃智能化編制方法研究
  4. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁橋的鋼箱梁架設技術難題,重點闡述了施工方案,龍門吊、導梁設計,工藝要點等。
  5. A high - quality operative plan should focus on the important tasks, organize car flow into all kind of trains according to the demands of the marshalling plan, ensure that all departure trains leave station on time, schedule exactly the decomposing and marshalling of all trains and suitably arrange all trains to occupy the arrival and departure lines

    一個好的階段計劃應該反映出本階段的工作重點,並按照列車編組計劃的要求,把車流及時編成各種列車,保證本階段的所有出發列車都能正點發車,並能合理地安排列車解編順序以及利用到發線接發列車。
  6. Phase plan, which is the main part of the task in marshalling station has obvious shortcoming in its obtaining way by the means of traditional method

    階段計劃是編組站作業計劃的核心部分,傳統手工編制方法的弊端日趨明顯。
  7. According to the fact of our marshalling stations, taking advantage of the system engineering, the paper details on the system of compiling phase plan and probes the adss ' s structure, funtion and achievement. and discusses some technology problems

    本文從我國編組站的實際出發,利用系統工程的思想,對階段計劃編制系統進行詳細的分析,對階段計劃計算機輔助決策系統的結構、功能和實現過程進行了初步探討。對其中的一些技術問題進行了研究。
  8. Thus, the paper introduces all the essential facilities, the procedure of all operations, such as marshalling, decomposing, fetching and delivering train, of the stations and coordinate work of all department, so that the working of automatically making stage plan with computer is well grounded on

    本文首先介紹了區段站必需的設備,及各種作業過程和全站的協調作業,為研究階段計劃的計算機自動編制打下基礎。應用計算機系統實現階段計劃的自動編制,在理論和實際應用上都很有意義。
分享友人