marshalling yard 中文意思是什麼
marshalling yard
解釋
編排場- marshalling : 集結整備
- yard : n 1 圍場,院子;(學校的)運動場。2 場地;工場,廠,製造場,工作場,停留處,堆置場。3 【鐵路】(...
-
Code for design on hump and marshalling yard of railway
鐵路駝峰及調車場設計規范 -
Railway fixed equipment. electronic treadle for marshalling yard. characteristics
鐵路固定設備.車輛調度編組場用的電子腳踏板:特性 -
Organization of train flows during modification of marshalling yard in ankang east station
安康東站調車場技改期間的車流組織 -
Application of tw - 2 hump automation system in zhuzhoubei marshalling yard
2駝峰自動化系統在株洲北編組站改造中的應用 -
Anti - running device is important equipment in marshalling - yard
車輛防溜器是編組場尾部的關鍵設備。 -
A simulation system for rolling freight cars at the rear of marshalling yard
編組場尾部車輛溜放模擬系統的研究 -
Abstract : anti - running device is important equipment in marshalling - yard
文摘:車輛防溜器是編組場尾部的關鍵設備。 -
Studying of optimization of fixed usage plan for railway marshalling yard tracks
鐵路編組場線路固定使用方案優選方法研究 -
Additional marshalling yard
輔助編組場 -
Exploration on the application of automatic hump control system at down marshalling yard of fengtaixi station
駝峰自動控制系統在豐臺西站下行編組場應用的探討 -
Computation of capacity at marshalling yard based on imbalanced transport circumstances
基於不均衡運輸的編組站能力計算方法探討 -
The reverse reception crossing analysis of the classification train in one - way marshalling yard
單向編組站改編列車反接進路交叉分析 -
Railway fixed equipment. marshalling yard. automatic points and rail brake control precision firing method. operating principles. characteristics
鐵路固定設備.調車場.道岔自動控制.用"射門"法自動控制剎車.作用原理.特性 -
Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology
文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁橋的鋼箱梁架設技術難題,重點闡述了施工方案,龍門吊、導梁設計,工藝要點等。 -
Calculated methods of carrying capacity for receiving and dispatching tracks at railway marshalling station 3 - stage 3 - yard
鐵路編組站到發線通過能力計算方法 -
Mathematical model of yard condition of railway marshalling station in coal mining area railway station
礦區鐵路集配站車場狀態研究 -
The marshalling yard at lo wu has a capacity for shunting and storing about 180 rail wagons before they are despatched to various locations
九廣貨運轄下位於紅?及火炭的貨場可容納及裝卸的集裝箱約相當於七百一十個標準集裝箱。
分享友人