mass erosion 中文意思是什麼

mass erosion 解釋
重力侵蝕
  • mass : n 彌撒;彌撒的儀式[禱告、音樂];彌撒曲。 a high [solemn] Mass (有燒香、奏樂等的)大彌撒。 a low ...
  • erosion : n. 1. 腐蝕,侵蝕(作用)。2. 【醫學】糜爛,齒質腐損。
  1. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  2. Thus, the piping - induced failure of two - layer foundation was verified as that : mass flow firstly appears in the upper weakly permeable layer, and then underground erosion and scouring gradually occur from downstream to upstream between the serviously and weakly permeable layers

    從而驗證了二元結構堤基的滲透破壞模式為:首先在上層弱透水層中發生流土,然後在強、弱透水層之間發生自下游向上游的逐步潛蝕沖刷。
  3. Standard test method for measuring mass per unit area of erosion control blankets

    測量沖刷地毯的單位面積質量損耗的標準試驗方法
  4. This paper gives detailed analysis and summary to the weathering and erosion process of rock slope, discovery the weathering velocity of rock slope is mainly controlled by such factors as lithology, structures, climate, structural characteristics of rock mass, the undulation and exposed area of rock surface, and man - made factor, furthermore, analysis the eroding mechanism of rock slope and its influencing factors

    摘要對巖石邊坡的風化和侵蝕過程作了較為詳細的分析和總結,發現巖石邊坡的風化速度主要受巖性及構造、氣候、巖體結構特性、巖面起伏及其裸露程度和人為因素的控制。
分享友人