measure pump 中文意思是什麼

measure pump 解釋
計量泵
  • measure : n 1 尺寸,尺度,量,分量;【數學】測度;度量法;計量單位。2 量具,量器。3 (衡量)標準,準繩;程...
  • pump : PUMP =politically upwardly mobile personality 政治新星,政治上有望晉升人士。n (淺口無帶的)輕舞...
  1. Then after analysising each characteristics of phosphate glass material, the fiber rod - in - tube by invaginating core rod, inside cladding and outside cladding is used to fabricate the er / yb phosphate glass fiber successfully by polishing and vacuumizing fiber rod - in - tube. finally some techniques, such as cladding pump, prism coupling pump and fusing pump are used to measure the gain of fiber amplifiers

    最後對拉制出的光纖提出了包層泵浦、棱鏡耦合泵浦和熔接耦合泵浦三種可行的增益和傳輸特性測試測方案,並針對鉺鐿共摻磷酸鹽玻璃光纖的特性,指出了熔接耦合是測試增益和傳輸特性的最佳方案。
  2. See your manhood grow as you create the thrilling vacuum by an easy manageable one - hand pressure pump. red see - through tube with measure scale. tube 22 cm long, inside diam. approx. 6. 5 cm

    這款真空增大泵會用一種非常簡單和可操控的方式讓你的陽具增大。它有紅色的可透視的外殼和尺寸刻度。全長22厘米,內徑6 . 5厘米。
  3. And at last the measurement of helical gear pump flow pulse has been presented, which include how to measure the flow pulse and the validating the theory mentioned before and to try to the solve the problems happened during the process

    根據齒輪泵流量脈動的檢測要求,採用新的測試方法和手段,建立了中高壓齒輪泵性能測試裝置,並對樣機進行了性能測試。
  4. Study of method about how to measure mineral pump lift

    礦用水泵揚程的測量方法研究
  5. To the inferior trap of rock - bottom building, ought to want special attention the following problem : ( 1 ) notice indoor moistureproof design, the ground outside basically observing indoor ground is compared wants tall how many, moistureproof measure how, judge thereby, the building fights damp ability, whether to live aptly ; ( 2 ) notice indoor facilities is designed, conduit of indoor fluctuation catchment is reasonable, observe whether conduit distribution is equitable, expedite, jam not easily ; ( 3 ) notice the establishment outdoor is designed, whether is the system such as room of the raceway groove outside be like, cesspool, water pump, catchment designed reasonable, accessary establishment leaves living room whether too close, this basically is to prevent to be all round the building generation seeper, especially after big rainstorm, be like catchment not free, the excessive outside possible sewage, by water adj / lit wide

    對于底層房屋的劣質陷阱,應當要非凡注重以下問題: ( 1 )注重室內地面防潮設計,主要觀察室內地面比外地面要高多少,防潮措施如何,從而判定,房屋抗潮濕的能力,是否適宜居住; ( 2 )注重室內設施設計,室內上下排水管道是否合理,觀察管道布局是否合理,是否暢通,不易堵塞; ( 3 )注重室外設施設計,如外溝道、化糞池、水泵房、排水等系統是否設計合理,附屬設施離居住房是否太近,這主要是為了防止在房屋四周產生積水,非凡是大暴雨後,如排水不暢,有可能臟水外溢,被水淹。
  6. This article introduces the cause and analyses the accident of the rotor, holding in death of the boiler feedwater pump, summing - up the way and technique measure in the process of repairing

    摘要介紹了大型氨廠鍋爐給水泵轉子抱死事故的原因,對其進行分析,並對修復過程中採取的方法及技術措施進行了總結。
  7. A test - bed of dg45 - 80 10 hypo - pressure feed water pump is designed, based on which the general on - line performance testing system is developed and the thermodynamic method is introduced to measure the efficiency of the pump. a new programming technology combining vc + + with matlab is presented by which the vibration monitoring system of boiler feed water pump is developed successfully to perform data analysis after on - line acquisition

    本文首先進行了次高壓鍋爐給水泵dg45 80 10實驗臺的設計,在此實驗臺設計成功並安裝調試通過的基礎上,開發了鍋爐給水泵通用性能試驗系統,包括測點的布置、各型測量儀器的選購,設計,安裝和調試以及軟體平臺開發。
  8. According to the tendency of modern concrete pump deliever with far - distance and high - floor pouring, the market need a measure system provided with good automatic performance and friendly human - machine interface

    現代混凝土泵送技術向遠距離傳輸、高層澆注發展,並日益走向市場化,對測量系統的要求越來越高,不但要求它具備較高的自動化程度及良好的測量性能,還要求友善的人機交互界面。
  9. On the design of the system, the thickness measure system of mems chip is built based on lbu and pump - probe technology. on the analysis of data, the reflectivity curve is analyzed using the law of reflectivity change induced by ultrasound, and the thickness is calculated using the system designed by the article, to aluminum film the size of about 20nm can be measured, when the film be measured is single layer, the relative error of the system is less than 2 %, when the film be measured is double layer, the relative error of the system is less than 10 %

    在基礎理論方面研究了激光(特別是超短脈沖激光)超聲的激勵機理,探討了激光調制技術以提高系統信噪比,闡述了泵束探針束技術及相關實驗設置;在系統設計上,以激光超聲為基本原理,以泵束探針束技術為系統設計方案完成了mems基片厚度測量系統的設計;在數據分析方法上,利用聲致光反射率變化的一般規律對測得的光反射率曲線進行分析,確定超聲回波在薄膜兩界面間來回傳播的時間,以計算薄膜的厚度。
  10. The method was applied to measure the hydraulic losses of inlet and outlet conduit of bulb tubular pump system of the pumping station respectively

    採用本文的方法對某泵站前置燈泡和後置燈泡貫流泵的進、出水流道分別進行了模型試驗,測試了流道水力損失。
  11. The heat pump evaporation had become a feasible measure of energy conservation. however, the variational work situation influenced both the ejector ' s efficiency and the evaporation capability, even the normal production

    蒸汽噴射式熱泵蒸發為蒸發行業簡單易行的節能措施,但工況的變化會影響噴射器的效率,降低蒸發能力,甚至影響蒸發操作的正常進行。
  12. As an inlet structure, the forbay is an important part of the pumping station. the pressurized forbay, close in top structure, is a kind of particular forbay in which water is pressurized. based on the integral hydraulic model test of shanghai changqiao waterwork ' s water - transport pumping station, some research on the hydraulic characteristics of the pressurized forbay has been done in the paper. the main content is listed as follows : l. the hydraulic characteristics of the pressurized forbay in different water supply combination and different pump unit combination without divertion measure, and the reason of the poor flow state. 2. the hydraulic characteristics of the pressurized forbay with diversion pier, and the reason why the flow state can be improved. 3. the experimental research on the critical air suction condition of the pressurized forbay

    本文基於上海長橋自來水廠改造工程送水泵站整體水力模型試驗,對有壓前池的水力特性進行了研究,研究的主要內容如下: 1 、無導流措施的有壓前池在不同供水組合及不同機組開機組合條件下的水力特性,並分析了流態較差的原因; 2 、加設導流墩後有壓前池的水力特性,以及加設導流墩流態改善的原因; 3 、有壓前池進氣臨界條件的試驗研究; 4 、水泵進氣以後水泵性能的討論。
  13. The improving measure of lpg canned motor pump and its control system

    液化氣屏蔽泵控制改進與完善
  14. In this paper, a pump auto piping concrete made by some company is used as an object of study, and tbs - 2000 strain measuring system is used to measure the pump in the way of dynamic stress, statistic stress and proper frequency

    本論文以某公司生產的水泥混凝土泵車為研究對象,採用tbs ? 2000應變測試系統對該泵車進行了動、靜態應力測試及固有頻率測試。
  15. Based on the comparative analysis of two available heat system plan, the paper selects the water - water heat pump system plan. after a series of character analysis, design calculation ; the style of compressor including media choosing and its circle dynamic calculation for the thermodynamic system is determined. besides this, based on some basic measure of thermodynamic analysis, the heat pump coefficient of performance is discussed ; the exergy analysis for the water - water heat plan is conducted ; the calculation formula of heat pump exergy efficiency is derived ; an optimal model for heat pump together with thermal machine is established and the main exchanger equipment in heat pump system including its resistance calculation is designed in details

    本文通過對兩種系統方案進行比較分析,確定了水環熱泵系統的基本方案,經過定性分析和設計計算,進行了壓縮機的選型、工質的選擇、熱力系統的循環計算等基本設計,同時應用熱力學分析的一些基本方法,討論了如何評價熱泵系統的性能系數,並對電廠循環水余熱回收熱泵系統進行了(火用)分析,得到了熱泵過程(火用)效率的計算公式,建立了熱泵?熱機聯合機組優化模型,還對熱泵系統的主要換熱設備進行了詳細的結構設計和阻力計算,最後對熱泵系統進行了技術經濟分析和評價。
  16. The paper introduces some measure and calculation methods of slurry pump capacity, and focuses on how to analyze, measure and deduce the capacity without enough instruments, putting forward the theoretical computing formula

    摘要介紹了渣漿泵現場流量的測量和計算方法,重點闡述了在沒有足夠儀器、儀表的情況下如何分析、測量並推導出渣漿泵的實際流量值,並從理論上給出了計算公式。
  17. The measure and progress to improve the cavitation performance of centrifugal pump

    提高離心泵抗汽蝕性能的措施
  18. The sediment problems of this project in design is that the deposition of sediment causing the permanent loss of reservoir capacity. the measure of enlarging the discharging of water and sediment can reduce deposition, but the concentration of sediment is bigger and much sediment passes through the pump - turbines

    減少水庫庫容淤積損失,加大排沙量,會造成在發生洪水時期水庫內含沙量加大,抽水時會有更多的泥沙過機,機組因泥沙而磨損。
  19. Crack control measure in pre - mixed pump - carrying concrete construction

    預拌泵送混凝土施工中裂縫控制措施
分享友人