middle wall 中文意思是什麼

middle wall 解釋
中墻
  • middle : n 1 中央,正中;中間,中部;中途。2 人體的中部,腰部。3 中間物,媒介物;中人,中間人,調解人;中...
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. Why do you think the wall between the master bedroom & the middle room is a core wall

    個單位好似有問題,點解?地會拆了主人房同中間個房個主力墻呢
  2. The anther possesses four microsparangia with its wall composed of four layers : epidermis, endothecium, middle layers and a 2 - nucleate celled tapetum. most of the antheral tapetum are in situ

    單穗升麻的花藥具4個小孢子囊藥室,囊壁花藥壁由表皮藥室內壁中層和絨氈層組成。
  3. 2 both the hanging wall and the footwail rock of ore bodies are garnet biotite schist, protoliths are alkaline volcanic rocks ( tracyh andesite ). according to characteristics of trace elements assemblages and the setting of tectonics, these alkaline volcanic rocks were derived from the lower degree melting of metasomatic and enriched mantle ( eml ) in the initial stage of middle proterozoic epoch. they strongly enriched in large ion lithophile elements ( lile ), such as ba

    2 、礦體頂、底板圍巖(石榴石黑雲母片巖、鈉長黑雲母片巖等)的原巖為堿性火山巖(粗面安山巖) ,相對富集大離子親石元素ba 、 cs 、 rb 、 k 、 lree及貧zr 、 sr 、 ti 、 hf 、 hree ,為早元古代末期-中元古代早期交代富集地幔低程度部分熔融所形成的堿性火山巖。
  4. Cell - wall polysaccharides and pectic substances contained in the vesicles eontribute to growth of the new wall and middle lamella inside the sac

    小泡中所含的細胞壁多糖和果膠狀物質對新細胞壁的生長和囊泡中間層的形成有重要的作用。
  5. Industry : it has five solely - owned enterprises of carbon, thermal power, light steel, pressure vessel and wall body material and six enterprises with participating shares of shandong dongyue chemical industry co., ltd, printing center of newspaper office in the middle part of shandong, sida electric, plough textile company, xinquan cast iron co., ltd, laiwu kaiyuan wanxi company

    工業:擁有炭素、熱電、輕鋼、壓力容器、墻體材料等5個獨資企業,山東東岳化工股份公司、魯中晨報印務中心、思達電氣、北斗星紡織公司、鑫泉鑄鐵有限公司、萊蕪開源萬鑫公司等6家參股企業。
  6. Pledgets imbibed with cocaine solution are then placed under direct visualization into the middle meatus, the inferior meatus, and along the nasal septum. xylocaine with epinephrine is then used to infiltrate the lateral nasal wall, the uncinate process, and the head and inferior portions of the middle turbinate

    將浸有的卡因的脫脂棉片直接置於中鼻道,下鼻道和中鼻甲表面,再使用利多卡因和腎上腺素浸潤鼻腔外側壁鉤突和中鼻甲。
  7. So a round wall of air pressed towards the middle of the base.

    於是一堵圓形的空氣墻就壓向船底的中部。
  8. Dongzigou ag deposit and jianbaoshan au deposit are hosted in the sandstone of middle - proterozoic suberathem, which are developed from the proterozoic sediment metal source - rocks formed during the meso - proterozoic volcanism and reworked by the mesozoic tectono - magmatism during the formation of the metamorphic core complexes in eastern hebei. the dongzigou ag deposit has the characteristics of reformed strata - bound origin, the jianbaoshan au deposit, located in the detachment fault, is the alterated rock type. both deposits have the similar wall - rock alteration, and show the same trace element behavior, and ree patterns. they are the results of the multi - stage tectono - magmatism in the environment of continental extension in eastern hebei region. their mineralization depended on their wall rocks and relative location in metamorphic core complexs

    賦存於中元古宙長城系常州溝組的洞子溝銀礦床和尖寶山金礦床是由密雲-都山變質核雜巖構造體系所控制的一組礦床。其成因為中元古宙火山巖漿活動形成的沉積礦源,后經中生代的變質核雜巖構造巖漿體系疊加改造而成。洞子溝銀礦床具有層控迭加改造的特點尖寶山金礦床則具有破碎蝕變巖型礦床的特點。
  9. Objective to report 16 cases of intracranial aneurysms with calcified vascular wall and study the relationship between vascular calcification and pathogenic mechanism of intracranial aneurysms. methods spiral ct scan, clinical data and serum calcium, phosphate, glucose, lipid, renal function of the 16 patients were studied in retrospect. all aneurysms were clipped, in which 8 were resected after clipping. results the location of aneurysms with aneurismal wall calcification was, on posterior communicating artery in 3, on middle cerebral artery in 2, on anterior communicating artery in 2, on basilar artery in 5 and on basilar artery in 4. all patients showed normal serum calcium, phosphate, glucose and normal renal function. serum lipid of patients had been elevated. all patients recovered with no significant neurological deficits. conclusion intracranial vascular calcification is an active and regulated process in close relation to atherosclerosis, serum calcium, phosphate, lipid, thyroid, parathyroid function and other factors. intracranial vascular calcification has close relationship with the pathogenesis and management of intracranial aneurysms

    目的報告16例瘤壁有鈣化的顱內動脈瘤病例的治療,分析顱內血管鈣化與顱內動脈瘤病理發生機制的關系.方法回顧性分析16例瘤壁有鈣化的顱內動脈瘤病例的影像學、臨床資料及手術治療.結果瘤壁有鈣化的顱內動脈瘤的位置是: 3例位於后交通動脈, 2例位於大腦中動脈, 2例位於前交通動脈, 5例位於椎動脈, 4例位於基底動脈.所有患者血鈣、磷酸鹽、血糖、腎功能正常. 6例患者血脂增高. 16例患者均行動脈瘤夾閉術,其中8例術中切除動脈瘤,治療效果良好.結論動脈瘤瘤壁鈣化與其病理發生機制有關,常見于巨大或大動脈瘤,瘤壁血管鈣化是與動脈粥樣硬化、血鈣、磷酸鹽、血脂、甲狀腺、甲狀旁腺等因素有關的主動耗能,多因素調控的病理過程
  10. “ mr clattenburg was the same referee when robin van persie scored and jumped the wall, went to the middle of the crowd and celebrated with the fans. no yellow card

    「在先前阿森納的比賽中范佩西同樣是進球后跳上場邊的護墻,並且來到球迷中與他們一同慶祝,當時克拉滕博格先生卻並沒有出示黃牌。 」
  11. On the base of the basic structure study of the tooth - locked quick closure vessel of middle and low pressure with crown head, the optimization method of parameterized whole device is presented in this paper, the emphases of research is put on optimization of the tooth - locked quick closure device whose structure and load distribution is complicated, the wall of vessel, however, is designed according to the existing strength formula

    本文對帶有球冠形封頭的中、低壓齒嚙式快開容器的基本結構進行研究的基礎上,提出了齒嚙式快開容器的參數化整體優化方法,研究重點放在結構和受力復雜的齒嚙式快開裝置的優化,對于容器簡體壁厚仍採用現有強度公式設計。
  12. The paper suggests that the load of middle wall of multi - arch tunnel be calculated according to arch structure in structure mechanics

    摘要提出了按拱結構計算雙連拱隧道中隔墻的荷載。
  13. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  14. On the base of site monitoring on several multi - arch highway tunnels, this paper introduces some site monitoring methods about the force of reinforcing steel bar, the exterior and interior strain of concrete and the displacement of the wall, which aim at the monitoring of middle wall of multi - arch highway tunnel

    在多座連拱隧道現場監測工作的基礎上,文章主要介紹了主筋軸力量測、混凝土表面應變量測、混凝土內部應變量測,以及位移量測等針對連拱隧道中隔墻的現場監測方法,並結合中隔墻主筋軸力量剛,給出現場監測及分析實例。
  15. The middle wall of a double - linked - arch tunnel is the key component of the structure ; it also has a great influence on waterproof and drainage of the tunnel, so it is very important to select the proper from of the middle wall

    摘要雙連拱隧道的中墻是結構受力的關鍵構件,又對隧道防排水有較大影響,因此,合理選用中墻形式至關重要。
  16. At last, an example of site monitoring about middle wall is given and some advice are suggested

    最後,對連拱隧道中隔墻現場監測提出了一些建議。
  17. Based on the moment balance principal in the statics, the method judging the middle wall stable or not is set up with an example calculated

    按照靜力學中的力矩平衡原理建立了中隔墻穩定與否的判別方法,並進行了實例計算。
  18. Finally some measures to maintain stability of middle wall are given, with a conclusion that the prop method is the best among all measures

    最後,提出了保持中隔墻穩定的若干措施,並認為保持中隔墻穩定的最佳方法是支撐法。
  19. As an important bearing structure, the middle wall in the multi arch tunnel, often dominates the success and safety of a project

    中隔墻作為連拱隧道的中樞結構和重要承載構件,其受力及位移情況往往對工程成敗和安全起著決定性作用。
  20. In this paper the different middle wall ' s mechanical behavior on different rock mass has been simulated by establishing the three - dimensional finite - element model of the shallow double - linked - arch tunnel, and the basic loading law of the middle wall is obtained, then the proper form of middle wall under different rock mass during constructing the shallow double - linked - arch tunnel is given, which offers foundation for the design of middle wall in double - linked - arch tunnel

    通過建立雙連拱隧道的三維有限元模型,模擬了不同圍巖級別條件下淺埋雙連拱隧道不同中墻形式的力學行為,得出了中墻的基本受力規律,提出了不同圍巖級別條件下修建淺埋雙連拱隧道所採用的合理中墻形式,為雙連拱隧道的中墻設計提供依據。
分享友人