mine dam 中文意思是什麼

mine dam 解釋
礦井防水墻
  • mine : pron 1 〈I 的物主代詞〉我的(東西),我的家屬,我的親戚。 The book is mine 這本書是我的。 He was ...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. An automatic safety monitoring system for the no. 2 tailings dam in dexing copper mine

    德興銅礦2號尾礦壩的安全自動監測系統
  2. Discussion on technical standard of mine flame proof seal dam

    煤礦防爆密閉墻技術標準探討
  3. Abstract : the control methods of tailing dam of wulongquan mine were introduced, some new techniques as recovery and utilization of the wash - or e tailings of limestones and dolomites, and draining seepage and solidification technology by radial well to reinforce the main dam were described in detail

    文摘:介紹了烏龍泉礦尾礦庫治理的具體方法,詳細地闡述了回收利用石灰石、白雲石洗礦尾礦的回收利用和採用輻射井排滲固結技術加固主壩等新工藝。
  4. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  5. Study on mechanical characteristics of tailing dam of a copper mine and stability analysis of tailing dam

    某銅礦尾礦砂力學特性研究和穩定性分析
  6. The trail dam is the important establishment in the mine production, which status influenced on safety of people " life and property

    尾礦庫是礦山生產中的重要設施,它的運行狀況的好壞直接危害到人民的生命和財產的安全。
  7. In view of the technical and safety problems ecnountered in the later - period management of shankoucun tailings dam in meishan iron mine, a series of technical measures were taken to lower the water - table of the dam. as a result, the service life of the tailings dam has been prolonged and the dam has been made to operate in a safe and stable way

    針對梅山鐵礦山口村尾礦庫在後期管理中遇到的技術、安全問題,通過採取一系列的技術措施,降低尾礦壩的浸潤線,達到了延長尾礦庫使用壽命,從而使山口村尾礦庫安全、穩定、順行。
  8. Soil properties of qingshan tailings dam of gushan iron mine and reclamation tac tics

    姑山鐵礦青山尾礦庫土壤特性與復墾策略
  9. The products are the raw material of polyurethane elastomer, coating and adhesives, which react with isocyanate to give a chemical grouting material that has been widely used for seepage - proofing and blocking up the loophole of tunnel, dam, underground projects and mine - pits, as well as foundation reinforcement

    本類產品為聚氨酯彈性體、塗料、粘結劑的原料,與異氰酸酯反應制得的化學灌漿材料,廣泛用於隧道、水壩、地下工程、礦坑層面的防水堵漏及建築物的地基加固。
  10. Research on three - dimension simulation of openpit mine tailing dam slope stability in panzhihua

    攀枝花露天礦排土場邊坡穩定性的三維數值模擬研究
  11. Site selection and design of the 2nd tailing dam of fushan iron mine

    符山鐵礦第二尾礦庫的選址與設計
  12. In this paper the author gives an account of various ways of passing the dam for hydropower station with tubular turbines during period of channel enclosure, for hydropower station of other type, this may also be of mine value for reference in dealing with navigation problem during construction period

    筆者對貫流式水電站的截流當中至船閘通航期間的過壩方式進行了討論,其對非貫流式水電站施工期通航問題也有一定的參考價值。
分享友人