mine engineering 中文意思是什麼

mine engineering 解釋
礦山工程
  • mine : pron 1 〈I 的物主代詞〉我的(東西),我的家屬,我的親戚。 The book is mine 這本書是我的。 He was ...
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. In this paper, we expound the application and the rational analysis of the displacement monitoring in the slope engineering via the inspecting the stability state of the east slope and. the north cuneiform geological mass in the ore dressing plant, dashan village of dexing copper mine in jiangxi

    本文通過對江西德興銅礦大山村選礦廠東部邊坡和北部楔形地質結構體穩定狀況的監測,闡述了在邊坡工程中位移監測的應用及有關分析。
  2. Research progress of soft rock engineering geomechanics in china coal mine

    軟巖工程地質力學研究進展
  3. Analysis on the reliability of the mine ventilation system based on human engineering

    基於人機工程學的礦井通風系統可靠性分析
  4. This paper probes into mining mode of metalliferous deposit based on the viewpoint of industrial ecology, in the hope of improving resources efficiency, eliminating the four big hazard sources which can bring negative environment impact due to mining of metalliferous deposit, avoiding " end - treatment " engineering needed when mine are closed, keeping integrated mine ' s ecosystem in the process of mining metalliferous deposit

    探討了基於工業生態學觀點的金屬礦床開采模式,以期提高資源效率,消除礦床開采對環境造成負面影響的4大危害源,消除礦山閉坑后的末端治理工程,使礦山在生產過程中保持礦區完整生態體系。
  5. Research on value engineering in material purchasing of coal mine

    煤礦物資采購價值工程分析研究
  6. Review is made on the results of two designs for the high pressure pregrouting at the stopes of the main shaft and the auxiliary shaft in an iron mine. one design took the geological characteristics as the basis and was strictly and scientifically made. with proper construction technical measures, it brough both good technical and economical effects to the grouting engineering. the another design was made in no consideration of practice. as a result, it brought avoidable losses to the engineering. its failure cause are analyzed

    評述某鐵礦主副井工作面高壓預注漿的兩種設計結果:一是以地質特點為依據,嚴格按科學設計,施工技術措施得當,給注漿施工帶來了良好的技術經濟效益;二是未從實際出發進行設計,給工程造成不應有的損失,剖析其失敗原因。
  7. To evaluate the mine engineering geological conditions and for making - up an engineering activity plan that guides the mine development, an engineering geological environmental analysis of aoshan mining area in nanshan mine, maanshan iron and steel co. was made. through rock property analysis, single factor analysis and comprehensive evaluation, the coordinability of various factors were determined

    為評價礦山工程地質狀況,指導礦山開發的工程活動規劃,開展了馬鋼南山礦凹山礦區的工程地質環境分析,通過巖性分析、單因素分析及綜合評價,得出各因素的可協調性結果。
  8. In order to make the best use of explosive energy in loosing soil or throwing it onto some area and ensuring the bottom meet some leveling requirements after blasting, a plane charge layout is often adopted according to blasting design and engineering quality requirements in open chamber blasting such as mine exploitation, field leveling and foundation pit excavation of construction

    摘要在礦山剝離、場地平整以及建(構)築物基坑開挖等露天爆破中,為了充分利用炸藥能量將巖石松動或拋擲到一定區域,並確保底板滿足一定平整度要求,按照爆破技術設計和工程質量要求,需要設計平面布藥結構。
  9. According to the research results of the rock quality calculation, the columnar section digitlizing, the rock mass structure diagnosis and other methods this paper used engineering limited parameters, basic structure and evolutionary structure of rock mass as the first grade indexes, proposed the technique of dynamic engineering classification of stability of mine road surrounding rock mass ? dec ?, pointed out the method of using dec results

    基於圍巖質量計算、柱狀圖數字化與重組、圍巖結構診斷、采動應力作用后圍巖結構演化等研究成果,採用工程要求、基本結構、演化結構」為一級指標,提出了巷道圍巖穩定性動態工程分類技術、分類結構的表達技術及分類結果的應用方法
  10. In this paper, based on the method of boolean manipulation and minimization algorithm in the independence minimal path sets, and applied reliability engineering theory, a new method is proposed for calculating reliability of mine ventilation network system

    摘要運用可靠性工程理論及不交型積之和定律,在大型網路系統可靠度計算的基礎上,提出了礦井通風網路系統最大線性無關最小獨立路集予以真子集滌除的不交化可靠度計算的實現方法。
  11. In foreign trade field, company focuses on the international engineering contract, project bidding, complete device exporting and other fields such as metallurgical machinery, mine machinery, universal machinery, light industrial machinery, hardware tools, foods machinery, steel structure workshop, water power station water power generator set, traffic, energy sources, communication, building materials, household apparatus and textile

    對外貿易以國際工程承包項目招標成套設備出口及冶金機械礦山機械通用機械輕工機械五金機械食品機械鋼結構廠房水力發電站水電機組火力發電站火電機組交通運輸能源通訊建築材料家用電器紡織品等領域為主。
  12. Abstract : in accordance with the engineering application practice, the key techniques of using ultra - sonic wave material level meter to measure the fine solid material in ore bins in an adverse enviroment of mine are described

    文摘:根據工程應用實踐,闡明了在礦山惡劣環境下,使用超聲波物位儀表來測量礦倉細粒級固體物料的關鍵性技術。
  13. Study on all position supervision in mine construction engineering

    礦山工程建設全方位監理的思考
  14. China mine engineering

    中國礦山工程
  15. In this paper, in the connection with optimizing of mine transportation vechile scheduling some theories, methods and models are researched in the instructor of system engineering, especially the vechile scheduling aiid genetic algorithm theory

    本文在系統工程特別是車輛調度和遺傳演算法的基礎理論指導下,針對礦山運輸車輛的調度優化問題,進行了一些理論、方法與模型的研究工作。
  16. Engineering - geological investigation of tailing pond in karst region : an example of banxia tailing of pingguo aluminium mine in guangxi

    以廣西平果鋁礦板下排泥庫為例
  17. Suitable for demanding to use various kinds of of the api cd sf grade oil to value load, high pressurized diesel engine, including various kinds of are domestic and importing the heavy - duty vehicle, engineering machinery, mine equipment and diesel oil generating set

    用途適用於要求使用api cd sf級油的各種重負荷高增壓柴油機,包括各種國產及進口重型車輛工程機械礦山設備和柴油發電機組。
  18. We discussed the main characteristic parameters of seismic kinesiology and dynamics of mine engineering fracture zone, including relative amplitude, phase time of wave crest, similarity factor, principal frequency band energy, 3 - d space time gradient and coherent coefficient et al., and puts forward the processing method of 3 - d seismic characteristic parameters about denoise - smoothing, generalization, correlation analysis, characteristic transformation ; and presents the method of pattern recognition of mine engineering fracture zone

    摘要本文從時間域、頻率域、三維空間域介紹了礦山工程裂隙破碎帶主要的地震運動學、動力學屬性參數,包括相對振幅、波峰相位時間、相似系數、主頻帶能量、二維空間時間梯度和相干系數等,提出了礦山工程裂隙破碎帶三維地震屬性的去噪平滑、歸一化、相關分析、特徵變換的處理方法以及裂隙破碎帶的模式識別原理與方法,並用實例說明了該方法的應用效果。
  19. Several issues to be considered such as adaptability, safety, interface and ancillary works in process of design logistic system for mine engineering project were discussed by combined experience in mine logistics system design with mine safety operation management and technology development state

    摘要結合多年礦山物流系統設計的經驗,從有利於礦山安全生產管理並結合目前礦山技術發展的現狀討論了礦山工程設計中物流系統的適應性、安全保障、系統的介面以及物流系統中的輔助作業等問題。
  20. The acticle passes the actual working experience of drilling bole explore for open coal mine engineering geology explain simbly a few problems of the dumping site leave thing layer meet with drilling hole explore, probe detailed the treatise and the technique meathod to. solve these problems

    摘要通過對露天煤礦排土場工程地質鉆孔勘探的實際工作經驗,簡要闡明了露天煤礦排土場排棄物層在鉆探過程中經常遇到的幾個問題,詳細論述了解決問題所應採取的技術方法與措施。
分享友人