mine section 中文意思是什麼

mine section 解釋
采礦區段
  • mine : pron 1 〈I 的物主代詞〉我的(東西),我的家屬,我的親戚。 The book is mine 這本書是我的。 He was ...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. I section steels and fish plates for mine

    礦山用工字形鋼及魚尾板
  2. In the aspect of application research, through analyzing the existing state and selection - smelting feature of iron, titanium and vanadium which were mainly applied elements in panzhihua vanadic titano - magnetite deposit, the mine - exploding mode of zhujiabaobao section could be figured out by combining the rhythmic change feature of ore chemical composition, mineral composition and content and mineral chemical composition

    在應用研究方面,通過分析攀枝花釩鈦磁鐵礦主要利用元素鐵、鈦、釩的賦存狀態及選冶特性,結合礦石化學成分、礦物成分及含量、礦物化學成分呈韻律式變化這一特徵,建立了朱家包包礦段的開采模型。
  3. Through the analysis of hydrological yeologys features by analyzing the gielding water of mining section, the critical value of waterhead, the critical thickness of water - resisting layer and othr hydrological geology factors concerned, the researches on the feasibility of the extraction of eastern mine area liyi mine at - 660m under ground with the menance of high - level limestone water have been done

    主要通過水文地質特徵分析,從采區涌水量、臨界水頭值及臨界隔水層厚度及相關的水文地質因素對李一礦- 660m水平東翼采區在高水位灰巖水威脅下開採的可行性進行了研究。
  4. Air cannon block clearer is a special device used to prevent and remove the material blast and block of all kinds of bunker, hopper, cement preheating furnace, pipeline y section and mine drawshaft and drawslope

    空氣炮清堵器是防止和消除各類型料倉,料斗、水泥預熱器窯和管道分叉處及礦山溜井、溜坡的物料起拱,粘倉閉塞等現象的專用裝置。
  5. According to the research results of the rock quality calculation, the columnar section digitlizing, the rock mass structure diagnosis and other methods this paper used engineering limited parameters, basic structure and evolutionary structure of rock mass as the first grade indexes, proposed the technique of dynamic engineering classification of stability of mine road surrounding rock mass ? dec ?, pointed out the method of using dec results

    基於圍巖質量計算、柱狀圖數字化與重組、圍巖結構診斷、采動應力作用后圍巖結構演化等研究成果,採用工程要求、基本結構、演化結構」為一級指標,提出了巷道圍巖穩定性動態工程分類技術、分類結構的表達技術及分類結果的應用方法
  6. The automatic control system of green balling section in daye iron ore mine pelletizing plant

    大冶鐵礦球團廠造球工段自動控制系統
  7. Technical condition of h - section steel rigid suport in ladder - shape used in coal mine

    礦用工字鋼梯形鋼性支架技術條件
  8. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗斜井採用小斷面導硐后刷大、高負壓多排鉆強抽,密集交叉鉆孔邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  9. Practices on rapid construction in freezing section of auxiliary shaft in suntong mine

    孫疃煤礦副井凍結段快速施工實踐
  10. A summary introduction is made of the electrovibrating ore - drawing techniques that have been used in shizishan copper mine, which includes the electrovibrating ore drawing of the ore pass in middle section, the one for in - stope ore drawing, the one for the main underground ore bin and the one for the coarse ore bin in the concentrator

    針對獅子山銅礦應用中的幾種電振動放礦技術進行了總結性介紹,它們分別是:中段溜井電振動放礦、采場內電振動放礦、坑下主礦倉電振動放礦、選礦廠粗礦倉電振動放礦。
  11. This paper introduces the situation of mine earthquake happened in the uptown in tongjialiang mine and the geological condition, probes into the working principles and procedures of transient electromagnetic method and high - density resistivity method, determines the worked - out section and worked - out scope

    介紹了同家梁礦住宅區發生礦震的情況和地質概況,探討了瞬變電磁法、高密度電阻率法的工作原理和程序,確定了礦震區域的采空層位和采空范圍。
  12. Very early, after aunt which sweeps the floor is pushed awakes. 13year - old i started the long vagabond ' s life. this section drifts thelife india deepest is also farthest in mine mind

    一大早,被掃地的阿姨推醒過來后。 13歲的我就開始了漫長的流浪生活。這段漂泊的生活在我的腦海里印得最深也最遠。
  13. Abstract : based on the simulated laboratory experiment of pressure balance for fire extinguishing, the pressure regulating technique in the burning section of meiyukou coal mine is summarized

    文摘:在采場均壓防滅火實驗室模型模擬實驗的基礎上,總結了煤峪口礦現場實施火區的調壓工藝技術。
  14. Code for design of roadway section and junction of coal mine

    煤礦礦井巷道斷面及交叉點設計規范
  15. Research on support technology for mine large cross section soft rock roadway in high stressed broken zone

    高應力破碎帶松軟巖層大斷面巷道支護技術研究
  16. Outer wall failure treatment for ground freezing section of mine main shaft in getting mine

    葛亭煤礦主井井筒凍結段外壁破壞治理
  17. Multi - hierarchical, multimeans, comprehensive and deepened research on the macrofractures, microfractures system and pores system features, capacity of cbm storage and osmosis, adsorption characteristic, as well as physical properties of surrounding rocks of coal reservoirs have been made. furthermore, classifying standard and identifying characteristics for fractures - pores system of low coal rank coal reservoirs in zhungaer basin has been put forward as well. in this process, some routine instrument are used, such as viewing coal mine scene and hand specimen, observing polished section and surface which are made from lump coal and powder coal samples, observing and image analyses under the common microscope ' s transmitted light, reflection light and fluorescence

    通過礦井現場、鏡下觀察統計等常規手段,採用多種先進儀器和測試技術展開對煤儲層的裂隙系統與孔隙系統發育特徵、儲滲性能、吸附特性及煤儲層圍巖物性特徵的多層次、多手段分析,並綜合室內外觀測及前人成果,提出了煤儲層裂隙與孔隙系統的劃分標準與識別特徵,分別從宏微觀尺度、定性與定量層次對裂隙與孔隙系統特徵及其與煤儲層儲滲性能關系的研究。
  18. Research on big cross section structure parametres in underground mine of gongchangling base on sls system

    系統的弓長嶺井下礦大斷面結構參數應用研究
  19. Nonferrous metals mine section

    有色金屬礦山部分
  20. Mined - out area treatment and ground pressure monitoring for the no. 100 orebody in gaofeng mine section

    高峰礦區100號礦體采空區治理與地壓監測研究
分享友人