nanjing yangtze river bridge 中文意思是什麼

nanjing yangtze river bridge 解釋
南京長江大橋
  • nanjing : 建康府
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Finally, the fatigue equation and axle load conversion are applied to forecast the steel bridge deck pavement ' s service life of nanjing second yangtze river bridge

    結合南京長江第二大橋鋼橋面鋪裝工程,應用所建立的疲勞性能方程以及軸載換算公式對鋼橋面鋪裝層使用壽命進行預測。
  2. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  3. Stablity analysis of the second nanjing yangtze river cable - stayed bridge during construction

    南京長江二橋斜拉橋施工過程穩定性分析
  4. Structural safety monitoring system for the second nanjing yangtze river bridge

    南京長江第二大橋結構安全監測系統
  5. Finally, nanjing yangtze river bridge on peking - shanghai high speed railway which is a three - pylon cable - stayed bridge is analyzed. in buffeting analysis, analysis result in time domain is compared with that in frequency domain. the effects of pylon wind speed field and nonlinear factors are taken into account

    最後,以京滬高速鐵路南京長江大橋為工程背景,比較了橋梁時域抖振分析和頻域抖振分析的一致性,分析了橋塔風效應和非線性因素對結構抖振響應的影響。
分享友人