normal square 中文意思是什麼

normal square 解釋
矩規
  • normal : adj 1 正常的,平常的,普通的;平均的。2 正規的,標準的,額定的,規定的。3 智力正常的,精神健全的...
  • square : n 1 正方形,四方塊,四角;方形物。2 (方形)廣場;〈美國〉(四面都是馬路的)方陣建築;街區;(方...
  1. The company has normal production factory building, office building, biotope, dormitory building now, cover an area of 10000 square meters

    公司現擁有規范的生產廠房、辦公樓、生活區、宿舍樓,佔地面積10000平方米。
  2. Standard deviation in statistics, a measure of the dispersion of a frequency distribution : it is the average magnitude of deviations from the center of normal curve, calculated by squaring all the deviations, calculating their mean, then finding the square root of the mean

    標準偏差:統計中,一種衡量數據組分佈的分散或變化情況的數據,是偏離正態分佈中間位置數據大小的平均值。
  3. Starting united both at normal walking pace from beresford place they followed in the order named lower and middle gardiner streets and mountjoy square, west : then, at reduced pace, each bearing left, gardiner s place by an inadvertance as far as the farther corner of temple street, north : then at reduced pace with interruptions of halt, bearing right, temple street, north, as far as hardwicke place

    他們都是用正常的步行速度從貝雷斯福德廣場出發,按照下中加德納街的順序走到蒙喬伊廣場西端。隨後放慢步伐一道向左拐,漫不經心地來到加德納廣場盡頭,這里是通向北邊坦普爾街的交叉口。隨后朝右拐,時而停下腳步,緩慢地沿著但普爾街往北走去,一直來到哈德威克街1 。
  4. Applied the robust estimation theory, it is made a new improved least square method. combined the normal distribution and the laplace distribution, there is created a new distribution model uber distribution in the paper, it is improved the method of the gross location and parameter estimation and is cleared out efficiently the gross error ' s effect for dam safety monitoring model

    應用抗差估計理論,提出一種抗差最小二乘改進法,結合正態分佈和拉普拉斯分佈,建立新的分佈模式? huber分佈,改進了粗差定位和參數估計的方法,有效地消除粗差對監控模型的影響。
  5. Cost models of reliability growth of equipments are built, and the results show that partial least - square regression is more capable of building cost models reflecting correct relations among multivariables compared with normal multi - variable regression method

    結果表明,與一般的多元回歸分析相比,偏最小二乘回歸分析避免了自變量之間多重相關性帶來的問題,能夠得到與實際經驗相符合的模型。
  6. Unlike the normal two stages estimate method ( the usual nonparametric weighted method combined with the least square estimate ), considering the characteristics of this model, this paper uses the least square estimate combining with the usual nonparametric weighted method and defines the estimators and n2 for the unknown parameter, the unkown fuction g ( ) and the unknown variance of errors 2

    與通常採用的兩階段估計方法即非參數權函數法結合最小二乘法不同,考慮到此模型本身的特性,本文採用最小二乘法結合一般非參數權函數估計方法,定義了未知待估參數和未知函數g ( ? )及誤差方差~ 2的估計量( ? ) _ n , ( ? ) _ n ( ? )和(
  7. The paper has improved the existing lifting - line and lifting - surface design method by including the rake and skew and solving the optimum circulation distribution with the optimum theory. the blade geometry is expressed with b - spline for the lift - surface method. the boundary condition on the blade is transformed to minimize the summation of the square of normal velocities, the fair blade geometry can be obtained by present technique and the design quality is better

    改進了現有的升力線和升力面設計方法,在升力線設計中計及槳葉的縱傾和側斜的影響,用優化理論求解最佳環量分佈,升力面設計中用b樣條來擬合槳葉,將物面邊界條件轉化為求法向速度分量的平方最小,由此可得到光順的槳葉幾何形狀,提高和改進了設計質量。
  8. In the fifteenth periods, shenyang came into the hot business investment, only in 2005, business item of above 5 million dollars reached to 517s, total amount to 16, 400 million dollars, in the whole city, various industry more than 10 thousand square meters reached to 32s. you can see from this, with continuously increase of economy, the competition of of company will be more more strong, competition between retail trade companies as the characteristic of price war will turn white - hot further, various price war of all sorts of strange things ca n ' t avoid. in this case, for zhongxing commercial building co., ltd, how can cope with these challenges, under the premise that do not influence normal profits of business enterprise fight for customers, keep customers, keeps it currently the share and positon in the market becomes the important mission that to pay attention to

    「十五」期間,沈陽形成了商業投資熱,僅2005年新引進500萬元以上商業項目達517個,投資總額164億元,全市超過一萬平方米以上的各種業態達32家。由此可見,隨著沈陽經濟的不斷增長,商圈之間的競爭必然愈演愈烈,以價格戰為特徵的零售業之間的競爭將進一步白熱化,各種千奇百怪、花樣翻新的價格大戰不可避免。在這種情況下,中興大廈如何能應付這些挑戰,在不影響企業正常利潤的前提下爭取客戶,留住客戶,保持其在目前沈陽市場的佔有率與現有的沈陽零售業航母的地位便成為要關注的重要任務。
  9. The leading products have large - scale stainless steel sculpture of junan culture square, nine dragon pillar of feicheng square, relief sculpture of civilized sage in linyi normal college, sculpture of sun and moons mountain in juxian culture square, group sculpture of jiangsu eighty - two revolutionary martyrs museum and all of them was commanded as fine engineerings

    公司設計營建的莒南文化廣場大型不銹鋼雕塑肥城廣場九柱臨沂師范學院文明之聖浮雕莒縣文化廣場日月山雕塑江蘇八十二烈士紀念館群雕,均被評為優良工程。
  10. First, the system operation conditions that include three input types ( square, sinuous and triangle ) with different frequencies ( l / 250hz, l / 5hz and 1hz ) are discussed. in fault detection processes, we construct 4 three - layer bp neural networks to learn the normal states of the system. the outputs of trained neural networks are as the estimate values of the sensors

    本文詳細研究了在這種情況下的故障診斷問題,針對某液壓系統,分析了系統在方波輸入、正弦輸入、鋸齒波輸入下,分別在正常工作頻率、極限工作頻率以及接近極限工作頻率等9種工作狀態的特性,以及在這9種工作狀態下,運用神經網路觀測器進行傳感器故障診斷研究。
  11. 3 a novel recursive least - square ( rls ) blind space - time receiver algorithm based on the constrained condition, which can completely avoid the matrix inversion introduced into by constraints ( comparing with the normal rls ), is proposed for multi - path slow fading cdma channels. the computational complexity of this method is not only lower than that of the normal rls, but also lower than that of both lms and ls blind space - time receiver methods that are realized based on the rosen ' s gradient projection. and the speed of convergence of the presented rls blind space - time receiver algorithm is better than that of both lms and ls blind space - time receiver methods

    3 、針對多徑慢衰落通道下ds - cdma盲空時接收機中線性約束二次規劃問題提出一種新的遞歸最小二乘演算法,該演算法完全避免因約束而引進的矩陣求逆運算(相對于常規的遞歸最小二乘演算法) ,不但運算量比常規的要低,而且比基於rosen梯度投影實現的最小均方( lms )與最小二乘盲空時接收機演算法還低,且收斂速度比基於rosen梯度投影實現的最小均方( lms )與最小二乘盲空時多用戶檢測都好,將提出的新的遞歸最小二乘演算法與提出的數據選擇方案結合起來可以進一步降低其運算量,具有很大的實用價值,最後通過模擬實驗進一步分析了其性能。
  12. Heal hind watchs half an year, apparently clinical symptom is not had inside half an year, 3 months make every other liver function examination, successive 3 all normal when square recoverable original work

    痊癒后觀察半年,半年內無明顯臨床癥狀,每隔3個月作肝功能檢查,連續3次均正常時方可恢復原工作。
  13. From dalian, liaoning normal college, studied flute for one year. like listening songs, swimming and square stroll

    來自大連,遼寧師范大學,學習長笛一年。愛好聽歌游泳漫步廣場。
  14. Sine wave for normal power supply, stage square wave for battery power supply

    市電供電為正弦波,電池供電為階梯波
  15. The six sigma black belt should be familiar with the commonly used probability, including : hypergeometric, binomial, poisson, normal, exponential, chi - square, student ' s t, and f

    譯文:六西格瑪黑帶應該熟悉常用的概率分佈,包括超幾何分佈、二項式分佈、泊松分佈、下態分佈、指數分佈、卡方分佈、學者t分佈和f分佈。
  16. The six sigma black belt should be familiar with the commonly used probability distributions, including : hypergeometric, binomial, poisson, normal, exponential, chi - square, student ' s t, and f

    6西格瑪黑帶應熟悉常用的概率分佈,包括超幾何分佈、二項式分佈、泊松分佈、正態分佈、指數分佈、卡方分佈、學者t分佈和f分佈。
  17. In first chapter, we define the first stage estimators for 0 and g by using kernel weight function, least square and two stage estimation under the additivity of the model, and then the paper proves that is the consistency and the approximate normal distribution, and is the consistency and the uniform consistency

    第一章首先綜合核函數法,最小二乘法,基於模型的可加性,利用二階段估計的方法求出, g的第一階段估計量,然後證明了的強相合性與漸近正態性, g _ n ~ *的強相合性和一致強相合性。
  18. In second chapter, we obtain the second stage estimators for 0 and g with the first stage estimators by using generated least square th at is used in ev model. the second stage estimators are better than the first stage ones concerning variance, and meantime the paper proves that is the consistencey and the approximate normal distribution and gn is the consistency and the uniform consistency

    第二章首先在第一階段估計的基礎上,針對ev模型利用廣義最小二乘法求出, g的第二階段估計,這樣從誤差方差的角度來考慮,第二階段估計結果比第一階段估計結果改進了一步。
  19. First, this paper introduces the difference of all - power radiometer and dicke radiometer sensitivity, and gives normal calibration equation and periodic calibration equation of antenna temperature, and analyses calibration error due to square - law detector illinearity

    本文在總結前人研究工作的基礎上,首先比較了全功率輻射計和迪克型輻射計的靈敏度,討論了輻射計天線溫度的反演和周期定標技術,分析了檢波器非線性特性對輻射計定標結果的影響。
  20. Rectangular, square, runner, oval and round are normal shapes of silk carpets

    真絲地毯一般分為長方形,正方形,長條形,橢圓形,圓形。
分享友人