observation mine 中文意思是什麼

observation mine 解釋
視發水雷
  • observation : n 1 觀察,注意;觀察力;?望。2 觀測,實測;【航海】測天;【軍事】觀測,監視,偵察。3 (觀察得的)...
  • mine : pron 1 〈I 的物主代詞〉我的(東西),我的家屬,我的親戚。 The book is mine 這本書是我的。 He was ...
  1. Clinical observation on the results in treatment of recurrent or refractory non - hopkin ' s lymphoma with mine scheme

    方案治療難治性侵襲性非霍奇金淋巴瘤的臨床研究
  2. With observation on the resistance of zwm - type grid - shaped walking hydraulic support on no. 7177 working face of kongzhuang coal mine, the load - carrying properties are analysised, measures for raising usage rate of the support working resistance have been put forward

    通過觀測孔莊礦井7177工作面zwm網格式液壓邁步放頂煤支架的阻力,分析了支架承載特性,提出了提高支架工作阻力利用率措施。
  3. Through inversion analyzing the results of inspection and observation which was applied the multipoint displacement measures and the drilling anchor stress measures to the top surface in the xianggui gypsummine eastern workings, this article will attempt to propose the deformation law of stope terrane after the underwater mine area, which provided a reliable basis for taking measures to control the strata movement

    摘要為了研究湘桂石膏礦的巖體變形規律,對該礦東采區頂板巖孔多點位移計觀測和鉆孔錨桿應力計檢測的結果進行綜合反演分析,提出了水下礦區開挖后采場巖層的變形規律,為採取有效措施控制巖層移動提供了依據。
  4. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  5. Observation and analysis of blasting vibration on the north high slope of jinduicheng open pit mine

    金堆城露天礦北幫振動觀測與分析
  6. Analysis of observation data of surface subsidence and deformation in shanjiaoshu mine

    山腳樹礦地表移動變形觀測資料分析
  7. Abstract to evaluate the effect of the deep hole blast on the villages 200 m away from malanzhuang iron mine, the observation of the blast vibration in malanzhuang iron mine was made , the propagation law of the blast - caused seismic wave, the seismic wave superimposition of short - delay blasting and the affect of blast vibration on the residents psychology are analyzed. the method and measures for reducing the blast vibration are suggested

    為評價馬蘭莊鐵礦深孔爆破對采場200m外村莊的影響,對馬蘭莊鐵礦爆破震動進行了觀測,分析了爆破地震波傳播規律,微差爆破地震波疊加情況及爆破震動對居民心理的影響等,提出了減少爆破震動的方法和措施。
  8. Based on the in - situ observation of the firstly mined working face of nanliang coal mine, the roof movement, the roof weighting intensity, and entry deformation and failure of the working face were analyzed

    摘要通過南梁煤礦首采工作面采前的實驗研究和開采時的現場觀測,分析了工作面頂板的移動、來壓強度以及巷道變形破壞情況,總結了厚黏土覆蓋層淺埋煤層單體長壁工作面的礦壓顯現規律。
  9. Through analyzing on the field observation data of 2307 mining face of chengzhuang coal mine, this paper probes into the surface movement regularity and relevant strata movement parameters of 2307 comprehensive mechanized workface after mining, and obtains some corresponding conclusions

    通過對成莊礦2307工作面現場觀測數據的分析,探討了2307綜放工作面開采后的地表移動規律和有關巖移參數,並得出了相應結論。
分享友人