on-site concrete 中文意思是什麼

on-site concrete 解釋
現澆混凝土
  • on : adv 1 〈接觸、覆蓋〉上去;開(opp off)。 turn on the light [radio water gas] 開電燈[收音機、自來...
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  1. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  2. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具有結構新、工藝復雜、體積大、運輸困難,將常規鐵路的橋梁廠製造橋梁、經過鐵路運梁到工地、邊鋪邊架進行橋梁製造與架設的傳統施工模式應用到該線是行不通的,必須在現場預制橋梁、並採用專門的運架梁設備進行橋梁架設,因此箱梁的製造、架設施工成為該線施工技術攻關的重點和難點。
  3. Bending strength, compressive strength, interfacial bond strength and frost - resistance are also studied and analyzed. based on indoor research, on - site experiments are conducted on damaged pavement to inspect the performance of repairing concrete

    在室內試驗研究的基礎上,進行了破損路面的工程修補試驗,對修補混凝土的修補效果進行了觀測。
  4. Concrete structural member in the work ( excluding lintel for window & door ) shall be cast on site with strength of c40

    2本工程鋼筋混凝土結構構件(除門窗過梁外)均為現場澆搗,混凝土強度等級均為c40 。
  5. Focusing on above analysis and basic quality sustainable improvement theory and various quality sustainable improvement tools, from three aspects this paper describes tank shop ' s vivid and dramatic quality sustainable improvement approach. first, in conjunction with tank shop concrete production processing follow, strengthen employee ' s quality sense, self - inspection and mutual inspection through use of scientific inspection card covering tank shop whole production chain ; second, adopt scientific work site management 5s featuring tank shop concrete situation and work site inspection card to strengthen tank shop bottom management ; third, take full advantage of various quality tools to actively and efficiently improve tank shop processes, especially those processes which have serious influence to assembled product, frequently produce non - conformance products and seriously restrict whole tank efficiency improvement

    第一,結合車間產品具體的加工工藝流程,採用科學的涵蓋車間產品整個製造過程的質量檢驗卡增強員工的質量意識、加強員工的自檢和互檢;第二,運用科學的現場管理5s法並結合油箱車間生產的具體情況,採用科學合理的車間現場檢驗卡,加強車間的基礎管理;第三,充分運用各種質量持續改進工具對油箱車間生產的各個過程,特別是對整個產品質量有重大影響的關鍵過程、經常出現產品不合格記錄的過程和那些制約著整個油箱車間生產效率提高的過程進行積極的,有效的質量持續改進活動。
  6. The results indicate that shear resistance of composite beam accounts for 1. 0 ~ 1. 14 times of that of cast - on - site concrete beam

    該分析結果表明,疊合梁的斜截面承載力是整澆梁的1 . 00 ~ 1 . 14倍。
  7. Research on commercial concrete shrinking in site plates

    現澆商品混凝土樓板收縮變形研究
  8. On - site plants ensure that the number of trips and the distance travelled by vehicles transporting raw materials and concrete is minimised, thus reducing potential environmental pollution and impact on road traffic

    這樣可減少因運送原料及混凝土所需的車程及行車距離,從而減低對環境及交通造成的影響。
  9. Finally, for a practical project, an experiment of temperature field of a cubic concrete block is made on construction site and the back analysis for unknown parameters is carried out

    結合實際工程,在工程現場進行了立方體混凝土塊溫升試驗和用有限元對其某些溫度特性參數進行了反演分析。
  10. 4. the elementary analysis about the geometrical parameter influences of plate thickness and breadth of rib beam on mechanical properties of the thin - wall core box cast - in - site concrete hollow floor is also made. a single geometrical parameter on mechanical properties of such floor system is set forth and the fitting scale for these parameters is determined to provide the reference when designing

    4 、對影響薄壁箱體現澆混凝土空心樓蓋內力和變形的板邊梁寬度、肋寬、肋間距、板厚等因素進行了分析,討論了單一幾何參數對該樓蓋受力性能的影響規律,提出這些參數適宜取值范圍,為對這種樓蓋進行設計時提供參考。
  11. On the base of site monitoring on several multi - arch highway tunnels, this paper introduces some site monitoring methods about the force of reinforcing steel bar, the exterior and interior strain of concrete and the displacement of the wall, which aim at the monitoring of middle wall of multi - arch highway tunnel

    在多座連拱隧道現場監測工作的基礎上,文章主要介紹了主筋軸力量測、混凝土表面應變量測、混凝土內部應變量測,以及位移量測等針對連拱隧道中隔墻的現場監測方法,並結合中隔墻主筋軸力量剛,給出現場監測及分析實例。
  12. Depending on the outcome of our detailed design, there might be a need for concrete counter - weights connected to the main girder. these are assumed to be made on site

    根據詳細設計的結果,可能需要在主樑上加混凝土配重。配重考慮在現場製作。
  13. An outside keeping temperature system on the outside concrete wall made on - site of high - rise housing

    高層住宅現澆混凝土外墻外保溫體系
  14. On - site treatment of some defective piles for 120 meter - high reinforced concrete stack

    高鋼筋混凝土煙囪部分樁身失效后的現場處理
  15. This paper also gives the method of spreading steel fiber by layering on site, which can be widely applied in product concrete at present

    針對廣泛應用的商品混凝土,提出現場分層鋪撒鋼纖維的施工方法。
  16. Combined with a project financially supported by the construction bureau of hunan province, some studies on this floor have been carried out in this thesis. the valuable results achieved are outlined as below : 1. compared with the current concrete criterion, a method for the stiffness of thin - wall core box cast - in - site concrete hollow floor which is analyzed in this thesis is proposed

    本文結合湖南省建設廳重點資助項目對薄壁箱體現澆混凝土空心樓蓋進行研究,取得了的研究成果,如下: 1 、對薄壁箱體現澆混凝土空心樓蓋的剛度進行了分析,以《混凝土結構設計規范》為基礎,提出了現澆空心樓蓋剛度和內力的簡化計算方法,其計算結果與已有的試驗結果吻合良好,使樓蓋內力和變形的計算過程得以簡化。
  17. To prove the applicability of respective regression equation, the essay adopt regression analysis to test the accordance of samples and find the testing report accords with the predicating one. to test the applicability and practical usage of the intensity curved line in boutou, we test the concrete items on site, and compare it with standard curved line in my country, and the consequence shows that : the intensity curved line of the comprehensive method of ultrasonic elasticity has high applicability and accuracy

    為了更好的檢驗回歸所得到的超聲回彈綜合法測強曲線方程在包頭地區的適用性和實用性,我們特地進行了工程現場混凝土構件強度的檢測試驗,並且和全國的基準曲線方程相比較,得到的數據顯示:我們由試驗得到的超聲回彈綜合法測強曲線方程在包頭地區有很好的實用性和適用性,精度相對較高。
  18. Construction of on site pouring reinforcement concrete continuous beams of chongqing longquan avenue overpass

    重慶龍泉路立交橋現澆鋼筋混凝土連續梁施工
  19. On - site concrete batching plants are required to ensure a continuous supply of concrete for west rail construction

    西鐵于工地設置混凝土廠,以確保在進行大型混凝土工程(如為大型樁柱灌槳)時有穩定的混凝土供應,滿足工程需要。
  20. However, if works are not carried out on site for some technical reasons, such as pipe testing in progress, concrete curing or inclement weather, etc. the contractor should display a notice board on site stating the reasons for site idling

    但若因技術原故,如須對喉管進行測試、鋪設的混凝土須時養護或天氣惡劣等情況,出現在工程期間工地無人工作的現象,承建商須于工地放置展示牌,說明無人工作的原因。
分享友人