operations schedule 中文意思是什麼

operations schedule 解釋
操作(進度)表, 作業(進度)表, 工序卡
  • operations : 操作設置
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. Dock operations ( e. g., capacity of preparation areas, loading bays, limits of loading and unloading, rules of freight capacity, schedule of dispatch handling ) are optimized, using scheduled window times and carrier on - time performance is tracked

    裝卸操作(例如,準備區域,裝載區,極限的裝卸貨的容量,貨物容量的規則,分派處理的計劃)優化,使用計劃時間表,跟蹤準時運輸情況。
  2. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,技術力量十分雄厚,工程技術人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構設備模板跳板油罐水罐管道工程各種型號除塵環保設備,再如橋梁鋼筋混凝土建築,水下高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  3. Without the operation qualification for international liner shipping a party may not engage in the business operations of international liner shipping, and may not release the schedule to the public or accept booking for shipping space

    未取得國際班輪運輸經營資格的,不得從事國際班輪運輸經營活動,不得對外公布班期、接受訂艙。
  4. Schedule of construction ; schedule of operations

    施工進度表
  5. Manugisticss transportation and distribution route plan can build up routes for daily operations, and set up the plan of main shift schedule during each plan cycle

    Manugistics的運輸配送路徑規劃,能建立每日運作的路徑,並且於各計畫周期中設定主班表規劃。
  6. The key to jit operations is that the demand for components and materials depends on the finalized production schedule

    準時製作業的關鍵是對配件和物料的需求根據最終生產進度來決定。
分享友人